IE Insp Rept 50-219/79-20 on 791127-30.No Noncompliance Noted.Major Areas Inspected:Security Plan,Program Audit, Physical Barriers in Protected & Vital Areas,Lighting & Access Control.Details Withheld (Ref 10CFR2.790)
ML19309E346
Person / Time
Site: Oyster Creek
Issue date: 02/20/1980
From: Devlin J, Madden W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19309E345 List:
References
50-219-79-20, NUDOCS 8004210330
Download: ML19309E346 (1)


Text

U. S. NUCLEAR REGULATORY COMMISSION

.

-

OFFICE OF INSPECTION AND ENFORCEMENT

REGION I

Report No. 50-219/79-20 Category C

,

_

Docket No. 50-219 License No. DPR-16 Safeguards Group IV

Licensee:

Jersey Central Power and Light Company

Madison Avenue at Punch Bowl Road Morristown, New Jersey 07960

Facility Name:

Ovster Creek Nuclear Generating Station i

Inspection At: Forked River, New Jersey Inspection Conducted: November 27-30, 1979 Date of Last Physical Security Inspection Visit: November 6-9, 1978 Type of Inspec ion:

Unannounced Physical Security Inspectors:

f A\\

m

[-- / / - Id W. Madden, Physical Security inspector date date

.

date J/76 C

Approved by:

&

r-

-

W. Uevlin, Uniet, security ano investigation

' cate'

(pSection,SafeguardsBranch Inspection Summary:

Areas Ins 3ected: Security Plan, Security Program Audit, Security Organization, Physical 3arriers (Protected Areas), Physical Barriers (Vital Area), Lighting, Access Centrol (Identification, Authorization, and Badging), Access Control (Escorting), Access Control (Search), Access Control (Vital Areas), Alam Stations, Detection Aids, Assessment Aids, Comunications, Testing and Mainten-ance, Compensatory Measures, Response, Locks, Keys, and Combinations, and, Records and Reports. A followup inspection of corrective actions relevant to previously identified items of noncompliance and a review of licensee actions taken as a result of IE Bulletin 79-16 was also accomplished. The inspection was initiated during an offshfft period (6:35 a.m.).

A total or 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> were performed during offshif*. periods and 29 hours3.356481e-4 days <br />0.00806 hours <br />4.794974e-5 weeks <br />1.10345e-5 months <br /> during regular plant hours of operation.

Results: The licensee was found to be in compliance with NRC requirements in the 19 functional areas examined. Corrective actions on previously identified items of noncompliance and actions implemented in response to IE Bulletin 79-16 were also found acceptable.