BVY 04-085, Follow-up Response to Request for Additional Information Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan

From kanterella
(Redirected from BVY 04-085)
Jump to navigation Jump to search

Follow-up Response to Request for Additional Information Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan
ML042370313
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 08/19/2004
From: Thayer J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
BVY 04-085, TAC MC2984
Download: ML042370313 (2)


Text

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

Vermont Yankee

- En tergy 185 Old Ferry Rd.

RO. Box 500 Brattleboro, VT 05302 Tel 802-257-5271 SAFEGUARDS INFORMATION August 19, 2004 Vermont Yankee Docket No. 50-271 BVY 04-085 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Follow-up Response to Request for Additional Information Re:

Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (TAC No. MC2984)

References:

(1) NRC letter Robert J. Fretz to Jay K. Thayer dated July 23, 2004 regarding Request for Additional Information Re: Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (TAC No. MC2984), NW 04-072 (2) Entergy Nuclear Operations, Inc. letter to U.S. Nuclear Regulatory Commission dated August 12, 2004 regarding Response to Request for Additional Information Re: Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan (TAC No. MC2984)

BVY 04-082 Entergy Nuclear Operations, Inc., (ENO), Vermont Yankee Nuclear Power Plant is in receipt of your requests for additional information (RAls) (Reference 1). Our initial response to these RAls (Reference 2) identified two RAls for which we needed additional time to prepare thorough site specific responses.

This letter updates our response to those RAls with the site specific detail as requested.

Each RAI for which we are updating our response, is identified by the Safeguards Contingency Plan (SCP) Section referenced in the original RAI.

This letter contains no new commitments. As noted in Reference 2, revised plan pages will be submitted when all RAI questions are resolved.

SAFEGUARDS INFORMATION NOTICE: ATTACHMENT 1 CONTAINS 'SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1 FROM THIS LETTER, THIS LETTER BECOMES "DECONTROLLED."

A2 ;/'

SAFEGUARDS INFORMATION If you have any questions or require additional information, please contact Mitch McCluskie at (802) 258-4187.

I declare under penalty of perjury that the foregoing is true and correct. Executed on August 19, 2004.

JR K. Inayer

-51te Vice President Entergy Nuclear Operations, Inc Vermont Yankee Nuclear Power Station Attachments:

1. Follow-up Response to Request for Additional Information Re: Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan w/o attachments cc: Mr. Richard B. Ennis, Project Manager Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Mail Stop 0 8 81 Washington, DC 20555 Mr. Samuel J. Collins Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 SAFEGUARDS INFORMATION NOTICE: ATTACHMENT 1 CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT I FROM THIS LETTER, THIS LETTER BECOMES "DECONTROLLED."