Text
.
-
<
.-
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No. R0-14 Docket No. 50-219 License No. DPR-16 Priority Category C
--
Licensee:
Jersey Central Power and Licht Comoany Madison Avenue at Punch Bowl Road Morristown, New Jersev 07960 Facility Name:
Oyster Creek Nuclear Generating Station Inspection at:
Forked River, New Jersey Inspection conducted: April 18, 1980 Inspectors:
ko l.. M M Sf8/80
~
R. L. Nimitz, Radiation Specialist date signed date signed
~
date signed Approved by:
NC
.v d N e d 7-9
,$d P. J. Kilapp, Ch'ief, 'Radiathn date signed Support Section Inspection Summary:
Inspection on April 18, 1980 (Report No. 50-219/80-14)
Areas Inspected:
Special announced inspection by one regional based inspector of the status of licensee radiation protection commitments made to NRC Region I during the period October 1978 through April 18, 1980.
The inspection involved 8 inspector-hours onsite by one regional based inspector.
Results:
No items of noncompliance were identified.
Region I Form 12 g
(Rev. April 77)
8'006270 f
)
..
.
DETAILS 1.
Persons Contacted D. Arback, Dosimetry Supervisor
- J. Carroll, Jr., Station Manager K. Fickeissen, Plant Support Superintendent S. Fuller, Acting Supervisor - Quality Assurance D. Gaines, Manager, Quality Assurance (JCP&L)
- W. Garvey, Director - Station Administration J. Maloney, Station Operations Supervisor R. McKeon, Outage Coordinator R. Pelrine, Chemical Supervisor W. Stewart, Management Control Supervisor
- J. Sullivan, Unit Superintendent
- D. Turner, Supervisor - Radiation Protection
- denotes those individuals attending the exit interview.
2.
Inspection Purpose The purpose of this inspection was to review the status of licensee commitments made to NRC Region I in the area of radiation protection.
The review encompassed licensee commitments made during the period October 1978 through April 18, 1980.
3.
Commitment Review The status of the commitments made was determined by telephone discussions
'
with licensee representatives prior to the inspection site visit; review of documentation and procedures; and discussions with licensee representatives.
Attachments 1 and 2 to this report present the commitment summary and
,
the status of each commitment respectively.
Reference to Attachment A or B in Attachment 2 refers to the attachments to the licensee's letter dated March 17, 1980 to the Director, Office of Inspection and Enforcement.
l l
v-
_ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - -
.
.
_ _ _.
,
a
Review of Attachment 1, Comitment Review Sumary, indicates the following:
Table 1 Total Radiation Protection commitments 102 received during the period October 1978 through April 18, 1980 Open comitments 56.
(those with time remaining)
Commitments completed on time
Commitments completed late or in process
of being completed late The review indicates the following comitments were completed late or are in the process of being completed late:
Completed Late Realignment of station organization within two months of licensee
--
February 5,1979 letter in response to the NRC letter dated January 12, 1979 transmitting the Civil Penalty.
Realignment was actually completed five months after the February 5,1979 letter.
(See Attachment 2, Page 1)
Review entire control rod drive rebuild operation and change
--
procedures if required to implement ALARA on or before April 30, 1979.
Entire procedure review and revision was completed eight months later in December 1979.
(See Attachment 2, Page 4)
Placement of notice in respirator log to alert p(ersonnel to avoid
--
clothing interfering with respirator face seal February 5, 1979).
The notice was placed in the respirator log on March 14, 1979.
(See Attachment 2, Page 3)
Commitment in Process of Being Completed Late Conduct of a re-audit of the facility's Radioactive Waste Program
--
during the first quarter of 1980.
The audit of the site facility pr gram was begun on April 21, 1980.
(See Attachment 2, Page
.
_
-.
,
i e
e
4.
Licensee Action on Previous Inspection Findings a.
(Closed) Noncompliance (219/79-18-31)
'
Failure to perform methyl iodine test of standby gas treatment system (SBGTS) charcoal. Inspector review of this item indicated
'
the licensee has since perfonned a test (dated January 3,1980)
and has added this technical specification surveillance requirement to his master surveillance schedule. Additionally, procedure No.
-
65.1.006, Rev. O, "SBFTS Charcoal Filter Radioactive Iodine Removal Efficiency Test" dated March 28, 1980 has been established.
The inspector review of the test data indicated the test results were acceptable.
b.
(0 pen) Noncompliance (219/79-18-29)
Failure to establish and implement calibration procedures for:
New Rad Waste Building effluent and area radiation monitors; portal monitors; multiple service gamma calibrator; and environmental air samplers.
Inspector review of the above indicated calibration procedures remain to be established for New Rad Waste Building liquid effluent monitor and environmental air samplers.
c.
(Closed) Inspector Follow-up Item (219/77-19-01)
Air flow measurements near Old Rad Waste Building centrifuge.
