See Information Notice 2017-03, Anchor/Darling Double Disc Gate Valve Wedge Pin and Stem-Disc Separation Failures
Topic |
---|
|
|
All by date | | Start date | Site | Title |
---|
JAFP-24-0043, Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues | 12 September 2024 | FitzPatrick | Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues | IR 05000454/2024011 | 8 August 2024 | Byron | Phase 2 Post- Approval License Renewal Report 05000454/2024011 | IR 05000282/2024010 | 28 June 2024 | Prairie Island | Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 | IR 05000298/2024010 | 24 April 2024 | Cooper | Comprehensive Engineering Team Inspection Report 05000298/2024010 | ML23325A110 | 21 November 2023 | Browns Ferry | Anchor Darling Double Disc Gate Valve Commitment Revision | 05000388/LER-2023-001, Secondary Containment Bypass Leakage Limit Exceeded Due Inadequate Procedure Guidance Resulting in Failure of the Inboard Containment Isolation Valve to Close and Pressurize | 25 May 2023 | Susquehanna | Secondary Containment Bypass Leakage Limit Exceeded Due Inadequate Procedure Guidance Resulting in Failure of the Inboard Containment Isolation Valve to Close and Pressurize | ML23241A192 | 25 May 2023 | Diablo Canyon | 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-9, Drawing 108009, Sheet 4, Rev. 77, Safety Injection System | ML23241A239 | 25 May 2023 | Diablo Canyon | 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-7, Drawing 108007, Sheet 3, Rev. 51, Reactor Coolant System | ML23241A492 | 25 May 2023 | Diablo Canyon | 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-8, Drawing 108008, Sheet 4, Rev. 86, Chemical & Volume Control System | ML23241A648 | 25 May 2023 | Diablo Canyon | 7 to Updated Final Safety Analysis Report, Figure 3.2-8, Drawing 108008, Revision 105, Sheet 3, Chemical & Volume Control System |
|
---|