Summary of 960502 Telcon W/Licensee Re Design/Licensing Basis Questions on Plant & Turbine Bldg Blowout Panels That Were Encl W/Insp Rept 50-220/96-05 & 50-410/96-05,dtd 960329
ML17059B127
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 05/08/1996
From: Hood D
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9605130415
Download: ML17059B127 (22)


Text

~R R500 A.

jk

~

O I

O e

Y/

/p qO

++*++

,UNITEP STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 8, 1996 LICENSEE:

Niagara Hohawk Power Corporation FACILITY:

Nine Mile Point Nuclear Station, Unit

SUMMARY:

SUMMARY OF TELEPHONE CONVERSATION OF MAY 2, 1996, ON REACTOR AND TURBINE BUILDING BLOMOUT PANELS On Hay 2, 1996, the NRC staff discussed, via telephone, the design/licensing basis questions on the Nine Hile Point, Unit 1, Reactor and Turbine Building blowout panels that were enclosed with NRC Special Inspection Report No. 50-220/96; 50-410/96-05, dated March 29, 1996.

Participants for the NRC staff were H. Hartzman, D. Jeng, M. Long, and D. Hood.

Participants for the licensee included C. Terry and several others.

To support the discussions, the licensee faxed the enclosed information to the.

NRC staff.

During the call, the NRC staff provided further clarification of the questions.

The licensee is performing further evaluations and anticipates further interim discussion with the staff prior to providing final written responses.

Specifically:

1.

The licensee is refining its modeling of the blowout panels to account for two-way action of the panels.

This will include the panel membrane deformation effects on the upper-bound panel failure pressure capacity.

2.

3.

The licensee is examining the American Institute of Steel Construction design and test data that forms the basis for its shear-tension interaction formula and plans to use test based upper-bound bolt strengths, both shear and tension, in determining the upper-bound panel failure pressure.

The licensee is also considering testing of several bolts to determine their upper-bound shear capacities.

The licensee is performing a more realistic panel failure capacity analysis that uses realistic models and takes into account the actual panel/bolt response to an increasing pressure load, as well as the panel/bolt deformation from its initial yield through redistribution of bolt loads till the final failure of the panel.

Licensee acknowledges that use of an appropriate non-linear/large deformation finite element code might be needed to achieve the analysis objective.

The licensee acknowledged that some questions not included in the March 29, 1996, Inspection Report, but raised during the conference of April 12, 1996, will also be addressed in the written responses.

9605i30415 9h0508 PDR ADGCK 05000220 P

PDR

~

~

~

4 htt r

I"4

";j

The licensee currently anticipates that further telephone discussions with the staff regarding status of the evaluations may be appropriate in about 2 weeks.

Docket Nos.

50-220 and 50-410 Enclosure:

As stated cc w/encl:

See next page Darl S.

Hood, Senior Project Hanager Project Directorate I-I Division of Reactor Projects -I/II Office of Nuclear Reactor Regulation

F Niagara Mohawk Powe orporation

~ 'C:

Hr. B. Ralph Sylvia Executive Vice President and Chief Nuclear Officer Niagara Mohawk Power Corporation Generation Business Group D-2 300 Erie Boulevard West Syracuse, NY 13202 Hr. Richard B. Abbott Vice President and General Hanager-Nuclear Niagara Mohawk Power Corporation Nine Hile Point Nuclear Station P.O.

Box 63 Lycoming, NY 13093 Mr. Martin J.

McCormick, Jr.

Vice President Nuclear Safety Assessment and Support Niagara Hohawk Power Corporation Nine Mile Point Nuclear Station P.O.

Box 63 Lycoming, NY 13093 Hr. Kim A. Dahlberg General Hanager Projects Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.

Box 63 Lycoming, NY 13093 Mr. Norman L. Rademacher Plant Manager, Unit

Nine Mile Point Nuclear Station P.O.

Box 63 Lycoming, NY 13093 Hr. John T. Conway Plant Manager, Unit 2 Nine Mile Point Nuclear Station P.O.

