MONTHYEARDCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, “Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, “Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability DCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring DCL-24-020, Nuclear Material Transaction Report for New Fuel2024-02-21021 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-014, Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage2024-02-12012 February 2024 Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage DCL-24-013, Nuclear Material Transaction Report for New Fuel2024-02-0707 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-2024-502, 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP)2024-01-25025 January 2024 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP) DCL-2024-501, Sea Turtle Stranding Report (Green Sea Turtle)2024-01-24024 January 2024 Sea Turtle Stranding Report (Green Sea Turtle) DCL-2024-500, Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring2024-01-18018 January 2024 Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System DCL-23-092, Material Status Report for the Period Ending August 31, 20232023-09-28028 September 2023 Material Status Report for the Period Ending August 31, 2023 DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-27027 September 2023 License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors DCL-23-083, Upcoming Meeting with Nuclear Security and Incident Response Staff2023-09-13013 September 2023 Upcoming Meeting with Nuclear Security and Incident Response Staff DCL-23-078, Nuclear Material Transaction Report for New Fuel2023-09-0606 September 2023 Nuclear Material Transaction Report for New Fuel DCL-23-070, Withdrawal of Request Regarding Senior Reactor Operator License Application2023-08-16016 August 2023 Withdrawal of Request Regarding Senior Reactor Operator License Application DCL-23-068, Nuclear Material Transaction Report for New Fuel2023-08-0909 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-066, Nuclear Material Transaction Report for New Fuel2023-08-0303 August 2023 Nuclear Material Transaction Report for New Fuel 2024-09-09
[Table view] Category:License-Fitness for Duty (FFD) Performance Report
MONTHYEARML24046A2672024-02-15015 February 2024 Single Positive Test Form Collected on 06/22/2023 ML24046A2882024-02-15015 February 2024 Single Positive Test Form Collected on 12/11/2023 ML24046A2842024-02-15015 February 2024 Single Positive Test Form Collected on 09/18/2023 ML24046A2872024-02-15015 February 2024 Single Positive Test Form Collected on 11/16/2023 ML24046A2862024-02-15015 February 2024 Single Positive Test Form Collected on 11/08/2023 ML24046A2812024-02-15015 February 2024 Single Positive Test Form Collected on 09/27/2023 ML24046A2742024-02-15015 February 2024 Single Positive Test Form Collected on 08/21/2023 ML24046A2852024-02-15015 February 2024 Single Positive Test Form Collected on 10/02/2023 ML24046A2702024-02-15015 February 2024 Single Positive Test Form Collected on 07/31/2023 ML24046A2712024-02-15015 February 2024 Single Positive Test Form Collected on 08/14/2023 ML24046A2642024-02-15015 February 2024 Single Positive Test Form Collected on 02/06/2023 ML24046A2652024-02-15015 February 2024 Single Positive Test Form Collected on 03/06/2023 ML24046A2662024-02-15015 February 2024 Single Positive Test Form Collected on 03/06/2023 ML24046A2692024-02-15015 February 2024 Single Positive Test Form Collected on 07/24/2023 ML24046A2622024-02-15015 February 2024 Annual Fatigue Report Form for 2023 ML24046A2632024-02-15015 February 2024 Single Positive Test Form Collected on 01/05/2023 ML24046A2612024-02-15015 February 2024 Annual Report Form for Drug and Alcohol Tests for 2023 ML24046A2832024-02-15015 February 2024 Single Positive Test Form Collected on 09/26/2023 ML24046A2782024-02-15015 February 2024 Single Positive Test Form Collected on 09/11/2023 ML24046A2762024-02-15015 February 2024 Single Positive Test Form Collected