MONTHYEARDCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System DCL-23-092, Material Status Report for the Period Ending August 31, 20232023-09-28028 September 2023 Material Status Report for the Period Ending August 31, 2023 DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-27027 September 2023 License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors DCL-23-083, Upcoming Meeting with Nuclear Security and Incident Response Staff2023-09-13013 September 2023 Upcoming Meeting with Nuclear Security and Incident Response Staff DCL-23-078, Nuclear Material Transaction Report for New Fuel2023-09-0606 September 2023 Nuclear Material Transaction Report for New Fuel DCL-23-070, Withdrawal of Request Regarding Senior Reactor Operator License Application2023-08-16016 August 2023 Withdrawal of Request Regarding Senior Reactor Operator License Application DCL-23-068, Nuclear Material Transaction Report for New Fuel2023-08-0909 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-066, Nuclear Material Transaction Report for New Fuel2023-08-0303 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-065, Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure2023-07-27027 July 2023 Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure DCL-23-064, Nuclear Material Transaction Report for New Fuel2023-07-26026 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-054, License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-07-13013 July 2023 License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-055, Nuclear Material Transaction Report for New Fuel2023-07-0606 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-042, Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 02023-05-24024 May 2023 Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 0 DCL-23-032, Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program2023-05-22022 May 2023 Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program DCL-23-041, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20222023-05-22022 May 2023 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2022 DCL-23-038, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule2023-05-15015 May 2023 Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule DCL-23-034, 2022 Annual Nonradiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Nonradiological Environmental Operating Report DCL-23-036, 2022 Annual Radiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Radiological Environmental Operating Report DCL-23-025, 2022 Annual Radioactive Effluent Release Report2023-05-0101 May 2023 2022 Annual Radioactive Effluent Release Report DCL-2023-512, Submittal of Receiving Water Monitoring Program 2022 Annual Report2023-04-27027 April 2023 Submittal of Receiving Water Monitoring Program 2022 Annual Report DCL-23-035, Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application2023-04-24024 April 2023 Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application DCL-23-028, Technical Specification Bases, Revision 142023-04-24024 April 2023 Technical Specification Bases, Revision 14 DCL-2023-511, Report on Discharge Monitoring for the First Quarter of 20232023-04-20020 April 2023 Report on Discharge Monitoring for the First Quarter of 2023 DCL-23-031, Submittal of Annual Report of Occupational Radiation Exposure for 20222023-04-19019 April 2023 Submittal of Annual Report of Occupational Radiation Exposure for 2022 DCL-23-024, Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System2023-04-0404 April 2023 Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System DCL-23-022, 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant2023-03-29029 March 2023 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant DCL-23-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22023-03-28028 March 2023 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-23-021, Independent Spent Fuel Storage Installation, Emergency Plan Update2023-03-23023 March 2023 Independent Spent Fuel Storage Installation, Emergency Plan Update DCL-23-020, Responses to NRC Questions Regarding License Renewal Efforts2023-03-17017 March 2023 Responses to NRC Questions Regarding License Renewal Efforts DCL-23-009, Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage2023-02-22022 February 2023 Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage DCL-23-008, Request Regarding Senior Reactor Operator License Application2023-02-22022 February 2023 Request Regarding Senior Reactor Operator License Application DCL-2023-503, Annual Sea Turtle Report2023-01-26026 January 2023 Annual Sea Turtle Report DCL-2023-502, (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring2023-01-18018 