Box 63 Lycoming, NY 13093 Hs. Denise J. Wolniak Manager Licensing Niagara Mohawk Power Corporation Nine Hile Point Nuclear Station P.O.

Box 63 Lycoming, NY 13093 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Nine Hile ~nt Nuclear Station Unit Nos. ~nd

Resident Inspector U. S. Nuclear Regulatory Commission P.O.

Box 126 Lycoming, NY 13093 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Hr. Richard H. Kessel Chair and Executive Director State Consumer Protection Board 99 Washington Avenue Albany,,

NY 12210 Hr. Paul D.

Eddy State of New York Department of Public Service Power Division, System Operations 3 Empire State Plaza Albany, NY 12223 Mark J. Wetterhahn, Esquire Winston 8 Strawn 1400 L Street, NW Washington, DC 20005-3502 Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West Syracuse, NY 13202 Mr. F. William Valentino, President New York State Energy, Research, and Development Authority 2 Rockefeller Plaza Albany, NY 12223-1253 Hr. Richard Goldsmith Syracuse University College of Law E. I. White Hall Campus Syracuse, NY 12223 Mr. John V. Vinquist, WATS Inc.

P.O.

Box 63 Lycoming, NY 13093 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126

l I

j1 I'

P. 02 19'-2"

EI 3S4-0" 19e 2H rrr r r r

rr CD (7 e

'l

~I

~er I KXPANEL~P)

r r

rr rr rr r'BL. 33S'- 10 1/2 57'-B" REACTOR BUILDINGPRESSURE RELIEF WALLPANELS VA

T 2Q'-0" lEL. 354'-0 1/2" Q 0 S

20 0

20'-0"

~e ee

~e ~

~e~

egg %I~

ee FKXPANEL (TYP)

~e V VV vv VV V

~e CD CV

~4

%e %s ~

~e~ ~ye

~e~

~835'- 6"

~e ~

1 00'-0 TURBINE BUILDINGPRESSURE RELIEF VfNL r WMF:~ ~

ENCLOSURE

\\

~

)f

'j)h H

24" Ca CX

f'l 4,

. ~

l

FAX NO.

315 348 1581

I i

HAP-Ud-Se THU"'-'""".2 f'ft ll FN( No, 315 34S F58>

P.,Ob 3/8" 801.TS ON 6" C/C 3/16" BOLTS QN 18" C/C REMOVED BOLT-24"C/C I/O" BOLTS gsheAF-N 24" C/C FKX2'-0" PANEL 06 AAV46)

lmgOa-'YAW g,~ g~ ~gal~ oP o8& L<~KA

s t

I

INTERLOCKINGSIDE JOINTS SHALLCONSIST OF 3I4" MALE

, AND 15/'t6" FEMALESECTIONS FEMALE LIPS SHALLOVERLAP MALELIPS BY 1/2" (MIN}.

PANELS SHAt L BE CRIMPED ON 18" CENTERS (MIN}

FIELD INSPECTED AND CAULKWITH RP-545 TO ASSURE 100% CAULKING 16ga. ASTM A245 (TYP}

TYP GAL "FII"L NER L P JO NT DETA L

+ IFt

tiA'1;M:ot)

I'HLI 42 dd i'j')

clay tt>ea h)'ll t/ h)AVh ~-c.J >.:. -.;.

Cro

$ 4C

Jr?2 ra Sr20 o~o Jot 4

~ s'I >>>

1.4 1.3 Ja1 3>4 4.7 4.5

)43 1,53 I.S5 1.$ 6 1>$ 4 1.41 0.53 Oa45 0>44 1.07 I.JS I.I4

~ 744

.732

.712

.745

,317

.442

.$ 42

.7$ 4

>>> Ic4WLWp

.do4

~23

.203

.245 o304 o$04

>413

>840 2,TOS J,SJO

$,310 6,750 8,445

'I l,72$

7,900 I O,OTO

'I 4,700 10,150 24>$ 7$

33,000 CSS 1,194 2,240 4,9)b 8.448 UICX UI>X 'll-'ll UKX 14-'lo UKX Ibrlb UKX Id-14 UKX 14rl4 VKX )2rt2 RK RK 14.'ll RK 14 lb RK 16rl6 RI( 14.14 RK '12-12