on 08/30/2023 ML24046A2752024-02-15015 February 2024 Single Positive Test Form Collected on 08/24/2023 ML24046A2732024-02-15015 February 2024 Single Positive Test Form Collected on 08/21/2023 ML24046A2822024-02-15015 February 2024 Single Positive Test Form Collected on 09/26/2023 ML24046A2682024-02-15015 February 2024 Single Positive Test Form Collected on 06/26/2023 ML24046A2772024-02-15015 February 2024 Single Positive Test Form Collected on 09/18/2023 ML24046A2722024-02-15015 February 2024 Single Positive Test Form Collected on 08/14/2023 ML24046A2802024-02-15015 February 2024 Single Positive Test Form Collected on 09/19/2023 ML24046A2792024-02-15015 February 2024 Single Positive Test Form Collected on 09/19/2023 ML23033A6432023-02-0202 February 2023 Single Positive Test Form Collected on 03/21/2022 ML23033A6372023-02-0202 February 2023 Single Positive Test Form Collected on 03/09/2022 ML23033A6502023-02-0202 February 2023 Single Positive Test Form Collected on 10/06/2022 ML23033A6472023-02-0202 February 2023 Single Positive Test Form Collected on 06/30/2022 ML23033A6512023-02-0202 February 2023 Single Positive Test Form Collected on 10/04/2022 ML23033A6492023-02-0202 February 2023 Single Positive Test Form Collected on 09/28/2022 ML23033A6422023-02-0202 February 2023 Single Positive Test Form Collected on 03/21/2022 ML23033A6482023-02-0202 February 2023 Single Positive Test Form Collected on 09/19/2022 ML23033A6402023-02-0202 February 2023 Single Positive Test Form Collected on 03/14/2022 ML23033A6412023-02-0202 February 2023 Single Positive Test Form Collected on 03/21/2022 ML23033A6462023-02-0202 February 2023 Single Positive Test Form Collected on 06/21/2022 ML23033A6442023-02-0202 February 2023 Single Positive Test Form Collected on 04/11/2022 ML23033A6362023-02-0202 February 2023 Single Positive Test Form Collected on 03/14/2022 ML23033A6302023-02-0202 February 2023 Single Positive Test Form Collected on 01/25/2022 ML23033A6522023-02-0202 February 2023 Single Positive Test Form Collected on 11/01/2022 ML23033A6532023-02-0202 February 2023 Annual Fatigue Report Form for 2022 ML23033A6352023-02-0202 February 2023 Single Positive Test Form Collected on 03/10/2022 ML23033A6292023-02-0202 February 2023 Single Positive Test Form Collected on 01/10/2022 ML23033A6282023-02-0202 February 2023 Annual Report Form for Drug and Alcohol Tests for 2022 ML23033A6312023-02-0202 February 2023 Single Positive Test Form Collected on 02/01/2022 ML23033A6342023-02-0202 February 2023 Single Positive Test Form Collected on 02/28/2022 ML23033A6322023-02-0202 February 2023 Single Positive Test Form Collected on 02/07/2022 2024-02-15
[Table view] |
Text
PacificGas and Electric Company James R. Becker Diablo Canyon Power Plant Site Vice President Mail Code 104/5/601 P 0. Box 56 Avila Beach, CA 93424 805.545.3462 February 26, 2009 Internal: 691.3462 Fax: 805.545.6445 PG&E Letter DCL-09-008 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Semi-Annual Fitness for Duty Performance Report for the Period of July through December 2008.
Dear Commissioners and Staff:
Pursuant to 10 CFR 26.717, Pacific Gas and Electric Company (PG&E) is submitting the enclosed Fitness for Duty (FFD) Performance Report for the period July through December 2008. The performance data have been compiled on the standard forms developed by the Nuclear Energy Institute, and are provided in . As noted in Enclosure 1, individuals being screened for initial unescorted access (pre-employment testing 30 days prior to being cleared) are tested at lower cutoff levels for marijuana and amphetamines, and for 2 additional substances. This testing is reported under the pre-access category, and is conducted in accordance with 10 CFR 26.
Statistical analysis of the data was conducted and the results are provided in . During this period, no licensed operators or supervisors tested positive. Enclosure 3 provides a summary of program activities for the reporting period.