Inspector review indicates the licensee encountered problems in attempting to improve the overall condition of the Old Rad Waste Building. As a result of these problems encountered during 1979, the licensee ceased operation of the centrifune and Old Rad Waste Building in December 1979. A new rad waste building has been constructed to replace this building.
d.
(0 pen) Noncompliance (219/78-05-09)
l Failure to have detailed procedures for the use of protective clothing and procedures for calibration of portal monitors.
Procedure 795.3.008 for portal monitor calibration issued November 23, 1979.
Procedure 914.4, "Use of Protective Clothing and
,
.
Equipment," dated March 18, 1976 remains to be revised to include i
specific guidance for use of protective clothing.
e.
(Closed) Noncompl1ance (219/79-23-01)
Failure to submit technical specifications for releases from New Radioactive Waste Building.
Technical specifications submitted
.
February 15, 1980.
Revised specifications submiti.ed March 13,
-198,
_ _ _ _ - _ _ -
_
.-
.- - ___.
a a
,
5.
Exit Interview The inspector met with licensee representatives (denoted in Paragraph 1) at the conclusion of the inspection on April 18, 1980..The inspector summarized the purpose and scope of the inspection.
,
L f
'l
!
)
i
?
i a
-
- -
-
- - - - - - -
-
.
..
...
_ _,, -.
, -..
__ _ _
. _ - _. _ _ _ _ _ _
_ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
'
'
Insp;ction R: port 50-219/80-14 Attachment 1 Comitment Review Summary Comitments(l)
Completed Completed Not Reference Received Open(2)
On Time Late Met Civil Penalty
.13
10
0 (Dated Jan 12,79)
Inspection 79-07
2
0
(Conducted Apr 18-20
& Jul 19-20, 79)
Immediate Action
0
0
Letter (IAL-79-04)
(Dated Apr 25, 79)
.
Performance Appraisal
51
0
Branch Inspection 79-18 (Conducted Oct 1-5, 15-29, 29-32, Nov 1, 2
& 6-8, 79)
Inspection 79-23
0
1
(Conducted Dec 9-14, 18-19, 79 & Jan 4, 80)
Immediate Action
0
0
Letter (IAL-79-21)
(Dated Dec 26, 79)
Inspection 80-03
1
0
(Conducted Jan 21-25,80)
Inspection 80-11
1
0
(ConductedMar18
& 19, 80)
Misc. Telephone
1
0
Comitments Totals 102
42
0 (1)
"Comi tmer t: Received" (2)
"Open" indicates includes comitments time remaining on received and referenced comitment date.
in reports and those comitments received in
{
the licensee's response.
.
Attachment 2 Comitment Status i
.
Index to Attachment 2 P_ age.
1-6 Commitments received following Civil Penalty, Inspection 79-07, IAL 79-04 7-10 Commitments received following Inspection 78-18 (Licensee response letter dated March 17, 1980, AttachmentA)
11-12 Commitments received following Inspection 79-18 (License res onse letter dated March 17, 1980, Attachment B 13-25 Commitments received from the Management Plan for the Oyster Creek Nuclear Generating Station Radiological Control Program following Inspection 79-18 (Licensee response letter dated March 17, 1980, and included in Attachment B)
Inspection 79-23 commitments
IAL-79-21 commitments 28-29 Inspection 80-03 commitments (inspection only)
30-31 Inspection 80-11 commitments (inspection only)
Other commitments
,
1
.
-.
-J
,
.
0YSTER CREEK COMMITMENT SUMMAkY FOR RADIATION PROTECTION Commitment Reference Status Develop procedure for proper use of Licensee response to inspection Procedure developed by laundry monitor by September 1,1978 78-09 (Referenced in Inspection September 1, 1978. Later (noncompliance 78-23-01)
78-23 (page 8) conducted September deleted due to laundry 6-29,1978)
being sent to contractor (commitment met)
Verbal commitment to develop procedure Inspection 78-27 (conducted Calibration procedure for proper use of TLD reader by November October 17-19,1978) paragraph Issued 11/10/78 operating
,
15,1978 (unresolved item 78-27-02)
3.c.
(page 10)
procedures issued 1/11/79 (commitment met)
. Realignment of station organization Response to Civil Penalty Package Administrative Director within two months of licensee February (January 12,1979) Inspection 78-23 and Assistants hired to 5,1979 letter (m April 5,1979) The re-and 78-27 (letter from licensee handle day to day admini-alignment to provide assistance to the dated February 5, 1979)
strative end (August, station manager in the administrative 1979) Review of applicants area.
began January 1979 (Commitment com 5 months late) pleted
-
-
-
. - -
.
.
_ __ ___
_
__
.
.
.
.
2
.
