ENS 53459
ENS Event | |
---|---|
05:00 Jun 16, 2018 | |
Title | Manual Reactor Trip During Startup |
Event Description | At 1121 CDT on June 16, 2018, Arkansas Nuclear One, Unit 1 (ANO-1) performed a manual reactor trip due to a Turbine Bypass valve failing open on reactor startup. At the time, ANO-1 was in Mode 2 at approximately 2 percent power.
The failed Turbine Bypass valve resulted in an overcooling event and the Overcooling Emergency Operating Procedure (EOP) was entered. Main Steam Line Isolation (MSLI) automatic actuation occurred on 2 of the 4 channels of Emergency Feedwater Initiation and Control during the overcooling event in the 'B' Steam Generator. The remaining channels of MSLI were manually actuated by the control room staff from the control room. Overcooling was terminated after the closure of the Main Steam Isolation Valve (MSIV) and reactor coolant parameters were stabilized as directed by the Overcooling EOP. Additionally, Gland Sealing Steam was lost to the main turbine due to the closure of the 'B' Steam Generator MSIV and Loss of Condenser Vacuum Abnormal Operating Procedure was entered. This is a 4-hour non-emergency 10 CFR 50.72 (b)(2)(iv)(B) notification due to a Reactor Protection System actuation (scram) and an 8-hour non-emergency 10 CFR 50.72 (b)(3)(iv)(A) notification for safety system actuation." All control rods fully inserted into the core during the trip. Heat removal is via the Atmospheric Dump Control valves to atmosphere. The NRC Resident Inspector has been notified. The licensee also notified the State of Arkansas. |
Where | |
---|---|
Arkansas Nuclear Arkansas (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+10.93 h0.455 days <br />0.0651 weeks <br />0.015 months <br />) | |
Opened: | Kevin Casey 15:56 Jun 16, 2018 |
NRC Officer: | Andrew Waugh |
Last Updated: | Jun 16, 2018 |
53459 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 53459\u003C/a\u003E - \u003Ca href=\"/Arkansas_Nuclear\" title=\"Arkansas Nuclear\"\u003EArkansas Nuclear\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EManual Reactor Trip During Startup\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 53459 - Arkansas Nuclear\n","link":"","lat":35.31055555555555,"lon":-93.23084444444444,"icon":"/w/images/7/79/Entergy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | Yes, Manual Scram |
Before | Startup (2 %) |
After | Hot Standby (0 %) |
Arkansas Nuclear with 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
WEEKMONTHYEARENS 563512023-02-14T17:03:00014 February 2023 17:03:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Trip Due to Two Reactor Coolant Pumps Tripping ENS 556142021-11-29T20:58:00029 November 2021 20:58:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip ENS 551382021-03-14T19:15:00014 March 2021 19:15:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Trip Due to Loss Bus Voltage ENS 550282020-12-10T22:08:00010 December 2020 22:08:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Due to Low Steam Generator Water Level ENS 540912019-05-26T10:12:00026 May 2019 10:12:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to a Reactor Coolant Pump Trip on Ground Fault ENS 537932018-12-18T06:00:00018 December 2018 06:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip - Loss of Non-Vital Bus ENS 534592018-06-16T05:00:00016 June 2018 05:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip During Startup ENS 534042018-05-16T22:50:00016 May 2018 22:50:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Loss of Main Feedwater Pump ENS 527102017-04-26T15:04:00026 April 2017 15:04:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 1 Automatic Reactor Scram Due to Partial Loss of Offsite Power ENS 516072015-12-15T11:44:00015 December 2015 11:44:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Loss of Feed to One Steam Generator ENS 500632014-04-28T01:12:00028 April 2014 01:12:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to an Auxiliary Trip on Core Protection Calculator ENS 499952014-04-03T18:01:0003 April 2014 18:01:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip ENS 496182013-12-09T14:00:0009 December 2013 14:00:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unusual Event Declared Due to Unit 2 Auxiliary Transformer Explosion ENS 488692013-03-31T15:33:00031 March 2013 15:33:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Notification of Unusual Event Declared Due to a Breaker Explosion in the Protected Area ENS 481692012-08-08T13:23:0008 August 2012 13:23:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to High Reactor Coolant System Pressurizer Pressure ENS 458722010-04-26T05:00:00026 April 2010 05:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Unit 1 Experienced an Automatic Reactor Trip During an Ni Calibration ENS 458542010-04-18T18:57:00018 April 2010 18:57:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Trip During Reactor Startup ENS 455492009-12-08T14:42:0008 December 2009 14:42:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Low Steam Generator Level Caused by Loss of Main Feed Water Pump ENS 453672009-09-20T10:11:00020 September 2009 10:11:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unplanned Emergency Diesel Auto Start During Surveillance Testing ENS 449062009-03-14T02:51:00014 March 2009 02:51:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Feedwater Regulating Valve Failure Leads to Manual Reactor Trip ENS 448372009-02-07T16:59:0007 February 2009 16:59:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to a Fire Onsite ENS 448312009-02-05T21:24:0005 February 2009 21:24:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Unit 1 Manually Tripped Due to Control Rod Drive Motor High Temperatures ENS 447362008-12-20T18:12:00020 December 2008 18:12:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Trip When Control Rod Bank Inserted Without Operator Action ENS 447162008-12-12T14:55:00012 December 2008 14:55:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Unit 1 Was Manually Tripped from 32% Power Due to an Abnormal Rod Pattern ENS 441252008-04-07T18:45:0007 April 2008 18:45:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Core Element Assembly Calculators Declared Inoperable ENS 422292005-12-26T16:47:00026 December 2005 16:47:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Following Turbine Trip ENS 401192003-08-29T19:28:00029 August 2003 19:28:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip on High Rcs Pressure 2023-02-14T17:03:00 | |