Other: DCL-84-248, Notifies of Completion of Fixes for safety-related Masonry Walls,Per IE Bulletin 80-11.Existing as-built Condition Would Not Preclude Addl Mod.No Addl Fixes Necessary Based on Analysis for Line Break & Jet Impingement, DCL-86-083, Forwards Proprietary & Nonproprietary Verification of Diablo Canyon Energy Balance Technique Using San Onofre... Unit 1 Masonry Wall Tests. Proprietary Version Withheld (Ref 10CFR2.790).Affidavits Encl, ML16341D703, ML16341D707, ML16341D962, ML17083B468, ML20198G219, ML20209D910, ML20213E341
|
MONTHYEARML13310B3371984-04-12012 April 1984 Forwards Nonproprietary & Proprietary Results of Masonry Wall Test Program, Seismic Evaluation of Reinforced Concrete Masonry Walls, Results from Testing Walls 1A,1B & 1C.Application for Withholding & Affidavit Encl Project stage: Request DCL-84-248, Notifies of Completion of Fixes for safety-related Masonry Walls,Per IE Bulletin 80-11.Existing as-built Condition Would Not Preclude Addl Mod.No Addl Fixes Necessary Based on Analysis for Line Break & Jet Impingement1984-07-0202 July 1984 Notifies of Completion of Fixes for safety-related Masonry Walls,Per IE Bulletin 80-11.Existing as-built Condition Would Not Preclude Addl Mod.No Addl Fixes Necessary Based on Analysis for Line Break & Jet Impingement Project stage: Other ML20209D4161984-10-0202 October 1984 Discusses Review of Facility Masonry Wall Design,Per .Outstanding Issues Identified in Working Stress Approach & Nonlinear Analysis Method.Audit of Design Calculations Suggested Project stage: Approval ML17083B4681984-11-0101 November 1984 Trip Rept of 841001-05 Site Visit W/Bnl Re Identification of Engineering Matl Needed to Conduct Audit on Adequacy of Civil/Structural Design & Analyses.List of Addl Audit Items Encl Project stage: Other ML20209D9101985-02-11011 February 1985 Forwards Sser Input Re Masonry Wall Issue.License Condition Re Applicant Use of energy-balance Technique to Qualify 42 Masonry Walls Recommended Project stage: Other ML16341D5021985-10-29029 October 1985 Notification of 851105 Meeting W/Licensee in Bethesda,Md to Discuss Status of Util Masonry Wall Analysis Project stage: Meeting ML20198G2191985-11-15015 November 1985 Requests That Task of Reviewing Justification for Use of Energy Balance Technique to Qualify Masonry Walls Be Added to Assignment 6 to Contract NRC-03-81-130 Project stage: Other DCL-85-343, Forwards Proprietary & Nonproprietary Versions of Draft Verification of Diablo Canyon Energy Balance Technique Using San Onofre Nuclear Generating Station-1 Masonry Wall Tests. Proprietary Rept Withheld (Ref 10CFR2.790)1985-11-15015 November 1985 Forwards Proprietary & Nonproprietary Versions of Draft Verification of Diablo Canyon Energy Balance Technique Using San Onofre Nuclear Generating Station-1 Masonry Wall Tests. Proprietary Rept Withheld (Ref 10CFR2.790) Project stage: Draft Other ML16341D4961985-11-18018 November 1985 Summary of 851105 Meeting W/Util,Nrc Consultants & Bechtel Re Util Approach to Justify Use of energy-balance Technique to Qualify Masonry Walls.List of Attendees & Request for Addl Info Encl Project stage: RAI ML16341D5111985-11-30030 November 1985 Nonproprietary Draft Verification of Diablo Canyon Energy Balance Technique Using San Onofre Nuclear Generating Station-1 Masonry Wall Tests Project stage: Draft Other ML16341D5481985-12-0909 December 1985 Advises That Proprietary Version of Draft Diablo Canyon Power Plant,Units 1 & 2 - Verification of Diablo Canyon Energy Balance Technique Using SONGS-1 Masonry Wall Tests, Submitted by Will Be Withheld,Per 10CFR2.790 Project stage: Draft Other ML16341D5671985-12-20020 December 1985 Forwards,In Support of Masonry Wall Review,Pg&E & Proprietary & Nonproprietary Draft Verification of Diablo Canyon Energy Balance Technique Using SONGS-1 Masonry Wall Test. Proprietary Draft Withheld (Ref 10CFR2.790).W/o Encl Project stage: Draft Other DCL-86-083, Forwards Proprietary & Nonproprietary Verification of Diablo Canyon Energy Balance Technique Using San Onofre... Unit 1 Masonry Wall Tests. Proprietary Version Withheld (Ref 10CFR2.790).Affidavits Encl1986-03-27027 March 1986 Forwards Proprietary & Nonproprietary Verification of Diablo Canyon Energy Balance Technique Using San Onofre... Unit 1 Masonry Wall Tests. Proprietary Version Withheld (Ref 10CFR2.790).Affidavits Encl Project stage: Other ML16341D7071986-04-10010 April 1986 Forwards Nonproprietary & Proprietary Versions of Verification of Diablo Canyon Energy Balance... & to Assist in Evaluation of Masonry Walls.Proprietary Version Withheld (Ref 10CFR2.70(b)(6)).W/o Encls Project stage: Other ML16341D7031986-04-10010 April 1986 Responds to 860327 Application for Withholding Diablo Canyon Power Plant,Units 1 & 2 - Verification of Diablo Canyon Energy Balance Technique Using SONGS-1 Masonry Walls Tests .... Rept Will Be Withheld (Ref 10CFR2.790) Project stage: Other ML20213E3411986-11-0404 November 1986 Forwards Nonproprietary & Proprietary Version of TER-C5506-648, Masonry Wall Design,Diablo Canyon Units 1 & 2. Energy-balance Technique as Applied to Masonry Walls Acceptable.W/O Proprietary Version.Record Copy Project stage: Other ML16341D9621986-11-0404 November 1986 Forwards Nonproprietary & Proprietary Version of TER-C5506-648, Masonry Wall Design,Diablo Canyon Units 1 & 2. Energy-balance Technique as Applied to Masonry Walls Acceptable.W/O Proprietary Version Project stage: Other 1985-11-18
[Table View] |
Text
REGULATORY QORMATION DISTRIBUTION SYQM (RIDS)
ACCESSION NBR:851127022'1-.