Commitment Reference Status implenent ' specific retraining program Response to Civil Penalty Training given as for radiation protection technicians and (February 5,1979) letter committed to (June -
radiation protection supervisors (No date page 3 September,1979)
given)
(commitmentmet)
establish a standing consnittee to bring Response to Civil Penalty Procedure 915.9, "Imple-additional focus on ways to reduce exposure February 5,1979 letter mentation of ALARA
' throughout station (No date given)
page 3 Program", issued 7/30/79 (Established ALARA
'
committee).
Consnittee currently meets once/ month (consnitment met)
Guidance used to determine what constitutes Response to Civil Penalty Item A.
Memorandum issued to suitable air sampling will be revised to Attachment I to February 5,1979 Radiation Protection
'
reflect more timely measurements in areas (page 4)
personnel in April 1979 of significant levels of contamination will (coninitment met)
be achieved by April 15, 1979 Take direct action to limit spread of activity Response to Civil Penalty Item B.
Source of contamination while performing maintenance (due date Attachment 1, page 4 (old radwaste) shutdown February 9,1979) on old rad waste centrifuge December 1979. Prior to j
shutdown, actions including ventilation modifications,
,
i and contamination containment were attempted (commitment met)
i
.
.
.
.
.
.
.
.
.
m
.
.
Commitment Reference Status Place notice in Respirator log to inform Response to Civil Penalty Item C.
Notice placed in personnel to assure head covers do not inter-Attachment 1, page 5 log March 14, 1979 fere with seal (due February 5,1979)
(commitmentcompleted late)
,
Develop retraining program for all Radiation Response to Civil Penalty Item D.
Training given June Protection Technicians and Supervisors.
Attachment 1, page 7 thru September 1979 Completion of retraining program in August (commitmentmet)
-1979 A special instruction will be established to Response to Civil Penalty Item E, Instruction issued provide spot checking on individuals performing Attachment 1, page 10 February 9, 1979 the coverall and lab coat surveys duties by (commitment met)
February 28, 1979.
Institute surveillance instruction for posting Response to Civil Penalty Item Procedure 902.3 of radiation area signs (fading) February G, Attachment 1, page 11.
" Replacement of faded signs" issued February )
5, 1979.
9, 1979 (commitment met
.
-.
.
.
.
_. __
_
__
_
..
.
..
Commitment Reference Status
,
Review entire control rod drive rebuild Response to Civil Penalty Control Rod Drive operation, change procedures if required Notice of Deviation (Attachment 1, procedures reviewed to implement ALARA on or before April 30, page 2 of Deviation Response)
and revised by 1979 December 1979.
(comitment com 8 months late) pleted Review of Radiation Monitor instrument Letter from NRC to licensee Training in instrument maintenance and calibration program by dated March 2, 1979 repair given June 1979.
April 5, 1979.
Procedures completed
,
December 1979 (commitment met)
l
'
_-
.
.
Comitment Reference Status Radiological Engineering Group will be editing Response to Inspection 79-07 Installation procedure installation procedures prior to PORC Review (conducted April 18-20 and review commenced February i
(March 1980)
July 19-20, 1979)
(page 2)
1980 (comitment met)
Job pre-planning meetings, as required are Response to Inspection 79-07 Open held between job supervisor, radiation workers, (Conducted April 18-20 and radiation technicians and the Radiation July 19-20, 1979) (page 2)
Protection Supervisor prior to issuance of RWPs (March 1980)
All radiation protection personnel were Inspection 79-07 (conducted Open reinstructed in the techniques and April 18-20 and July 19-20, necessity of obtaining air samples 1979) (page 3)
(March 1980)
Additional air sampling equipment Response to Inspection 79-07 Additional air was purchased including lapel and (conducted April 18-20 and sampling equipment continuous air samplers (March 1980)
July 19-20,1979)
purchased (10 Hi vols, 5 lapels) received November 1979 (commitmentmet)
All installation procedures involving Response to Inspection 79-07 procedure review i
radioactive material work are reviewed by (conducted April 18-20 and commenced July 1979 the supervisor radiation protection July 19-20, 1979)
H.P. placed on PORC
.l prior to approval (March 1980)
November 1979
'
(commitmentmet!
,
- - - - - - - - -
- -
-
-
- - - - - - - - - - - - -
-- -- ---
-
-
..
.
.
.
Commitment Reference Status Assign a qualified corporate Health Physics IAL-79-04 dated April 25, Individual assigned Manager to the Oyster Creek site by May 15, 1979 April 26, 1979
>
1980 (commitment met)
Assign additicral qualified persons from IAL-79-04 dated April 25, Individuals assigned outside sources to implement day to day 1979 May 15, 1979 Radiation Protection program by May~15, (commitment met)
1980 Submit comprehensive plan for upgrading IAL-79-04 dated April 25, Plan submitted June Radiation Protection program by June 1, 1979 5, 19',9 (commitment 1979 met)
Establish and conduct additional radiation IAL-79-04 dated April 25, Two separate training protection training for personnel performing 1979 courses given work in radiation areas, and for those June - September, 1979 providing Health Physics coverage by June 1, (commitment met)
1979 and completed by August 1, 1979 Prepare a report of Personnel Contamination on IAL-79-04 dated April 25, 1979 Report prepared April March 16, 1979.
