ENS 44125
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
18:45 Apr 7, 2008 | |
Title | Core Element Assembly Calculators Declared Inoperable |
Event Description | On 4/7/2008, at approximately 1345 CDT, with ANO-2 in Mode 3 (Hot Shutdown) at normal operating temperature and pressure, and with all control element assemblies (CEAs) withdrawn approximately 2 stops, the Control Room was notified by the Computer Support Group (CSG) that the software verification for CEAC1 and CEAC2 (Core Element Assembly Calculators) had not been verified. Both CEAC's were declared inoperable. The Reed Switch Position Indicators (CEA positions) are considered inoperable if the CEAC's are inoperable. Tech Spec 3.1.3.3 requires at least one of these position indicators be operable in Modes 3 through 5 for each CEA not fully inserted. All CEAs were approximately 2 steps withdrawn from fully inserted during plant heatup to clear the rod bottom indications in preparations for CEA Drop Time Testing. At 1350 the reactor trip breakers were opened and CEA's were verified to be fully inserted to meet the Action Statement for Tech Spec 3.1.3.3. Note that no actual position indication was lost, nor did the CEAC show any signs of malfunction. The software verifications have been completed by the CSG.
The licensee notified the NRC Resident Inspector. The licensee also notified the state. |
Where | |
---|---|
Arkansas Nuclear Arkansas (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+1.98 h0.0825 days <br />0.0118 weeks <br />0.00271 months <br />) | |
Opened: | Chuck Olson 20:44 Apr 7, 2008 |
NRC Officer: | John Knoke |
Last Updated: | Apr 7, 2008 |
44125 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 44125\u003C/a\u003E - \u003Ca href=\"/Arkansas_Nuclear\" title=\"Arkansas Nuclear\"\u003EArkansas Nuclear\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ECore Element Assembly Calculators Declared Inoperable\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 44125 - Arkansas Nuclear\n","link":"","lat":35.31055555555555,"lon":-93.23084444444444,"icon":"/w/images/7/79/Entergy_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Not Critical |
Scram | No |
Before | Hot Standby (0 %) |
After | Hot Standby (0 %) |