Category:Letter type:CNL
MONTHYEARCNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-012, Revision to the Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02)2023-04-11011 April 2023 Revision to the Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report CNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-23-003, Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A2023-01-30030 January 2023 Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A CNL-23-011, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2023-01-18018 January 2023 Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements CNL-23-009, Response to Request for Additional Information Request to Revise Technical Specification 3.4.122023-01-0404 January 2023 Response to Request for Additional Information Request to Revise Technical Specification 3.4.12 CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat2022-11-28028 November 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2022-10-31031 October 2022 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-22-104, Correction to Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-022022-10-31031 October 2022 Correction to Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-02 CNL-22-098, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 552022-10-17017 October 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55 CNL-22-084, Response to Request for Additional Information Regarding License Amendment Request to License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07)2022-09-16016 September 2022 Response to Request for Additional Information Regarding License Amendment Request to License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07) CNL-22-085, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Al2022-09-0202 September 2022 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alte CNL-22-053, Response to Request for Additional Information Regarding Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis - Second Partial Response to Additional Requ2022-08-22022 August 2022 Response to Request for Additional Information Regarding Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis - Second Partial Response to Additional Reques CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-08-11011 August 2022 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-080, Request for Enforcement Discretion from the Requirements of Technical Specification 3.5.2, ECCS - Operating2022-07-22022 July 2022 Request for Enforcement Discretion from the Requirements of Technical Specification 3.5.2, ECCS - Operating CNL-22-081, Supplement to Sequoyah Nuclear Plant, Unit 1, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RP-122022-07-21021 July 2022 Supplement to Sequoyah Nuclear Plant, Unit 1, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RP-12 CNL-22-079, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RP-122022-07-20020 July 2022 American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RP-12 CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-069, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf.2022-07-0101 July 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. CNL-22-070, Status Regarding the Improved Flood Mitigation System Project2022-06-30030 June 2022 Status Regarding the Improved Flood Mitigation System Project CNL-22-062, Response to Request for Additional Information Regarding American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-022022-06-28028 June 2022 Response to Request for Additional Information Regarding American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-02 CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change CNL-22-068, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-06-0808 June 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-047, Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2022-05-23023 May 2022 Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-22-034, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03)2022-05-13013 May 2022 Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03) CNL-22-027, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 40 - Annual Update and Proposed Changes to Revision 402022-04-28028 April 2022 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 40 - Annual Update and Proposed Changes to Revision 40 CNL-22-023, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf2022-04-28028 April 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf 2024-01-17
[Table view] |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga , Tennessee 37402 CNL-14-229 December 31 , 2014 10 CFR 50.4 10 CFR 50 .55a ATTN : Document Control Desk U.S. Nuclear Regulatory Commission Washington , D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328
Subject:
American Society of Mechanical Engineers Request for Relief RP-07 In accordance with 10 CFR 50 .55a , "Codes and standards," the Tennessee Valley Authority (TVA) requests NRC approval of the enclosed Request for Relief RP-07 for the Sequoyah Nuclear Plant (SQN) , Units 1 and 2. The Code of Record for the current third 10-year interval is the 2001 Edition through 2003 Addenda of the American Society of Mechanical Engineers (ASME) , "Code for Operation and Maintenance of Nuclear Power Plants" (OM Code) .
TVA seeks to perform future inservice pump testing at SQN , in a manner consistent with the requirements stated in ASME OM Code Case OMN-21 . Specifically, testing of the pumps identified in the enclosure will be performed such that flow rate, or differential pressure, is adjusted as close as practical to the reference value and within tolerance limits of +2% I -1%
for flow rate, or +1% I -2% for differential pressure .
TVA requests approval of the proposed alternative by December 31 , 2015. The proposed alternative will be utilized for the remainder of the third 10-year interval , and for the entire fourth 10-year interval.
There are no new regulatory commitments contained in this letter. Please address any questions regarding this submittal to Erin Henderson at (423) 843-7170 .