$.1 S.b d.3 6.9 7.9 I I.O 4.7 7.7 9.2

)2.4 lobo

'I.41 1.63 a 1.d4 1>44 I>72 3.10 3.12 l,l3 J.lb 1.50

'1.45 1.4$

2,03 2.32 3.14 1.74 1.94 2.18 2.71 3.65

'1.105 1.152 1.04P I,t44 1.074 1.04S tab JO I 72d 1,404 1.411 I o544 r$44

.dOS

.743

.820 1.01 I 1,373

).899 2.128 2 497 3.304 4.444

,472

~481

.654

.467

.403

'I.J5 1 1.104 t.ted 1.443 1.942 2.86$

4,290 4>420 d,700 8.000 I ).PVO I 4,000 14,72$

15,525

'I 'PI 775 24,415 3 4,200 24,700 24,250 33,3SO 3$.8$ O 44,100 Go,ooo 4 J,OCO 92.000 109,100 144,400 194,300 2.140 2,240 3>357 3,157 4.014 4,448 2,140 2,Ãio 3,3$

'>a/I4 C>444 RKC RKC )416 RKC 14r'l4 RKC )2rl2 5$ C> 2)

2lr22 21-10 21-14 2)rib 21-14 21-l2 i

hCrK ld cd cc>X 14 IG NKX 1 d.lh NKX 14-14 NKX 11rll NI(C NKC 14 IG NKC 14rlb NKC 14 14 NKC 'l2-14 NKC 11 11 4.7 3 4,41

'I 1.74 2.3 2,4 1.7 4.d S,d 4,1 5,7 4.1 7.2 7.9 0.0 I Z.d 4.J 5 7.10 7.94 8.44 I 'I. I 0 3.12 J. I d 3,22 1.010 3.014 J.04 8 3.040 J.or 5 1.105 3.096 3.) GJ 3.110 3.134 3.140 3.200 2.905 3.010 3.014 3,054 Jaod<

1.94 2.42 3.39 0.45 0.? 4 1.04 1.31

'I >41 1.10

).69 I.l6 2.1 I 2.32 2.44 3odc 1,49 2.14 2.3 S 2.86 3.29

'I.840 1.800 1.750 I.d13 1.505 1.510 IA42 I.JPJ I,JI 3 2.140 2.1'I 4 1.100 2.204 1.064 Z.o I 4 2.1 4 1.04 2.1 4 1.91 2.07 2.234 3.000 4.729

.475

.455 1.15 8 1.701 2.2d4 3.341

> 2.125 2.226 2 lll 3 044 3.001 4.049 2.05 2 47 2.84 4.14 4.67 1.140 I $ 60 2.520 oldb

,500

.TS5

.941 1.2??

'1,421

.909 023 I r40 I >18$

1.744

% 011

.85

'I.l 8 1.10 2,04 1$,200 20,770 33,450 5,)SO 4,640 10,100 13,100 I G,COO 14,300 I '?,)20 12,3CO I 4,000 17,140 11,100 37.800 11,330 1$,720 14,000 14,450 27,110 P7,400 Ilt,500 Zod,b?S 19. )CO JT loo SSACO 00,000

>>r,coo 02,9CO 97,100 124.1CO 13>I.800 I 70,600 244.4PO 89.7$ 0

)14,550 124,750 141.750 103 CSO 1,4TP 2,455 4.214 450 Tc4 l,441 2>144 1,4CP 4, ~ Pl I, t4Z l,>C 11 1.7G c 2.254 3,400 1.510 2,2?O 2,a.rC 4,)

ll',1 1?

5CC.