Report shall.tue available 26, 1979.
Second for inspector review by May 4,1979 review / report prepared January 23, 1980 (commit-ment met)
.
-
- -
-
-
- - - -
- - -
-
.
. -.
-
.
-.
-
-.
-
_.
-
.
. -
.
.
Commitment Reference Status Training and qualification audit scheduling Attachment A page ll, Response Status to be determined procedure revised to avoid recurrence of to PAT Inspection 79-18 (0 pen)
,
failure to perform audit.
Establish and implement formal Health Response to PAT Item of Procedures and lesson Physics technician training / retraining Noncompliance 8.5.b plans being written program within one. month after 1980 (Attachment A) (Inspection Licensee estimates refueling outage (s May 1980) program 79-18 conducted October 20% complete (open)
described in attachment B,Section III and November 1979)
'
Permanent calibration procedures for the Attachment A, page 11 Procedures for vent rad waste effluent and area radiation Response to PAT Item monitor issued 3/18/80 monitors are Leing written and will be E (Inspection 79-18)
Procedure for area
-
completed by March 31, 1980 monitors issued 1,'9/80 Liquid effluent monitor in process of modification (open)
Establish procedure for R0ZA survey Attachment A, page 12 Procedure 795.3.004 meter calibration (completed by date Response to PAT Item E issued 11/22/79 of response) Date of response (Inspection 79-18)
(commitmentmet)
March 17, 1980 Establish procedure for portal monitor Attachment A, page 12 response Procedure 795.3.008 calibration (completed by response date to PAT Item E (Inspection issued 11/23/79 of March 17, 1980 79-18)
(commitment met)
.
. _. _ _ _ - _
__
.-
_.
-
.
-
Comitment Reference Sta tus Establish formal turnover procedure for Attachment A, page 12, page 15 Procedure has been placing a new system into operation, i.e.
Response to PAT Item E (Inspection written. Procedure new rad waste facility etc. by September 1, 79-18)
in review (0 pen)
-
1980 Issue engineering requests to evaluate and Attachment A, page 12 Response to Modification request implement modifications to the liquid PAT Item E (Inspection 79-18)
T79-071 issued 10/31/79 effluent monitor by December 31, 1980 (0 pen)
~
.
Establish calibration procedure for constant Attachment A, page 13 Response to Procedure 795.3.009 air monitors (com leted by response date PAT Item E (Inspection 79-18)
issued 11/28/80 of March 17, 1980 (commitment met)
Establish QA/QC program for the whole body Attachment A, page 13 Response to Procedure 915.11 counter (completed by response date)
PAT Item E (Inspection 79-18)
issued 3/14/80 (commitmentmet)
,
Establish procedure for Gamma source calibtator Attachment A, page 14 Response to Procedure 795.3.001 (completed by response date)
PAT Item E (Inspection 79-18)
issued 11/23/79 (commitmentmet)
i
.-
-
-
-
-
-
-
-
-
-
-
-
-
.-
_ -. _
.
-
.
Commitment Reference S ta tus
.
Review appropriate procedures and Attachment A, page 14 of Response Memo issued 3/15/80 instructions for Radiation protection to PAT Inspection 79-18 to Radiation Protection instruments hy May 1,1980 to assure to review procedures no instruments are used unless calib ated and remove non-procedure by approved procedure calibrated instruments (commitment met)
Instructions to be sent to appropriate Attachment A, page 14 of Response Instructons written on d:partment heads to assure only instruments to PAT Inspection 79-18 -
April 14, 1980, issued
'
calibrated by approved procedures are in-use.
on April 18, 1980 This will be done by April 15, 1980.
(commitment met)
Instruments not calibrated by the approved procedures will be removed from service A QA audit program will be performed and Attachment A, page 14 of Response No action by licensee modified if necessary by May 1,1980 to assure to PAT Inspection 79-18 as of April 18, 1980 that the calibrations of instruments is being Licensee site QA performed as required by procedure indicates surveillance plan to be generated (open as of April 18, 1980)
,
_ - _ _ _ _ _ _ - - _ _ _ _ - - _ _ - _
__
.
.
Commitment Reference Status Report No. 79-2, Releases from new rad waste building will Attachment A, p(age 15 ResponseInspection 79-18).
dated 2/29/80, be submitted in Semi-Annual Effluent Report to PAT Item F No. 79-2 summarizes these releases (connitment met)
Add standby gas treatment system charcoal Attachment A, page 16 to PAT Item F Test added s 3/18/80 absorber tests to master surveillance-(Inspection 79-18)
by Temporary change schedule by April 1, 1980 (commitment met)
Review Technical Specifications to determine Attachment A, page 16 Response to Review of all T.S.
addition of other T.S. items to master PAT Item F ~(Inspection 79-18)
amendments from surveillance schedule by end of 1980 outage.