J. W. Shea Vice President, Nuclear Licensing Enclosure cc: See Page 2
U.S. Nuclear Regulatory Commission Page 2 December 31 , 2014
Enclosure:
Request for Relief RP-07 cc (Enclosure) :
NRC Regional Administrator- Reg ion II NRC Senior Resident Inspector - Sequoyah Nuclear Plant
ENCLOSURE TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 AMERICAN SOCIETY OF MECHANICAL ENGINEERS CODE RELIEF REQUEST REQUEST FOR RELIEF RP-07
TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT, UNIT 1 and 2 REQUEST FOR RELIEF RP-07 I. ASME Code Components Affected Pump ID Pump Description Pump Type Code OM Class Group 0-PMP-67 -432 Essential Raw Cooling Water Vertical Line 3 A 0-PMP-67 -436 Pumps Shaft 0-PM P-67 -440 0-PMP-67 -444 0-PMP-67 -452 0-PMP-67 -456 0-PMP-67 -460 0-PMP-67 -464 0-PMP-70-51 Component Cooling Water Pumps Centrifugal 3 A 1-PMP-70-38 1-PMP-70-46 2-PMP-70-33 2-PMP-70-59 0-PMP-313-303 Shutdown Board Room Chilled Centrifugal 3 A 0-PMP-313-338 Water Pumps 1-PMP-62-230 Boric Acid Transfer Pumps Centrifugal 3 A 1-PMP-62-232 2-PMP-62-230 2-PMP-62-232 1-PMP-63-1 0 Safety Injection Pumps Centrifugal 2 B 1-PM P-63-15 2-PMP-63-10 2-PMP-63-15 1-PMP-72-1 0 Containment Spray Pumps Centrifugal 2 B 1-PMP-72-27 2-PMP-72-1 0 2-PMP-72-27 1-PMP-3-118 Auxiliary Feedwater (Motor) Pumps Centrifugal 3 A 1-PMP-3-128 2-PMP-3-118 2-PMP-3-128 E-1 of 3
Pump ID Pump Description Pump Type Code OM Class Group 1-PMP-3-142 Auxiliary Feedwater (Steam) Pumps Centrifugal 3 B 2-PMP-3-142 1-PMP-62-104 Centrifugal Charging Pumps Centrifugal 2 A 1-PMP-62-1 08 2-PMP-62-1 04 2-PMP-62-1 08 1-PMP-74-10 Residual Heat Removal Pumps Centrifugal 2 A 1-PMP-7 4-20 2-PMP-74-10 2-PMP-7 4-20 II. ASME Code Edition and Addenda ASME OM Code 2001 Edition through 2003 Addenda Ill. Applicable Code Requirement ISTB-5121 , "Group A Test Procedure": ISTB-5121 (b) states that, "The resistance of the system shall be varied until the flow rate equals the reference point. The differential pressure shall then be determined and compared to its reference value. Alternatively, the flow rate shall be varied until the differential pressure equals the reference point and the flow rate determined and compared to the reference flow rate value ."
ISTB-5122 , "Group B Test Procedure": ISTB-5122(c) states that, "System resistance may be varied as necessary to achieve the reference point."
ISTB-5123, "Comprehensive Test Procedure": ISTB-5123(b) states that, "For centrifugal and vertical line shaft pumps, the resistance of the system shall be varied until the flow rate equals the reference point. The differential pressure shall then be determined and compared to its reference value. Alternatively, the flow rate shall be varied until the differential pressure equals the reference point and the flow rate determined and compared to the reference flow rate value ."
ISTB-5221 , "Group A Test Procedure": ISTB-5221 (b) states that, "The resistance of the system shall be varied until the flow rate equals the reference point. The differential pressure shall then be determined and compared to its reference value. Alternatively , the flow rate shall be varied until the differential pressure equals the reference point and the flow rate determined and compared to the reference flow rate value ."
ISTB-5222, "Group B Test Procedure": ISTB-5222(c) states that, "System resistance may be varied as necessary to achieve the reference point."
ISTB-5223, "Comprehensive Test Procedure": ISTB-5223(b) states that, "For centrifugal and vertical line shaft pumps, the resistance of the system shall be varied until the flow rate equals the reference point. The differential pressure shall then be determined and compared to its reference value. Alternatively, the flow rate shall be varied until the differential pressure equals the reference point and the flow rate determined and compared to the reference flow rate value ."
E-2 of 3
IV. Reason for Request Pursuant to 10 CFR 50.55a , "Codes and standards," paragraph (a)(3)(i) , an alternative is proposed to the pump testing reference value requirements of the ASME OM Code for the Sequoyah Nuclear Plant (SQN), Units 1 and 2. The basis for the request is that the proposed alternative provides an acceptable level of quality and safety. Specifically, this alternative is requested for inservice testing of the 1ST Program pumps listed above.
For pump testing , there is difficulty adjusting system throttle valves with sufficient precision to achieve exact flow reference values during subsequent 1ST exams. Section ISTB of the ASME OM Code does not allow for variance from a fixed reference value for pump testing . However, NUREG-1482 , Revision 2, Section 5.3, acknowledges that certain pump system designs do not allow for the licensee to set the flow at an exact value because of limitations in the instruments and controls for maintaining steady flow.
ASME OM Code Case OMN-21 provides guidance for adjusting reference flow/differential pressure to within a specified tolerance during inservice testing . The Code Case states, "It is the opinion of the Committee that when it is impractical to operate a pump at a specified reference point and adjust the resistance of the system to a specified reference point for either flow rate ,
differential pressure or discharge pressure, the pump may be operated as close as practical to the specified reference point with the following requirements. The Owner shall adjust the system resistance to as close as practical to the specified reference point where the variance from the reference point does not exceed +2% or -1% of the reference point when the reference point is flow rate , or +1% or -2% of the reference point when the reference point is differential pressure or discharge pressure."
V. Proposed Alternative and Basis for Use TVA seeks to perform future inservice pump testing at SQN in a manner consistent with the requirements stated in ASME OM Code Case OMN-21. Specifically, testing of the pumps identified in the above table will be performed such that flow rate , or differential pressure, is adjusted as close as practical to the reference value and within tolerance limits of +2% I -1% for flow rate , or +1% I -2% for differential pressure.
Using the provisions of this request as an alternative to the specific requirements of ISTB-5121 ,
ISTB-5122 , ISTB-5123, ISTB-5221 , ISTB-5222 and ISTB-5223 as described above will provide adequate indication of pump performance and continue to provide an acceptable level of quality and safety.
VI. Duration of the Proposed Alternative The proposed alternative will be utilized for the remainder of the third 10-year interval , and for the entire fourth 10-year interval.
VII. Precedents Callaway Plant Unit 1 Relief Request PR-06 (ADAMS No. ML13267A183)
E-3 of 3