If you have any questions regarding the information enclosed or other FFD Program activities, please contact William F. Ryan, Access/FFD Supervisor, at (805) 545-3329. _
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance 14-02-(
Callaway
- Diablo Canyon - Palo Verde
- San Onofre - South Texas Project - Wolf Creek
Document Control Desk PG&E Letter DCL-09-008 February 26, 2009 Page 2 swh/64002706 Enclosures cc: Diablo DistribLJtion cc/enc: Elmo E. Collin s, NRC Region IV Richard E. En]keboll, NEI Michael S. Pe ck, NRC Senior Resident Inspector Alan B. Wang YNRC Project Manager A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- South Texas Project - Wolf Creek
Enclosure 1 PG&E Letter DCL-09-008 FITNESS FOR DUTY PERFORMANCE DATA JULY THROUGH DECEMBER 2008
Enclosure 1 PG&E Letter DCL-09-008 Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 PACIFIC GAS AND ELECTRIC COMPANY DECEMBER 31, 2008 Company 6 Months Ending DIABLO CANYON POWER PLANT Location WILLIAM F. RYAN. ACCESS/FITNESS FOR DUTY SUPERVISOR (8051 545-3329 Contact Name Phone (including area code)
Cutoffs: Screen/Confirmation (ng/ml) El Appendix A to 10 CFR 26 Pre-employment Screening Mariiuana 20 / 10 Amr)hetamines 300 / 250 Barbiturates 300 / 250 Cocaine 300 / 150 Phe ncyclidine 25 / 25 Benzodiazepines 300 / 250 Opiates 300 / 300 Alcc hol (% BAC) 0.04%
Testing Results Licensee Long-Term Short-Term Employees Contractor Personnel Contractor Personnel Average Number with Unescorted Access 2560 1700 860*
Categories Tested Positive Tested Positive Tested Positive Pre-Access 55 1 135 4 963 5 For Post-accident 0 0 1 0 1 0, Cause Observed behavior 2 0 1 0 0 0 Random 391 0 93 0 103 0 Follow-up 33 0 16 0 26 1 Other** 4 0 10 0 21 0 Total 485 1 256 4 1114 6 Includes long- and short-term contractors; differentiation between the two is not obtainable Testing of FFD Administrative Staff 1
Enclosure 1 PG&E Letter DCL-09-008 Breakdown of Confirmed Positive Tests for Specific Substances.
Marijuana Amphe-Cocaine Opiates tmns Phency-c Benzo- siAcohol IoTs idiediazepine Refusal oa Licensee Employees 1 0 0 0 0 0 0 0 1 Long-Term Contractors 4 0 0 0 0 0 0 0 4 Short-Term Contractors 6 0 0 0 0 0 0 0 6 Total 11 0 0 o o 0 oo 0 0 o I o o i0 1 _
E1:
2
Enclosure 2 PG&E Letter DCL-09-008 STATISTICAL ANALYSIS FOR REPORTING PERIOD JANUARY THROUGH DECEMBER 2008 Analysis of the data indicates that 52.9 percent of the average eligible population was randomly tested during the period January 1, 2008, through December 31, 2008.
The overall positive test rate for this period was 0.59 percent. Pre-access tests for short-term contractor personnel accounted for 45.5 percent of all positive tests. The large number of positive tests recorded for short-term contractor personnel in the pre-access testing category is attributable to the 1R1 5 Refueling Outage.
There were no random positive test results during this reporting period. The random positive rate for 2008 is 0.07 percent.
Pacific Gas and Electric Company submitted blind performance specimens in accordance with 10 CFR 26.168 requirements. There was one reportable event, see for additional information.
Enclosure 3 PG&E Letter DCL-09-008 FITNESS FOR DUTY PROGRAM ACTIVITY REPORT Activity 1: Unsatisfactory performance test result On August 11, 2008, a blind performance specimen processed at a drug testing laboratory was reported with a negative result. The performance specimen had been spiked with phencyclidine (PCP), and a positive result should have been reported. The laboratory review found-that a posting error to the laboratory computer system caused the incorrect report. The laboratory reported that, "this issue has been reviewed with the certifying scientist involved and training will be conducted with all certifying scientists regarding accurate entry of GC/MS results." A separate report about this was submitted to the NRC on September 19, 2008, (reference PG&E Letter DCL-08-083).