ENS 51607
From kanterella
Jump to navigation
Jump to search
ENS Event | |
|---|---|
11:44 Dec 15, 2015 | |
| Title | Manual Reactor Trip Due to Loss of Feed to One Steam Generator |
| Event Description | This is a 4-hour Non-Emergency 10 CFR 50.72(b)(2)(iv)(B) notification due to a Reactor Protection System (RPS) actuation. Arkansas Nuclear One, Unit 1, was manually tripped from 43 percent power at 0544 CST. The reactor was manually tripped due to operator judgement during control issues with the Integrated Control System (ICS) during a planned downpower for Electro-Hydraulic Control (EHC) system maintenance. CV-2672 B, low load control valve, failed to close. Subsequently, CV-2674 B, low load block valve, began to close and caused a loss of feed to E-24B Steam Generator.
No additional equipment issues were noted. All control rods fully inserted. Emergency Feedwater (EFW) actuated and was utilized to maintain Steam Generator (SG) levels. This [EFW actuation] meets the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Non-Emergency Immediate Notification Criteria [(10CFR50.72(b)(3)(iv)(A)]. No Primary safety valves lifted. Main Steam Safety Valves (MSSVs) did lift initially after the trip. The NRC Resident [Inspector] has been notified. Decay heat is being removed via the steam dump valves to the main condenser. Unit 1 is in a normal shutdown electrical lineup. Unit 2 was not affected by the transient on Unit 1. The licensee notified the State of Arkansas. |
| Where | |
|---|---|
| Arkansas Nuclear Arkansas (NRC Region 4) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
| Time - Person (Reporting Time:+-1.33 h-0.0554 days <br />-0.00792 weeks <br />-0.00182 months <br />) | |
| Opened: | Theron Rowbotham 10:24 Dec 15, 2015 |
| NRC Officer: | Jeff Rotton |
| Last Updated: | Dec 15, 2015 |
| 51607 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 51607\u003C/a\u003E - \u003Ca href=\"/Arkansas_Nuclear\" title=\"Arkansas Nuclear\"\u003EArkansas Nuclear\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EManual Reactor Trip Due to Loss of Feed to One Steam Generator\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 51607 - Arkansas Nuclear\n","link":"","lat":35.31055555555555,"lon":-93.23084444444444,"icon":"/w/images/7/79/Entergy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
|---|---|
| Reactor critical | Critical |
| Scram | Yes, Manual Scram |
| Before | Power Operation (43 %) |
| After | Hot Standby (0 %) |
Arkansas Nuclear | |
WEEKMONTHYEARENS 579492025-09-24T18:47:00024 September 2025 18:47:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Trip ENS 571232024-05-12T01:30:00012 May 2024 01:30:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification ENS 563512023-02-14T17:03:00014 February 2023 17:03:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Trip Due to Two Reactor Coolant Pumps Tripping ENS 556142021-11-29T20:58:00029 November 2021 20:58:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip ENS 551382021-03-14T19:15:00014 March 2021 19:15:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Trip Due to Loss Bus Voltage ENS 550282020-12-10T22:08:00010 December 2020 22:08:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Due to Low Steam Generator Water Level ENS 543122019-10-05T13:50:0005 October 2019 13:50:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(3)(xii), Transport of a Contaminated Person Offsite Individual Transported to Offsite Medical Due to Injury ENS 540912019-05-26T10:12:00026 May 2019 10:12:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to a Reactor Coolant Pump Trip on Ground Fault ENS 537932018-12-18T06:00:00018 December 2018 06:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip - Loss of Non-Vital Bus ENS 534592018-06-16T05:00:00016 June 2018 05:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip During Startup ENS 534042018-05-16T22:50:00016 May 2018 22:50:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Loss of Main Feedwater Pump ENS 527102017-04-26T15:04:00026 April 2017 15:04:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 1 Automatic Reactor Scram Due to Partial Loss of Offsite Power ENS 518912016-04-29T11:15:00029 April 2016 11:15:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification of Onsite Chemical Spill ENS 516072015-12-15T11:44:00015 December 2015 11:44:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Loss of Feed to One Steam Generator ENS 507392015-01-15T21:45:00015 January 2015 21:45:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification Due to Hospitalized Injured Employee ENS 501382014-05-24T15:09:00024 May 2014 15:09:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification Due to Individual Requiring Assistance from Offsite Emergency Personnel ENS 500632014-04-28T01:12:00028 April 2014 01:12:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to an Auxiliary Trip on Core Protection Calculator ENS 499952014-04-03T18:01:0003 April 2014 18:01:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip ENS 496182013-12-09T14:00:0009 December 2013 14:00:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unusual Event Declared Due to Unit 2 Auxiliary Transformer Explosion ENS 488692013-03-31T15:33:00031 March 2013 15:33:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Notification of Unusual Event Declared Due to a Breaker Explosion in the Protected Area ENS 481692012-08-08T13:23:0008 August 2012 13:23:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to High Reactor Coolant System Pressurizer Pressure ENS 478242012-04-11T17:40:00011 April 2012 17:40:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Drill Message Inadvertently Mistaken for Actual Event ENS 458722010-04-26T05:00:00026 April 2010 05:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Unit 1 Experienced an Automatic Reactor Trip During an Ni Calibration ENS 458542010-04-18T18:57:00018 April 2010 18:57:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Trip During Reactor Startup ENS 455492009-12-08T14:42:0008 December 2009 14:42:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Low Steam Generator Level Caused by Loss of Main Feed Water Pump ENS 453672009-09-20T10:11:00020 September 2009 10:11:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unplanned Emergency Diesel Auto Start During Surveillance Testing ENS 449062009-03-14T02:51:00014 March 2009 02:51:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Feedwater Regulating Valve Failure Leads to Manual Reactor Trip ENS 448372009-02-07T16:59:0007 February 2009 16:59:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to a Fire Onsite ENS 448312009-02-05T21:24:0005 February 2009 21:24:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Unit 1 Manually Tripped Due to Control Rod Drive Motor High Temperatures ENS 447362008-12-20T18:12:00020 December 2008 18:12:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Trip When Control Rod Bank Inserted Without Operator Action ENS 447162008-12-12T14:55:00012 December 2008 14:55:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Unit 1 Was Manually Tripped from 32% Power Due to an Abnormal Rod Pattern ENS 441252008-04-07T18:45:0007 April 2008 18:45:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Core Element Assembly Calculators Declared Inoperable ENS 422292005-12-26T16:47:00026 December 2005 16:47:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Following Turbine Trip ENS 419072005-08-10T13:15:00010 August 2005 13:15:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Spurious Activation of Off-Site Emergency Plan Sirens ENS 414752005-03-09T19:04:0009 March 2005 19:04:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification Due to Investigation of Inadvertent Siren Activation ENS 410562004-09-19T14:34:00019 September 2004 14:34:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification Due to Siren Activation ENS 402042003-09-28T05:13:00028 September 2003 05:13:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification Due to Report of Emergency Siren Actuation ENS 401192003-08-29T19:28:00029 August 2003 19:28:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip on High Rcs Pressure 2025-09-24T18:47:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_51607&oldid=421260"