BSEP 02-0058, February 2002 Monthly Operating Report for Brunswick, Units 1 & 2

From kanterella
Jump to navigation Jump to search
February 2002 Monthly Operating Report for Brunswick, Units 1 & 2
ML020800651
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/11/2002
From: Dicello D
Carolina Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BSEP 02-0058
Download: ML020800651 (8)


Text

SCP&L A Progress Energy Company rfAR 1 1 2002 SERIAL: BSEP 02-0058 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324/LICENSE NOS. DPR-71 AND DPR-62 FEBRUARY 2002 MONTHLY OPERATING REPORTS Ladies and Gentlemen:

In accordance with Technical Specification (TS) 5.6.4 for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2, Carolina Power & Light (CP&L) Company is submitting the enclosed Monthly Operating Reports for February 2002. These reports are being submitted to the NRC by the 15th day of the month following the calendar month covered by the reports, as specified in TS 5.6.4.

There are no regulatory commitments being made in this submittal. Please refer questions regarding this submittal to Mr. Leonard R. Beller, Supervisor - Licensing/Regulatory Programs, at (910) 457-2073.

Sincerely, David C. DiCello Manager - Regulatory Affairs Brunswick Steam Electric Plant CRE/cre

Enclosures:

1. BSEP, Unit No. 1 Monthly Operating Report February 2002
2. BSEP, Unit No. 2 Monthly Operating Report February 2002 Brunswick Nuclear Plant PO. Box 10429 Southport, NC28461

Document Control Desk BSEP 02-0058 / Page 2 cc (with enclosures):

U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Luis A. Reyes, Regional Administrator Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission ATTN: Mr. Theodore A. Easlick, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U. S. Nuclear Regulatory Commission ATTN: Mr. Allen G. Hansen (Mail Stop OWFN 8G9) (Electronic Copy Only) 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Jo A. Sanford Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 ElectriCities of N. C., Inc.

ATTN: Ms. Linda L. Anderson P. 0. Box 29513 Raleigh, NC 27626-0513

ENCLOSURE 1 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324/LICENSE NOS. DPR-71 AND DPR-62 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 1 MONTHLY OPERATING REPORT FEBRUARY 2002

APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-325 UNIT NAME Brunswick Steam Electric Plant, Unit No. 1 DATE March 7, 2002 COMPLETED BY Kester M. Thompson TELEPHONE (910) 457-2754 REPORTING PERIOD February 2002 (Month/Year)

YEAR TO DATE CUMULATIVE MONTH N/A N/A

1. Design Electrical Rating: 867 (MWe-Net) 820 N/A N/A
2. Maximum Dependable Capacity:

(MWe-Net) 672 1,416 154,392.0

3. Number of Hours the Reactor Was Critical:

672 1,416 149,992.7

4. Number of Hours the Generator Was On Line:

0 0 0

5. Unit Reserve Shutdown Hours:
6. Net Electrical Energy (MWH): 534,131 1,155,536 110,505,632

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-325 UNIT NAME Brunswick Steam Electric Plant, Unit No. 1 DATE March 7, 2002 COMPLETED BY Kester M. Thompson TELEPHONE (910) 457-2754 REPORTING PERIOD February 2002 (Month/Year)

TYPE METHOD OF F: FORCED DURATION SHUTTING CAUSE/CORRECTIVE ACTIONS NO. DATE S: SCHEDULED (HOURS) REASON (1) DOWN (2) COMMENTS Unit No. 1 was not required to shut down during the month of February 2002.

SUMMARY

(1) Reason (2) Method A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator TraininglLicense Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

ENCLOSURE 2 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324/LICENSE NOS. DPR-71 AND DPR-62 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 2 MONTHLY OPERATING REPORT FEBRUARY 2002

APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-324 UNIT NAME Brunswick Steam Electric Plant, Unit No. 2 DATE March 7, 2002 COMPLETED BY Kester M. Thompson TELEPHONE (910) 457-2754 REPORTING PERIOD February 2002 (Month/Year)

YEAR TO MONTH DATE CUMULATIVE N/A N/A

1. Design Electrical Rating: 867 (MWe-Net) 811 N/A N/A
2. Maximum Dependable Capacity:

(MWe-Net) 672 1,416 163,085.3

3. Number of Hours the Reactor Was Critical:

672 1,416 157,119.2

4. Number of Hours the Generator Was On Line:

0 0 0

5. Unit Reserve Shutdown Hours:
6. Net Electrical Energy (MWH): 552,807 1,165,128 111,111,921

APPENDIX B UNIT SHUTDOWNS DOCKET NO. 50-324 UNIT NAME Brunswick Steam Electric Plant, Unit No. 2 DATE March 7, 2002 COMPLETED BY Kester M. Thompson TELEPHONE (910) 457-2754 REPORTING PERIOD February 2002 (Month/Year)

TYPE METHOD OF F: FORCED DURATION SHUTTING CAUSE/CORRECTIVE ACTIONS NO. DATE S: SCHEDULED (HOURS) REASON (1) DOWN (2) COMMENTS Unit No. 2 was not required to shut down during the month of February 2002.

SUMMARY

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)