March 78 till April 80 Also review and modify procedures to assure completed 4/11/80 any future surveillance requirements incorpor-(commitment met)
ated in T.S. is included on the master surveillance schedule
.
_.
..
_
_., _
_
_ _
_ _ _.
.
"
'
,
. Comi tment Reference Status
,
Manager of training who will report to the Vice Page 3 of Attachment B to PAT Status not determined President of Generation will be appointed by Inspection 79-18 (0 pen)
May 1, 1980. This individual will have those duties listed in the response (page 3)
Establish training organization by Page 3 of Attachment B Status not to PAT Ins determined (open)
response (pection 78-19 January 1981 non-H.P.)
R Training program which outlines the Page 4 of the Attachment B Status not.
philosophy, basic policies, and objectives to PAT Inspection 79-18 response determined topen)
will be available by September 1980 along (non-H.P.)
with a management plan and schedule for j
accomplishing New Procedure entitled " conduct of Attachment B, page 6 of licensee Procedure in maintenance" will be developed and response to PAT Inspection 79-18 development (open)
,
l implemented. The procedure will provide
.
standard administrative, management, and radiological control practices for advance planning and conduct of maintenance.
The
]
procedure will be issued, training completed,
'
and the. prescribed controls implemented by August 1,1980.
Complete development of Rad waste procedures Attachment B page 9 of Licensee's Procedures complete by April 30, 1980.
Evaluation of-these response to PAT Inspection 79-18 as of 4/18/80 currently
'
procedures to be completed by May 31, 1980.
being evaluated (open)
i Each cask will have it's own procedure l
'
.
.
.
Commi tment Reference
'
Sta tus Radwaste organization will be revised to Attachment B, page 9 of licensee's Personnel currently create position of Supervisor Radwaste response to PAT Inspection 79-18 being reviewed for Operations (to be filled May 1,1980)
positions (open)
and Radwaste Shif t Supervisor and radwaste operators (to be filled September 30,1980)
.
Complete review and revision of all Radwaste Attachment B, page 9 of licensee's Review * 50%
operating procedures to assure current system response to PAT Inspectio'n 79-18 complete as of status is reflected. Will be completed by April 18, 1980 June 30, 1980.
(open)
Expand Site QA organization responsibility to Attachment B, page 12 response to Recruiting and include personnel to provide QA coverage PAT Inspection 79-18 expansion underway of radiation protection, radwaste shipping as of April 18, 1980 and chemistry. Recruiting to fill positions (open)
by June 1,1980.
Goal to have positions filled by end of 1980.
.
.
.
.
.
.
.
.
e LICENSEE COMMITMENTS OBTAINED FROM MANAGEMENT PLAN
.
FOR THE OCNGS RADIOLOGICAL CONTROL PROGRAM
-
___
_ _ _ _ _ _ _ _
_ _ _ _ _ _.
.
_
_ _ _
,
_.
_.
--
i
~
.
.
INTRODUCTION Commitment Reference Sta tus
Develop and implement a Radiation Protection Attachment B, page 19 of Draft plan completed l
~
Plan outlining the philosophy, basic policies Response to PAT Inspection April 4, 1980. To be of OCNGS and JCP&L. The plar, will outline 79-18 issued April 18, 1980 Radiological Program, delin te worker's (open)
.
responsibilities and stress managemerf s commitment to high quality by April i3,
-
1980.
'
Initiate Supervisory and Management Development Attachment B, page 20 of Response Two contractor organi-programs within 1 month after outage to upgrade to PAT Inspection 79-18 zations preparing programs.
supervisory and management skill of Radiation Program to be completed Protection Department with emphasis in the June 1, 1980 Radiological Planning and control areas.
(open)
Re-organize Rad Protection Organization to Attachment B, page 21 Propo".ed organization eliminate production related functions, drafted.
T.S. change provide for better visibility and authority to be submitted by to senior site (or corporate) management.
May 1, 1980.
Submit T.S. change by May 1,1980 (Details (open)
page 21, 22, 23)
-
-
-
- -
-
- - -
.
.
.
RADIOLOGICAL CONTROL ORGANIZATION Commitment Reference S_tatus
,
Central Reference Library for the Attachment B, page 23 Collection of Radiation Protection organization will material begun.
be assembled in central location by July Central location 15, 1980.
to be determined.
(open)
.
Radiation Protection Training co-ordinator Attachment B, page 24 Job description will be assigned to formalize program for Recruiting for Rad Techs and Group Sonervisors.
Program co-ordinator in description will be aue on July 1,1980.
progress.
Program s 20% complete (open)
Radiation Protection Training Program will Attachment B, page 24 Program to start start August 1,1980 m June 1, 1980.
(open)
- -
- - -.
-
_ _ _...
_
_
-
.
.
