DCL-07-033, Annual Report of Occupational Radiation Exposure for 2006

From kanterella
Jump to navigation Jump to search
Annual Report of Occupational Radiation Exposure for 2006
ML071000083
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/30/2007
From: Becker J
Pacific Gas & Electric Co
To:
Office of Nuclear Regulatory Research
References
DCL-07-033
Download: ML071000083 (1)


Text

WI Pacific Electric Gas and Company James R. Becker Diablo Canyon Power Plant Vice President P. 0. Box 56 Diablo Canyon Operations and Avila Beach, CA 93424 Station Director 805.545.3462 March 30, 2007 Fax: 805.545.4234 PG&E Letter DCL-07-033 REIRS Project Manager Office of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission MS T-9F31 Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Annual Report of Occupational Radiation Exposure for 2006 REIRS Project Manager:

In accordance with 10 CFR 20.2206(c), Pacific Gas and Electric Company (PG&E) has submitted the Annual Report of Occupational Radiation Exposure for individuals monitored at Diablo Canyon Power Plant during the 2006 calendar year. The report was created on March 13, 2007, in the electronic format specified in Regulatory Guide 8.7, Revision 2, "Instructions for Recording and Reporting Occupational Radiation Exposure Data." The data was submitted electronically on the Radiation Exposure Information and Reporting System (REIRS) web page http://www.reirs.com/reporting.html, on March 13, 2007.

If you have any questions about the report, please contact Linda Sewell at (805) 545-4315.

Sincer ly, James R. cker ehmb/3928/R0284937 cc: Dr. Bruce S. Mallett, NRC Region IV Terry W. Jackson, NRC Senior Resident Inspector Alan B. Wang, NRC Project Manager Diablo Distribution NRC Document Control Desk A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak o Diablo Canyon
  • Palo Verde
  • Wolf Creek N