DCL-04-014, Transmittal of Semi-Annual Fitness-for-Duty Performance Report for Period of July - December 2003

From kanterella
(Redirected from DCL-04-014)
Jump to navigation Jump to search
Transmittal of Semi-Annual Fitness-for-Duty Performance Report for Period of July - December 2003
ML040620446
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/20/2004
From: Oatley D
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-04-014
Download: ML040620446 (6)


Text

PacificGas and Electric Company David H. Oatley Diablo Canyon Power Plant Vice President and PO. Box 56 General Manager Avila Beach, CA 93424 February 20, 2004 Fax: 905545.4234 PG&E Letter DCL-04-014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Semi-Annual Fitness for Duty Performance Report for the Period of July through December 2003

Dear Commissioners and Staff:

Pursuant to 10 CFR 26.71 (d), PG&E is submitting the enclosed Fitness for Duty (FFD) Performance Report for the period of July through December 2003. The performance data have been compiled on the standard forms developed by the Nuclear Energy Institute and are provided in Enclosure 1. As noted in Enclosure 1, individuals being screened for initial unescorted security access (pre-employment testing 60 days prior to being cleared) are tested at lower cut-off levels for marijuana and amphetamines, and two additional substances. This testing is reported under the pre-access category and is conducted in accordance with 10 CFR 26.

Statistical analysis of the FFD performance data for the entire year 2003 was conducted and the results are provided in Enclosure 2.

During this period, no licensed operators or supervisors tested positive. There were no significant FFD event reports made during the period.

If you have any questions regarding the information enclosed or other FFD Program activities, please contact William F. Ryan, Access/FFD Supervisor, at (805) 545-3329.

Sincerely, David H. Oatley A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Document Control Desk PG&E Letter DCL-04-014 February 20, 2004 Page 2 swh/R02501 94 Enclosures cc: Diablo Distribution cc/enc: Richard E. Enkeboll, NEI Bruce S. Mallett David L. Prouix Girija S. Shukla

Enclosure I PG&E Letter DCL-04-014 FITNESS FOR DUTY PERFORMANCE DATA JULY THROUGH DECEMBER 2003

Enclosure 1 PG&E Letter DCL-04-014 Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 PACIFIC GAS AND ELECTRIC COMPANY December 31, 2003 Company 6 Months Ending DIABLO CANYON POWER PLANT Location WILLIAM F. RYAN, ACCESS/FITNESS FOR DUTY SUPERVISOR (805) 545-3329 Contact Name Phone (including area code)

Cutoffs: Screen/Confirmation (nglml) El Appendix A to 10 CFR 26 Pre-employment Screening Mariiuana 20 / 10 Amphetamines 300 / 250 Barbiturates 300 / 250 Cocaine 300 / 150 Phencyclidine 25 / 25 Benzodiazepines 300 /250 Opiates 300 / 300 A lcohol (% BAC) 0.04%

Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Numberwith 1418 295*

Unescorted Access: 1713 Categories Tested Positive Tested Positive Tested Positive Pre-Access 49 0 204 0 192 4 For Post-accident 0 0 0 0 0 0 C ause__ _ _ _ _ __ _ _ _ ___ _ _ _ _

Observed behavior 1 0 2 0 1 0 Random 383 0 46 0 8 0 Follow-up 47 0 1 0 7 0 Other** 8 0 17 0 0 0 Total 488 0 270 0 208 4

  • Includes long- and short term contractors; differentiation between the two is not obtainable
    • Testing of FFD Administrative Staff

Enclosure I PG&E Letter DCL-04-014 Breakdown of Confirmed Positive Tests for Specific Substances l l l Amphe- l Phency- Refusal I Marijuana ICocaine opiates I tamines I clidine Icohol I to Test Licensee Employees _

Long-Term Contractors _ =

Short Term Contractors 2 2*

Total +/- 2 [ =_I 2 = = ll_ 4l

  • One (1) of the samples was positive for multiple drugs to include: Methamphetamines/Amphetamines, Oxazepam, Cocaine and THC

Enclosure 2 PG&E Letter DCL-04-014 STATISTICAL ANALYSIS FOR REPORTING PERIOD JANUARY THROUGH DECEMBER 2003 Analysis of the data indicates that 52.1 percent of the average eligible population was randomly tested during 2003.

There were no random positive tests during 2003.

The overall positive test rate for the year was 0.74 percent. Pre-access tests for short-term contractor personnel accounted for 85 percent of all positive tests. The large number of positive tests recorded for short-term contractor personnel in the pre-access testing category is attributable to testing performed in support of 2R1 1 refueling outage.

PG&E submitted blind performance specimens in accordance with 10CFR26, Appendix A, Section 2.8(e)(2), requirements. There were no reportable events.