12>10 t?-14 Ilrtd

)2-14 12.12 3.7 4,9 4.0 7.5 10.4 4.$ 1 4.$ $

4,54 4.58 4.41 1.01 1.15

't,GP 2.>> Q 2.404 1>447 2.4 IP 1.410 1,5nl 2.911

~

4.0/C 5.105 4.'I 80 4 507

'I.l? Gi I,G to 2.IOT Kd04 3,411 15,000 1 lc440 18,100 3$ >915 45,775 118,: TO 178,1C 3 117.OC:0 170,100 375.300 040

)adit 1,01G 4,404 8,1db TKX FKX 18-10 flaX 14>lb FKX ld tb

fKX 14 14 tKX 12>)2 4.T 7.1 4.4 10.4

) 4.5 4.40 4.4 I 4.43 4.04 4.7'2 I >97 1. I 1 14T 2.44 1.04 4.24 1.0 I 1.1 1 1.04 J.lt 2.94 J.or

$ >03

>S.JO

'7.5 7 4.04 9.02 12.5P 1.00 1.94 1.4

1,14 4.10 15,330 2S.C8$

JJ3, OO 42>%70 54,460 250,00O 175,400 331 ICO 35?,1 0 304,103 5 SO,GGO 1,911 1,011 JohZG 4,4C 3 4.24G CI(

CK Idrl d

~

Cf I~ I4 (

td

>/o

~.

>>,rl4 CK 14-Lb CK 14>14 CK 14>'I?

CK

'11 14 CI( )2-11 7,0 7.9 7.0 d.l 0.0 9.'0 11.0 IJ.I 11,1 I $,4 4.10 4.'I I 4.11 4.12 G,l 1 6.13 4.I$

G.ld 4.1 0 4.21 2.0 2 2>24 1.14 2.51

'Z.CJ ZoOS 3,14 3,74 1.41 4,41 1.14 3.57 J.'I 1 3.31 1. 5'1 1.07 J. 7/

J.S 7 1.8G 3.10 4.14 9.24 p.lc c

'I0.94

)2.20

'I 2.07

'I 4.40 I T.OO 14.32 1 I.b?

2.12 245 Z>05 J.l I 3.24 1.07 4.)0 4.$ I 5.11 4.50 1 ),000 31,1'Oo 10,400 4t,SOO 43>TOO 51,900 SS,TOO 40>100 70.? 00 44,400 Jc>2.000 4C3,GOO 414.700 a 47d,003 511.000 5GT.,hoe 420,01('41,000 80O,QGO 04$.000 1,441 l,441 1>4>>Z 2,264

'1, 1/. 4

?,1/>S 1,40P 1>400 1,400 G,)1'

'

HARD COPY iDo'cket Fi.le PUBLIC PDI-I R/F OGC ACRS E-NAIL W. Russell/F. Niraglia R.

Zimmerman S.

Varga

.

J. Zwolinski S.

Shankman D. Hood S. Little E. Jordan M. Hartzman D. Jeng W. Long W.

Dean R. Cooper, RI

'II I

11 ~

i li I II I'

I ii.

P'

I I

I I

I I

l'

r

~

r ~

May 8, 1996 The licensee currently anticipates that further telephone discussions with the staff regarding status of the evaluations may be appropriate in about 2 weeks.

ORIGINAL SIGNED BY:

Docket Nos.

50-220 and 50-410 Enclosure:

As stated cc w/encl:

See next page DISTRIBUTION'ee next page Darl S.

Hood, Senior Project Manager Project Directorate I-l Division of Reactor Projects -I/II Office of Nuclear Reactor Regulation DOCUMENT NAME:

G: iNMP1iBLOWPANL.TEL To receive a copy of this document,'indicate in the box:

"C" - Copy without attachment enclo re

"E" Co y with attachment enclosure

. "N" = No co y OFFICE LA:PDI-1 E

PH:PD I-1 D:PDI-HANE SLittle DHood/rsl SShsn n

DATE 05/

/ 6 05/

/96 05/

/96

ic)a Recor opy 05/

/96 05/

/96

~

4

\\

I TI t

'1

,I

't E1 l

/'I t

I-t

I l(