ENS 51715
ENS Event | |
---|---|
18:26 Feb 7, 2016 | |
Title | Manual Scram and Alert Declaration Due to Electrical Fault Resulting in Fire/Explosion |
Event Description | At 1346 EST the licensee reported that at 1326, Brunswick Unit 1 declared an Alert under EAL HA 2.1 due to an explosion/fire in the Balance of Plant 4 kV switchgear bus area. Prior to the Alert declaration, the operators initiated a manual SCRAM due to an unexpected power decrease from 88% to 40%. The licensee has visually verified that there is no ongoing fire and is investigating the initial cause of the event. Offsite power is available to the site, but EDGs 1 and 2 are running and supplying Unit 1 loads. The MSIVs shut and HPCI/RCIC are being used to maintain vessel level. At 1412 EST, NRC decided to remain in Normal Mode.
At 1704 EST the licensee reported the following: At 1313 hours0.0152 days <br />0.365 hours <br />0.00217 weeks <br />4.995965e-4 months <br /> Eastern Standard Time (EST) a manual reactor scram was initiated due to loss of both recirculation system variable speed drives as a result of an electrical fault. At this time, a Startup Auxiliary Transformer (SAT) experienced a lockout fault; interrupting offsite power to emergency buses 1 and 2. Emergency Diesel Generators (EDGs) 1, 2, 3, and 4 automatically started and EDGs 1 and 2 synchronized to emergency buses 1 and 2 per design. The power interruption resulted in closure of the Main Steam Isolation Valves, per design. The manual scram also resulted in closure of Group 2, 6, and 6 Containment Isolation Valves. The Reactor Core Isolation Cooling (RCIC) system was manually started and is being used to control reactor water level. The High Pressure Coolant Injection (HPCI) system was manually started and is being used for pressure control. The Plant response to the event was per design. Unit 2 is not directly affected by the event, however, due to the shared electrical distribution system is in a Technical Specification Action statement due to the Inoperable Unit 1 SAT. The public health and safety is not impacted by this event. At 1751 EST, the licensee reported that the emergency declaration had been downgraded to an Unusual Event at 1730 because the plant no longer meets the criteria for an Alert, but does meet the criteria for an Unusual Event due to a "loss of all offsite power to Emergency 4 kV buses E1 (E3) and E2 (E4) for greater than or equal to 15 minutes." The NRC Resident Inspector has been notified. The licensee has notified the State and Local governments. Notified DHS, FEMA, USDA, HHS, DOE, DHS NICC, EPA EOC, FEMA NWC (via email), FDA EOC (via email) and Nuclear SSA (via email).
At 1814 EST the emergency declaration was terminated because offsite power was restored. The NRC Resident Inspector has been notified. The licensee has notified the State and Local governments. Notified R2DO (Musser), NRR EO (Morris), IRD MOC (Stapleton), R2RA (Haney), NRR ET (Lubinski), NRR ET (Dean), DHS, FEMA, USDA, HHS, DOE, DHS NICC, EPA EOC, FEMA NWC (via email), FDA EOC (via email) and Nuclear SSA (via email). |
Where | |
---|---|
Brunswick ![]() North Carolina (NRC Region 2) | |
Reporting | |
Emergency class: | Alert |
10 CFR 50.72(a) (1) (i), Emergency Class Declaration 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
LER: | 05000325/LER-2016-001 Regarding Electrical Bus Fault Results in Lockout of Startup Auxiliary Transformer and Loss of Offsite Power |
Time - Person (Reporting Time:+-4.67 h-0.195 days <br />-0.0278 weeks <br />-0.0064 months <br />) | |
Opened: | Sami Jaziri 13:46 Feb 7, 2016 |
NRC Officer: | Daniel Mills |
Last Updated: | Feb 7, 2016 |
51715 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 51715\u003C/a\u003E - \u003Ca href=\"/Brunswick\" title=\"Brunswick\"\u003EBrunswick\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EManual Scram and Alert Declaration Due to Electrical Fault Resulting in Fire/Explosion\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 51715 - Brunswick\n","link":"","lat":33.95840833333333,"lon":-78.00979722222222,"icon":"/w/images/7/75/Duke_Energy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | Yes, Manual Scram |
Before | Power Operation (88 %) |
After | Hot Shutdown (0 %) |
Brunswick ![]() | |
WEEKMONTHYEARENS 573222024-09-16T16:40:00016 September 2024 16:40:00
[Table view]10 CFR 50.72(a)(1)(i), Emergency Class Declaration Notification of Unusual Event Due to Site Access Impeded ENS 569772024-02-19T04:25:00019 February 2024 04:25:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Start of Emergency Diesel Generator ENS 567972023-10-16T02:56:00016 October 2023 02:56:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Due to Fire Not Verified to Be Extinguished within 15 Minutes ENS 564782023-04-20T05:48:00020 April 2023 05:48:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to a Turbine Trip ENS 556272021-12-06T16:25:0006 December 2021 16:25:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Safety System Actuation ENS 548122020-08-04T03:12:0004 August 2020 03:12:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to a Loss of Offsite Power ENS 545972020-03-22T16:55:00022 March 2020 16:55:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram ENS 540522019-05-07T02:04:0007 May 2019 02:04:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Noue Due to Fire Lasting Longer than 15 Minutes in Turbine Building ENS 540162019-04-22T03:07:00022 April 2019 03:07:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Automatic Reactor Trip and Specified System Actuation ENS 539662019-03-30T21:47:00030 March 2019 21:47:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram and Specified System Actuation ENS 539622019-03-28T20:54:00028 March 2019 20:54:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Actuation of the Primary Containment Isolation System and the Reactor Protecton System ENS 539612019-03-28T18:50:00028 March 2019 18:50:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Unusual Event Declared Due to Rcs Unidentified Leakage ENS 539552019-03-25T08:02:00025 March 2019 08:02:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Start of Four Emergency Diesel Generators ENS 539112019-03-05T10:35:0005 March 2019 