DCL-02-028, Twenty-Day Answer to NRC Order for Interim Safeguards and Security Compensatory Measures

From kanterella
Jump to navigation Jump to search
Twenty-Day Answer to NRC Order for Interim Safeguards and Security Compensatory Measures
ML020850649
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/18/2002
From: Oatley D
Pacific Gas & Electric Co
To: Collins S
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-02-028
Download: ML020850649 (5)


Text

Pacific Gas and Electric Company David H. Oatley Diablo Canyon Power Plant Vice President PO.Box 56 Diablo Canyon Operations Avila Beach, CA 93424 805.545.4350 March 18, 2002 Fax: 805.545.4234 PG&E Letter DCL-02-028 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 ATTN: Mr. Samuel J. Collins Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North, Room 5 D2, Mail Stop 0-5 E7 11555 Rockville Pike Rockville, MD 20852-2738 Diablo Canyon Units 1 and 2 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Twenty-Day Answer to NRC Order for Interim Safequards and Security Compensatory Measures

Dear Mr. Collins:

in which the This letter is in response to the NRC letter dated February 25, 2002, issued an "Order" to U.S. Nuclear Regulatory Commission (NRC or Commission)

Pacific Gas and Electric Company (PG&E) that modifies the current operating was licenses for Diablo Canyon Power Plant (DCPP), Units 1 and 2. The Order and immediately effective and requires compliance with specific interim safeguards security compensatory measures as stated in attachment 2 to the Order.

this letter is The Order requires an answer within twenty (20) days. Enclosure 1 to is a the 20-day answer for DCPP. Enclosure 2 (contains Safeguards Information) comply with each description of DCPP's compliance and the actions being taken to a schedule of the Interim Compensatory Measures specified in the Order, including for implementation.

Under a separate letter to the NRC's Mr. Samuel J. Collins, dated March 18, 2002, PG&E is requesting an extension to respond to three Interim Compensatory Measures: B.2.a(1), B.2.a(2), and B.2.b.

SAFEGUARDS INFORMATION of NOTICE: Enclosure 2 contains "Safeguards Information." Upon separation Enclosure 2, this letter, including Enclosure 1 is "Decontrolled."

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Project e Wolf Creek Catlaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde

PG&E Letter DCL-02-028 Document Control Desk March 18, 2002 Page 2 Sincerely, David H. Oatley Vice President, Diablo Canyon Operations LMP/A0550265 Enclosures cc/enc: Ellis W. Merschoff, Region IV Glenn M. Tracy, EDO cc: David L. Proulx, Resident Girija S. Shukla, NRR Diablo Distribution SAFEGUARDS INFORMATION NOTICE: Enclosure 2 contains "Safeguards Information." Upon separation of Enclosure 2, this letter, including Enclosure 1 is "Decontrolled."

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Creek Callaway e Comanche Peak a Diablo Canyon a Palo Verde

  • WoLf

PG&E Letter DCL-02-028 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

)) Docket No. 50-275 Facility Operating License In the Matter of No. DPR-80 PACIFIC GAS AND ELECTRIC COMPANY ))

Docket No. 50-323 Diablo Canyon Power Plant ) Facility Operating License Units 1 and2 )) No. DPR-82 AFFIDAVIT that he is David H. Oatley, of lawful age, first being duly sworn upon oath says Company; that Vice President, Diablo Canyon Operations of Pacific Gas and Electric dated he has executed the twenty-day answer to the NRC Security Order with full power and authority to do so; February 25, 2002, on behalf of said company therein are true that he is familiar with the content thereof; and that the facts stated and correct to the best of his knowledge, information, and belief.

David H. Oatley Vice President, Diablo Canyon Operations day of March, 2002 Subscribed and sworn to before me this 18th SANDRA L.RECTORt Commission# 1339380 Notary Public Notary Public - California z County of San Luis Obispo San Luis Obispo County State of California MyCm.Exprs Jan 12.2006

Enclosure 1 PG&E Letter DCL-02-028 20-Day Answer to Order reporting requirements:

The NRC order of February 25, 2002, included the following III B. 1. All Licensees shall, within twenty (20) days of the date of this Order, with any of the notify the Commission, (1) if they are unable to comply with any of requirements described in Attachment 2, (2) if compliance or (3) the requirements is unnecessary in their specific circumstances, the Licensee if implementation of any of the requirements would cause regulation or the to be in violation of the provisions of any Commission facility license. The notification shall provide the Licensees' justification for seeking relief from or variation of any specific requirement.

of the

2. Any Licensee that considers that implementation of any adversely requirements described in Attachment 2 to this Order would within impact safe operation of the facility must notify the Commission, impact, the basis twenty (20) days of this Order, of the adverse safety safety for its determination that the requirement has an adverse impact, and either a proposal for achieving the same objectives a schedule specified in the Attachment 2 requirement in question, or adverse safety condition. If for modifying the facility to address the its neither approach is appropriate, the Licensee must supplement as a response to Condition BI of this Order to identify the condition justifications requirement with which it cannot comply, with attendant ag required in Condition B1.

C. 1. All Licensees shall, within twenty (20) days of the date of this Order, with submit to the Commission, a schedule for achieving compliance each requirement described in Attachment 2.

2. All Licensees shall report to the Commission, when they have in achieved full compliance with the requirements described Attachment 2.

SAFEGUARDS INFORMATION Upon separation of NOTICE: Enclosure 2 contains "Safeguards Information."

Enclosure 2, this letter, including Enclosure 1 is "Decontrolled."

Enclosure 1 PG&E Letter DCL-02-028 PG&E Answer:

Measures in the The following answer applies to all the Interim Compensatory an extension (see PG&E Order, except for those for which PG&E is requesting 18, 2002).

Letter to Mr. Samuel J. Collins, DCL-02-029, dated March in Item B1: PG&E is able to comply with and will implement the requirements understanding of Attachment 2 of the Order. A description of PG&E's to implement each requirement and the means by which PG&E intends letter.

each requirement is provided in Enclosure 2 to this to be in Implementation of these requirements will not cause PG&E or regulations violation of the provisions of the applicable Commission the facility operating licenses.

Item B2: PG&E does not consider that the implementation of the requirements operation of in Attachment 2 to the Order would adversely impact safe DCPP Units I and 2.

of Item Cl: The schedule for achieving compliance with the requirements this letter.

Attachment 2 to the Order is included in Enclosure 2 to with the Item C2: PG&E will report to the Commission when full compliance requirements in Attachment 2 to the Order has been achieved.

2 SAFEGUARDS INFORMATION Upon separation of NOTICE: Enclosure 2 contains "Safeguards Information."

Enclosure 2, this letter, including Enclosure 1 is "Decontrolled."