January 2023 (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring DCL-22-091, Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage2022-12-20020 December 2022 Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage DCL-22-089, Core Operating Limits Report for Unit 2 Cycle 242022-12-20020 December 2022 Core Operating Limits Report for Unit 2 Cycle 24 DCL-22-085, Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application2022-10-31031 October 2022 Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application DCL-22-041, Site-Specific Decommissioning Cost Estimate, Revision 12022-10-12012 October 2022 Site-Specific Decommissioning Cost Estimate, Revision 1 DCL-22-042, Post-Shutdown Decommissioning Activities Report, Revision 12022-10-12012 October 2022 Post-Shutdown Decommissioning Activities Report, Revision 1 2024-01-29
[Table view] |
Text
Pacific Gas and Electric Company' James R. Becker Diablo Canyon Power Plant Site Vice President Mail Code 104/5/601 P. O Box 56 Avila Beach, CA 93424 805.545.3462 October 26, 2011 Internal:
691.3462 Fax: 805.545.6445 PG&E Letter DCL-11-104 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Diablo Canyon Units 1 and 2 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 License Amendment Request 11-07 Process Protection System Replacement
References:
- 1. Digital Instrumentation and Controls DI&C-ISG-06 Task Working Group #6: "Licensing Process Interim Staff Guidance," Revision 1, January 19, 2011 (ADAMS Accession No. ML1 10140103)2. Letter No. NRC-V10-11-001, B. Haynes (Invensys)to NRC,"Nuclear Safety-Related Qualification of the Tricon TMR Programmable Logic Controller (PLC) -Update to Qualification Summary Report Submittal and "Application for Withholding Proprietary Information from Public Disclosure (TAC No. ME2435)," dated January 5, 2011 (ADAMS Accession No. ML1 10140437)3. Letter No. 6002-00301, D. Dunsavage (CS Innovations) to NRC,"CS Innovations ALS Topical Report and Supporting Documents Submittal Follow Up of Non-proprietary Document Versions" dated August 13, 2010 (ADAMS Accession No. ML102570791)
- 4. NRC Letter from J. E. Dyer (NRC) to James R. Becker (PG&E), dated October 14, 2009 Dear Commissioners and Staff: Pursuant to 10 CFR 50.90, Pacific Gas and Electric Company (PG&E) hereby requests approval of the enclosed proposed amendment to Facility Operating License Nos. DPR-80 and DPR-82 for Units 1 and 2 of the Diablo Canyon Power Plant (DCPP) respectively.
The enclosed license amendment request (LAR)proposes to permanently replace the DCPP Eagle 21 digital process protection system (PPS) with a new digital PPS that is based on the Invensys Operations Management Tricon Programmable Logic Controller (PLC), Version 10, and the CS Innovations, LLC (a Westinghouse Electric Company), Advanced Logic System.A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway -. Comanche Peak
- Diablo Canyon o Palo Verde o San Onofre o South Texas Project o Wolf Creek Document Control Desk PG&E Letter DCL-1 1-104 October 26, 2011 Page 2 The current Eagle 21 PPS is a digital microprocessor-based system which provides process protection functions for the reactor protection system that is comprised of the reactor trip system and engineered safety features actuation system. The proposed PPS replacement consists of a microprocessor-based Tricon PLC and the field programmable gate array based Advanced Logic System that will improve the reliability and diversity of the PPS.The NRC has issued Interim Staff Guidance (ISG) in digital instrumentation and control (I&C) DI&C-ISG-06 (Reference
- 1) that describes the licensing process that may be used in the review of LARs associated with digital I&C system modifications.
This LAR is the pilot application for use of DI&C-ISG-06.
The LAR format and contents are consistent with the guidance provided in Enclosure E and Section C.3, respectively, of DI&C-ISG-06.
Prior to the submittal of this LAR, PG&E held four pre-application (DI&C-ISG-06 Phase 0) meetings with the staff on August 27, 2009, March 18, 2010, February 3, 2011, and June 7, 2011.DI&C-ISG-06 describes three different tiers of applications for approval of I&C system modifications.
Tier 1 is applicable to LARs proposing to reference a previously approved topical report regarding a digital I&C platform or component(s).
Tier 2 is applicable to LARs proposing to reference a previously approved topical report with deviations to suit the plant-specific application.
Tier 3 is applicable to LARs proposing to use a new digital I&C platform or component(s) with no generic approval.
This application consists of both a Tier 2 and Tier 3 application.