RADIOLOGICAL CONTROL ORGANIZATION CONT.
?
Comi tment Reference Ststus
.
.
Qualification Program will be complete Attachment B, page 24 Program description by August 1, 1980. Those Technicians / Group in progress as of Supervsors not qualified after August 1,1980
-
April 18,1980.
Licensee will be restricted in duties, in writing, estimates 20% complete until qualified.
(open)
.
e
)
k-
'
,
-
-
.
.
RAD WORKER TRAINING Commi tment Reference S tatus Radiation Protection Training Coordinator Attachment B, page 25 Co-ordinator not will review rad. worker training and develop yet selected
.
criteria for minimum qualification and provide (open)
guidance to training department in establishing and implementing orinetation and re-training program.
The co-ordinator will periodically audit and evaluate training. The reviewed training program
-
-
will be described by July 1, 1980.
The described radiation worker training program Attachment B, page 25 Program description will start August 1,1980.
in progress. Course will be upgraded.
(open)
t Establish and distribute guidelines Attachment B, page 25 Guidelines written i
for necessity of special training such and being reviewed.
as mock up training, walk through exercises To be incorporated e tc. Within 2 months after plant startup.
into procedures.
(open)
,
e
-_
.
...
-.
-
--
-
-
.--
.
,
<
.
,
DEFICIENCY ANALYSIS / COMMITMENT TRACKING
,
Commitment _
Reference Status j-Develop in-house surveillance program to Attachment B, page 27 Radiological Engineering
,
monitor radiological work practices and currently performing identify and document weaknesses in the audits. Program to be Radiation Protection Program.
The program formalized.
will be developed by May 15, 1980.
(open)
,
,
,
Implement " Radiological Deficiency Attachment B, page 27 System * 90% complete Reporting" system to identify, recommend Deficiency Report forms
,
corrective action, evaluate action and track are being printed more generic problems associated with the (open)
Radiation Protection program. The action due date for this system is May 15, 1980.
This system will address either an engineering
or management level.
l Upgrade current Radiological Audit Program Attachment B, page 28 Informal audits currently
to provide more frequent and indepth audits being onducted. Audit
of various phases of the Radiological Program.
Proc 0Jures to be developed These audits will begin June,1980.
(open)
.
._
.
._
-
-
-. -.
.-
- - -
.
.
DEFICIENCY ANALYSIS /COPMITMENT TRACKING CONT.
Comi tment Reference Sta tus To assure adequate management Attachment B, page'28 Procedure.915.10 involvement and subsequent corrective
" Investigation of actions, all incidents having radiological Radiation Protection" significance will be thoroughly investigated, being revised to incor-documented and follow-up corrective actions porate comitment.
'
developed including holding critique / preparing Procedure * 95%
'
incident report.
This action is due April 18,
-
complete.
(open)
1980.
All Radiation Protection associated procedures Attachment B, page 29 Priority list completed will be re-structured to achieve verbatim April 11, 1980.
Procedures compliance. A priority list for revision will currently being rewritten.
,
be compiled. The pricrity listing and schedule (open)
will be completed by April 15, 1980.
The action due date for the procedure re-write is October 15, 1980.
,
Policy statement to implement ALARA Attachment B, page 29 Statement originally
,
concepts will be completed by May 1, issued June 18. 1979.
1980.
Will be incorporated
in s Radiological Safety Manual (open)
-
. - - -
_ _
. _ _
_
. _ _
__
_
.
_-
.
.
EXPOSURE REDUCTION / PROCEDURE PREPARATION Consni tment Reference Sta tus A procedure for radiological engineering Attachment B, page 29 Procedure written review (containing review criteria) will to be issued following be established by May 1,1980.
review (open)
.
Action Sign Off Steps will be added to all Attachment B, page 30 No action taken as of work procedures for work on major evaluations April 18, 1980.
to ensure individual verifies by signature (open)
that the rad safety requirements have been satisfied. The action due date is Septenber 1, 1980.
Develop man-rem goals for each major job.
Attachment B, page 30 Prior exposure history
'
The man-rem goals will be developed by (s 6 quarters) in review.
'
Rad Engineering by September, 1980.
Goals in process of
,
,
development (open)
Develop Radiological Work Practice Manual Attachment B, page 30 Manual approximately by June 1, 1980.
30% complete (open)
-
--
- -
--
--
-
-
-
--
-
-
--.
.
.
RESPIRATORY PROTECTION Commi tment Reference S ta tus Management Evaluation Program Attachment B, page 31 Program description description of Respiratory Protection v 70% complete as of Program is due May 16, 1980.
This is April 18 1980.
an evaluation of the sources and engineering (open)
controls to use.
'
.
An initial management Evaluation Report Attachment 8, page 31 Evaluations and and Recommendations of the Respiratory Recommendations Protection Program will be completed by s 70% complete May 16, 1980.