DOC ~ DATE': 85/11/15 NOTARIZED:
YES FACIL'.50-000 Generic Docket DOCKET' 05000000 50-275 Diablo Canyon Nuclear Power PlantE Unit 1i Pacif)c Ga 05000275 50-323 Diablo Canyon Nuclear Power" Plant'E Unit 2'g Pacific Gat 05000323 AUTH,NAhlE AUTHOR AFFILIATION SHIFFEREJ,Oe Pacific Gas 8, Electric Co ~
'ECIP.
NAME'-
RECIPIENT. AFF IL'IATION Tc KNIGHTON g G ~ H ~
Licensing Branch 3
I
SUBJECT:
Forwards= proprietary L nonproprietary versions of draft "Verification of Diablo Canyon Energy Balance Technique'sing San Onofre Nuclear Generating Station 1 Masonry Nell p,
Tests," Proprietar~
rept withheld (ref 10C+R2.79 ),
"!!g" ~
~
Z<"-:P>>,.
- i:: ~-."'~><
rmim 1! +
J DISTi'JBBT/lorn?CODE:I?AOO'Io 'COT'IES RECEI!>>EV:?'TR~g fflCL g~
SIZE:
P I'ITLk OR Submittal:
General Distribution Jl>>!L
>>Z!~
NOTES:NRR PNR-B: ISAPO icy.
OBOOOEOe OL:03/27/67 050,00275 OL:09/22/81 RECIPIENT ID CODE/NAME".
PWR A PD1 PD 01.
INTERNAL: ACRS 09
/
ELD/HOS2 NRR PNR"A EB NRR/OHFT/TSCB NRR/DSRO 0 IR NRR/ORAS RGN5 COPIES LTTR ENCL.
5 5
6 6
1 0
1 1
1 1
1 1
1 0
1 1
REC IP IENT ID CODE/NAME'HReeA PD3'D 01 ADM/LFMB NRR BNR EB NRR PNR B
EB NRR/DS I/METB N
REG F ILE, COPIES LTTR ENCL 5
5 1
0 1
1>>
1 1
1 1
1 ~
1 li EXTERNAL: 24X LPDR NS'I C 03 05 1
1 3
3 1
1 p
1 1
EGSG BRUSKEES NRC PDR 02' 1>>
1 1
+b
.'OTAL NUMBER OF COPIES REQUIRED:
LTTR 36'NCL 33
%I4'
'll 1,
1
~e,Q
~
>i
)I P
AI 5
PA.ClF XC GA.S AND ELECTR IC C GMPA.KT IF(B~'K 77 BEALE STREET
~
SAN FRANCISCO, CALIFORNIA94106
~
(415) 781-4211
~
TWX 910 372 65&7 JAMES D. SHIFFKA VICC tRt5IDCHT 8'
FuhSt CtÃNATiOH November 15, 1985 PGandE Letter No.:
DCL-85-343 Hr. George M. Knighton, Chief Licensing Branch No.
3 Division of Licensing Office of Nuclear Reactor Regulation U.
S.
Nuclear Regulatory Commission Mashington, D. C.
20555 Re:
Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1
and 2
Hasonry Walls License Condition - Draft Report
Dear Mr. Knighton:
PGandE met with the NRC Staff on November 5, 1985 in Bethesda, Maryland to discuss structural acceptance criteria related to the analysis of masonry walls.
At the meeting the NRC Staff requested copies of the PGandE draft report titled "Diablo Canyon Power Plant Units 1
and 2 - Yerification of Diablo Canyon Energy Balance Technique Using SONGS-1 Masonry Mall Tests."
The study contained in the draft repor t uses results of masonry wall panel tests performed by Southern California Edison Company (SCE) for San Onofre Nuclear Generating Station Unit 1 and an analysis technique developed by Bechtel Power Corporation (BPC).
The draft report includes information which is considered proprietary to SCE and BPC.
In accordance with 10 CFR 2.790, PGandE ik filing an application and supporting affidavits (Enclosure 1) for withholding from public. disclosure the draft report included as Enclosure 2.
The application and affidavits provide the basis on which the information should be withheld from public disclosure by the NRC Staff.
Three copies of the proprietary draft report are provided for Staff review, and three copies of the nonproprietary version are included as Enclosure 3.
Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.
Sincerely, Enclosures cc w/o encs:
Diablo Distribution 0598S/0038K/DWO/380 8511270221 851115 PDR ADOCH, 05000275 P