This application is a Tier 2 application for use of the Invensys Operations Management Tricon PLC, Version 10, that includes deviations from the previously approved topical report for the Tricon PLC, Version 9. Invensys Operations Management identified the deviations to Tricon PLC, Version 9, in the topical report for the Tricon PLC, Version 10, in Reference
- 2. This application is a Tier 3 application for use of the CS Innovations, LLC, Advanced Logic System. Westinghouse submitted the topical report for the Advanced Logic System in Reference 3.DI&C-ISG-06, Enclosure B, lists documents that are typically submitted by the licensee in support of a typical Tier 2 and Tier 3 submittal during Phases 1 and 2 of the NRC staff review. The Phase 1 documents that are associated with this application are summarized in Attachment 2 of the Enclosure.
All Phase 1 documents have already been submitted by Invensys Operations Management, CS Innovations, LLC, or Westinghouse Electric Company, or are contained in the Attachments to the Enclosure.
PG&E is providing the staff more than twelve months for NRC approval since the scope of change in the LAR is complex. DI&C-ISG-06 Enclosure B identifies Phase 2 documents to be submitted within twelve months of the requested approval date.A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- South Texas Project -Wolf Creek Document Control Desk PG&E Letter DCL-1 1-104 SOctober 26, 2011 Page 3 DI&C-ISG-06 Section C.4 states that documentation may be submitted in less than twelve months prior to the anticipated issuance of the amendment as mutually agreed with the staff in the Phase 0 meetings.
Some Phase 2 documents required manufacture and factory acceptance testing to complete the document.
During the June 7, 2011, Phase 0 meeting, PG&E identified that the vendor factory acceptance testing would be completed in December 2012.Phase 2 documents that have not been previously submitted to the staff will be submitted within 12 months of the requested approval date, by May 30, 2012, except for the specific Phase 2 documents identified below that require manufacture and factory acceptance testing to complete.The following Invensys Operations Management Phase 2 documents will be submitted by December 2012: Summary Test Reports (including Factory Acceptance Tests)Summary Test Results (including Factory Acceptance Tests)Summary of Final Digital Electromagnetic Interference, Temperature, Humidity, and Seismic Testing Results for 3601 TN Module System Response Time Confirmation As-Manufactured, System Configuration Documentation The following Westinghouse Phase 2 documents will be submitted by December 2012: Summary Test Reports (including Factory Acceptance Tests)Summary Test Results (including Factory Acceptance Tests)As-Manufactured, System Configuration Documentation The completion of the Final Safety Analysis Report (FSAR) changes and Technical Specification Bases changes requires completion of several supporting Phase 2 documents.
The FSAR changes and Technical Specification Bases changes will be submitted within 12 months of the requested approval date by May 30, 2012.The NRC previously granted a fee exemption for this LAR in accordance with 10 CFR 170.11(b) in Reference 4.PG&E requests approval of this LAR no later than May 2013 to support preparations for the Unit 1 Refueling Outage Eighteen (1 R1 8) which is currently scheduled to begin in February 2014. PG&E is currently working to a timeline to implement the PPS replacement in the 1 R1 8, but work scope for the 1 R1 8 has not been finalized.
Therefore, PG&E requests the license amendments be made effective upon NRC issuance, to be implemented prior to entry into Mode 4 following completion of the 1 R1 8 and the Unit 2 Refueling Outage Eighteen.A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway ° Comanche Peak
- Wolf Creek Document Control Desk PG&E Letter DCL-1 1-104October 26, 2011 Page 4 The enclosure to this letter contains the evaluation of the proposed change.This communication contains new commitments to be implemented following NRC approval of the LAR. The commitments are contained in Attachment 1 of the Enclosure.
In accordance with site administrative procedures and the Quality Assurance Program, the proposed amendment has been reviewed by the Plant Staff Review Committee.
Pursuant to 10 CFR 50.91, PG&E is sending a copy of this proposed amendment to the California Department of Public Health.If you have any questions or require additional information, please contact Tom Baldwin at 805-545-4720.
I state under penalty of perjury that the foregoing is true and correct.Executed on October 26, 2011.Sincerely, James .Becker Site Vice President kjse/4328 50271918 Enclosure cc: Diablo Distribution cc/enc: Gary W. Butner, Branch Chief, California Dept of Public Health Elmo E. Collins, NRC Region IV Michael S. Peck, NRC, Senior Resident Inspector James T. Polickoski, NRR Project Manager Alan B. Wang, Project Manager A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Cattaway