(open)
Review of Respiratory Protection Equipment Attachn.ent B, Review completed by May 16, 1980.
This review will identify March 14, 1980 equipment and Facility Requirements including (commitment met)
respirator equipment, air sampling equipment, portable ventilation etc.
Revision of Medical Examination Procedure to Attachment B, page 32 Contractor currently comply with NUREG-0041. This will be completed evaluating medical by September 5,1980.
exam procedure (open)
.
.
-
-
--
- -- -
. _. - =
~
.
.
RESPIRATORY PROTECTION CONT.
Commitment Reference Status Revise Bioassay Examination Procedure to Attachment B, page 32 Procedure 915.8 issued comply with NUREG-0041.
This will be April 8, 1980.
Procedure comp 1 ated by April 1,1980.
specifies frequency.
(comitment met)
.
%
Respirator Policy statement will be issued Attachment B, page 32 original statement issued by April 4, 1980.
in 1974. Statement to bere-issued (open)
Respiratory Program Description will be Attachment B, page 32 Description completed established by April 15, 1980.
April 15,1980 (comitment met)
Certify integrity of breathing air system Attachment B, page 32 Certification of system by May 2, 1980.
approximately 98%
complete (open)
,
.
-
.
DOSIMETRY, INTERNAL / EXTERNAL Conmi tment Reference Sta tus
'
Expand TLD Quality Control Program to Attachment B, page 33 Outside agency include irradiation of TLDs by outside contracted.
Procedures agency. This will be completed by May being written. Program 16, 1980 an serve as a comparison.
m 50% complete.
(open)
.
Perform intercomparison of monthly Attachment B, page 33 Intercomparisons currently
'
processing results to resolve processing being performed. Procedures techniques.
This will be started by being written.
Program September 6,1980.
- 50% complete (open)
Perform evaluation for need for Albedo neutron Attachment B, page 33 Evaluation recently begun.
monitoring for personnel use and/or area Evaluation s 5% complete
,
monitoring by November' 21, 1980.
(open)
'
Dosimetry procedures were recently upgraded to Attachment B, page 33 Form upgraded to reflect reflect the requirements for individuals who are exempt from dosimetry issuance (Forms)
I.
requirements of non-badged
'
personnel (open)
I
,
.
.
D0SIMETRY, INTERNAL / EXTERNAL CONT.
Conunitment Reference Status Develop job classification for permanent Attachment. B. page 34 Job classification dosimetry technicians along with a training /
and training / retraining retraining qualification program.
The job program in preparation.
classification will be completed hy August Positions to be posted
,
1,1980. The training will be established by by May 1, 1980.
(open)
September 1,1980.
.
In the future, internal exposure evaluations Attachment B, page 34 To be incorporated will be coordinated and managed by the into procedure 915.8/915.11 1 Radiation Health and Dosimetry Group formed in (open)
the Radiation Protection Department reorgani-i zation (Note: Attachment B page 21 indicates
'
T.S. for reorganization of Rad Protection organization will be submitted by May 1,1980).
Current bioassay program is being revised to Attachment B, page 34 Procedure 915.8 revised
~
formalize the basis for bioassays..This will to reflect basis,
,
be completed by April 18, 1980.
Submitted for review April 7,1980.
(commitment met)
.
- - -
. -
- - - -
.
.
RAD WASTE Commitment Reference Status
~
Specific responsibilities and Attachment B, page 35 No Action as of the designation of a Radwaste Shipping Note:
Does not concur April 18,1980 Supervisor will be completed by with date on Attachment (open)
August 1, 1980.
B, page 9 (May 1, 1980)
Preparation of procedures addressing all Attachment B, page 35 Ship, ring procedures phases of Radioactive Waste Handling Note:
Shipping procedures for casks being used This will be completed by September 1, to be completed by April 30, complete.
Remaining 1980, 1980, evaluation of procedures procedures being by May 31, 1980.
QA of Radwaste written. Open as of Shipping addressed on page 12 April 18, 1980 of Attachment B.
-
-
-
_
__
_
.
.
.
PLANT / EQUIPMENT DECON Commi tment Reference S ta tus Assign a Task Force to establish Attachment B, page 36 No action taken plan / identify / schedule for decon as of April 18 action by August 1,1980.
1980.
Task force menbers remain to be selected.
Responsible individual is Station Manager.
(open)
Establish enforceable housekeeping Attachment B, page 36 Policy currently policy to minimize extraneous material being generated from within controlled areas by June 1,.
Responsible individual 1980.
is Station Manager.
(open)
.
Review and identify sources of contamination Attachment B, page 36 Reviews being conducted.
'
'
and develop a plan of action to prevent or Plan to be developed
minimize ra-contamination by Septenber 1, (open)
1980.
l A program will be developed to reduce solid Attachment B, page 36 No action as of waste generation through minimizing material April 18,1980
)
which becomes contaminated, increased reuse Task Force to be of contaminated items and improve decon responsible (open)
techniques. This will be completed by i
September 1, 1980.
