DCL-02-070, Dcl 02-070 Change 20 to Revision 18 of the Physical Security Plan.

From kanterella
Jump to navigation Jump to search
Dcl 02-070 Change 20 to Revision 18 of the Physical Security Plan.
ML023030156
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/23/2002
From: Ketelsen S, Parker L
Pacific Gas & Electric Co
To:
Office of Nuclear Reactor Regulation
References
DCL-02-070
Download: ML023030156 (3)


Text

- S I Alenioranditnt -- I Date: October 23, 2002 To: VARIOUS From: LARRY PARKER

Subject:

DCL 02-070 "Change 20 to Revision 18 of the Physical Security Plan" Pacific Gas and Electric Company The attached letter is being re-distributed because we believe the original distribution may not have included all of the specified drawings, nor the required number of copies of each drawing.

If you have questions, please feel free to call Larry Parker at 805.545.3386 or e-mail him at lmpl@pge.com.

Sincerely, Stan Ketelsen Manager Regulatory Services If

PacificGas and Electric Company David H. Oatley Diablo Canyon Power Plant

=*Vice DiabloPresident Canyon Operations PO Box Avila 56 CA 93424 Beach, June 20, 2002 805.545.4350 Fax 805 545 4234 PG&E Letter No. DCL-02-070 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units I and 2 Change 20 to Revision 18 of the Physical Security Plan

Dear Commissioners and Staff:

Enclosure 2 contains safeguards information regarding Change 20 to Revision 18 of the Diablo Canyon Power Plant Physical Security Plan (PSP). These changes do not decrease the safeguards effectiveness of the plan and are submitted pursuant to 10 CFR 50.54(p). These changes are submitted in accordance with

_-* 10 CFR 50.4(b)(4), with the original and three copies sent to the Document Control Desk, and two copies to the Region IV Office.

Enclosure I describes the changes to the PSP. Please handle Enclosure I per 10 CFR 2.790. Enclosure 2 contains all pages of the sections or appendices that incorporate Change 20 to Revision 18 of the PSP. Specific changes are indicated by sidebars in the margin. Enclosure 2 contains Security Safeguards Information and must be handled accordingly.

Should you require further information or clarification, please contact Ron Todaro, Manager of Security Services, at (805) 545-4309.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak e Diablo Canyon a Pato Verde
  • South Texas Project a Wolf Creek SECURITY SAFEGUARDS INFORMATION When separated from enclosure 2, handle this document as non-safeguards.

IT, I Document Control Desk PG&E Letter No. DCL-02-070 June 20, 2002 Page 2 Sincerely, David H. Oatley Imp/

Enclosures cc: David L. Proulx Girija S. Shukla cc/enc: Ellis W. Merschoff (2)

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway o Comanche Peak

  • Diablo Canyon
  • Palo Verde a South Texas Project a Wolf Creek SECUR[TY SAFEGUARDS INFORMATION When separated from enclosure 2, handle this document as non-safeguards.