10:35:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Actuation of the Primary Containment Isolation System ENS 536092018-09-15T04:00:00015 September 2018 04:00:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration En Revision Imported Date 9/19/2018 ENS 533192018-04-07T12:36:0007 April 2018 12:36:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip and Pcis Actuation During Stator Cooling System Testing ENS 529742017-09-17T13:38:00017 September 2017 13:38:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Emergency Diesel Generator and Primary Containment Isolation System Actuations ENS 526832017-04-17T04:04:00017 April 2017 04:04:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Actuation of Emergency Diesel Generators ENS 520822016-07-13T00:39:00013 July 2016 00:39:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Alert Declared for a Fire in the Service Water Building ENS 517152016-02-07T18:26:0007 February 2016 18:26:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Scram and Alert Declaration Due to Electrical Fault Resulting in Fire/Explosion ENS 507512015-01-22T23:13:00022 January 2015 23:13:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Notification of Unusual Event Declared Due to Toxic Gas in the Security Diesel Building ENS 503552014-08-12T08:32:00012 August 2014 08:32:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Unusual Event for a Halon Release Near the Tsc and Eof ENS 497882014-02-03T15:03:0003 February 2014 15:03:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to Toxic Gas Release That Could Affect Normal Operation ENS 497132014-01-11T00:48:00011 January 2014 00:48:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to Explosion within Protected Area Boundary ENS 488902013-04-05T10:24:0005 April 2013 10:24:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to a Fire Alarm in the Stack Filter House ENS 487832013-02-26T14:00:00026 February 2013 14:00:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to Toxic Gas Leak ENS 478172012-04-09T09:29:0009 April 2012 09:29:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Emergency Diesel Generator Actuation ENS 476972012-02-24T05:37:00024 February 2012 05:37:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Reactor Protection System Actuation During Neutron Instrument Testing ENS 476902012-02-23T04:19:00023 February 2012 04:19:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram Due to High Delta-P Across Circulating Water Pump Traveling Screens ENS 474442011-11-16T08:01:00016 November 2011 08:01:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Due to Drywell Leakage Greater than 10 Gpm ENS 468732011-05-23T19:35:00023 May 2011 19:35:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Alert Declared Due to Halon Discharge in Emergency Diesel Generator Building ENS 459802010-06-06T15:37:0006 June 2010 15:37:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Brunswick Declared Alert Due to Halon Discharge in Emergency Diesel Generator Building ENS 459022010-05-05T15:44:0005 May 2010 15:44:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Due to Reactor Feed Pump Trip ENS 457962010-03-27T02:45:00027 March 2010 02:45:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Dut to Fire Greater than 15 Minutes in Turbine Building ENS 457322010-02-27T06:58:00027 February 2010 06:58:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Core Isolation Cooling (Rcic) System Manually Started to Maintain Reactor Pressure Vessel Level Following a Pre-Planned Reactor Scram ENS 457112010-02-19T16:11:00019 February 2010 16:11:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unsual Event Due to Carbon Dioxide Discharge in the High Pressure Coolant Injection (Hpci) Room ENS 453752009-09-21T18:46:00021 September 2009 18:46:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Protection System and Primary Containment Isolation System Actuation After Placing Hpci System Inservice ENS 451902009-07-08T14:13:0008 July 2009 14:13:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Emergency Diesel Generator Actuation ENS 446852008-11-26T17:00:00026 November 2008 17:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Due to Ehc Malfunction ENS 446472008-11-09T16:08:0009 November 2008 16:08:00 Other Unspec Reqmnt, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram Due to Spurious Srv Opening ENS 444532008-08-30T19:03:00030 August 2008 19:03:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Turbine Electro-Hydraulic Control Malfunction Leads to Reactor Scram ENS 430622006-12-25T10:39:00025 December 2006 10:39:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Reactor Scram Due to Trip from Neutron Monitoring System ENS 429862006-11-11T17:43:00011 November 2006 17:43:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Scram Due to Conductivity Excursion ENS 429552006-11-01T23:37:0001 November 2006 23:37:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Unit 2 Declared an Unusual Event Due to Loss of Offsite Power to the 4Kv Emergency Buses ENS 419832005-09-13T03:14:00013 September 2005 03:14:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to Hurricane Ophelia Warning ENS 418372005-07-13T13:17:00013 July 2005 13:17:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Turbine Trip/Reactor Trip ENS 415822005-04-09T05:50:0009 April 2005 05:50:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Scrammed from 61% Power Due to Low Reactor Water Level ENS 409532004-08-14T17:08:00014 August 2004 17:08:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Notice of Unusual Event Emergency Declared Due to Loss of Offsite Power ENS 409542004-08-14T16:59:00014 August 2004 16:59:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Rps Actuation Due to Loss of Offsite Power ENS 409512004-08-13T22:20:00013 August 2004 22:20:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Notice of Unusual Event Declared Due to Hurricane Warning ENS 402972003-11-04T22:32:0004 November 2003 22:32:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Brunswick Unit 2 Scram Due to Generator/Turbine Trip ENS 401642003-09-17T02:40:00017 September 2003 02:40:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event at Brunswick Due to Hurricane Warning 2024-09-16T16:40:00 | |