'
-
_ _ _ _ _ _
__. __ _
_
.
\\
'
,
.
INSPECTION 79-23 Commitment Reference S tatus Establish and implement procedures for Inspection 79-23, page 11 Procedure 651.1.006 testing of charcoal beds of Standby (Rad Waste Inspection)
issued March 28, 1980 gas treatment system by next scheduled (consnitment met)
test.
-
Perform re-audit of Radioactive Waste Inspection 79-23 Audit of licensee's Program (IE Bulletin 79-19) by first verbal commitment from licensee shipping contractor quarter of 1980 Quality Assurance representatives conducted by licensee March 24-27, 1980. Audit of licensee's site program to be conducted April 21-25,1980 (commitment
-
date not met) (open)
-
-
- -
-
- -
.
~
.
.
I AL-79-21 *
Commi tment Reference Sta tus
'
A Technical Specification (T.S.)
IAL-79-21 dated December 26, T.S. subnitted covering releases via the New Radwaste 1979 February 15, 1980
'
Building Vent and associated building Revision submitted i
operations will be subnitted along with March 13, 1980 T.S. for releases from the Augmented (commitment met)
Off-gas Building Vent by March 1,
'
1980.
Complete alarm set point evaluation for IAL-79-21 dated December 26, 1979 Completed January Radwaste Building releases from the vent 21,1980 (commitment will be completed by February 1,1980.
met)
'
Perform evaluation of Radwaste Building IAL-79-21 dated December 26, 1979 Evaluation Performed automatic ventilation isolation upon High January 23, 1980 Trip Alarm by February 1, 1980.
(connitment met)
- IAL-79-21 issued as a result of Radwaste Inspection 79-23 conducted December 9-14, 18-19, 1979
.
_ _ - _________ _.
.
_
.
.
'
.
.
INSPECTION 80-03 JANUARY 21-25, 1980 Commitment Reference S tatus Hold meetings with Safety Department to Inspection 80-03, page 10 Meetings held prior ensure Air Samples are being taken of to February 1,1980 breathing air Contractor contacted to perform evaluations
'
ofsystem(commitment met)
An independent audit of the dosim(try Telephone discussion March Audit completed by program will be conducted April 7-11,
?? 1980 (As a result of Contractor during 1980.
It w.ction 80-03)
April 7-11, 1980 (commitment met)
.
high beta radiation jobs will be reviewed Inspection 80-03 Jobs reviewed by by February 1,1980 to determine if February 1, 1980. No personnel exceeded 10 CFR 20.101 limits personnel exposure i
in excess of limits Id=tifled (commitment met)
.
i
!
s
.
.
.
L
.
INSPECTION 80-03 CONT.
Commi tmelt Reference S tatus Contract independent laboratory to Inspection 80-03 Contract with perform beta dosimetry tests University of Michigan (No date givers)
-
completed.
Licensee
-
sending badges to university for testing (April 1980)(commitment met)
Establish beta quality assurance program Inspection 80-03 Licensee indicates program approximately 50% complete (open)
.
.
-
-
-
-
-
.
.
INSPECTION 80-11 Comi tment Reference Sta tus Only technicians meeting ANSI-N18.1,1971 Inspection 80-11 conducted Non-ANSI qualified will be utilized in responsible position.
March 18-19,1980 and Reverse technicians restricted This will be implemented by April 7,1980.
IAL dated April 2,1980.
to non-responsible duties as of April 7, 1980 (commitment ' net)
A revised Radiation Work Permit Procedure Insper ion 80-11 conducted Procedure written and will be established and implemented by March 18-19, 1980.
being reviewed.
Procedure April 15,1980.
to be issued May 1, 1980.
(open)
Respiratory Protection Procedure 915.5 will be Inspection 80-11 conducted Temporary change issued revised to include specific guidance for air March 18-19, 1980 March 22, 1980.
Initially sampling and use of Respiratory Protective approved March 26, 1980.
equipment by April 1, 1980.
Procedure to be revised (comitment met)
,
.
-
.. -
-
.
- -
-
. - -
-
.
._ _ _
_
_
_
-
.
>
INSPECTION 80-11 CONT.
-
.
Commitmant Reference Status All Radiation Protection Technicians Reverse IAL dated April 2,1980 Memorandum issued to will be instructed in verbatim (As a result of Inspection 80-11)
each technician 9n procedure ccmpliance and revised April 3,1980 Respiratory Protection Procedure (comitment met)
by April 3,1980.
,
f f
i
'
. -.
.
_ _ _ _ _ _ - _. _
_
..
.
s
.
OTHER C0 WITMENTS
.
,
Commitment Reference Status i
l Establish procedure for release of non-Telephone contact with-licensee Procedure currently tankage liquids from site by May 9,1980 representatives on April 14, 1980 being written as of April 18,1980 (open)
i
.
1