CFR 54.37(b) Report on How Effects of Aging of Newly Identified Structures, Systems, or Components Are Managed
ML25282A048
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/09/2025
From:
Point Beach
To:
Office of Nuclear Reactor Regulation
Shared Package
ML25282A060 List:
References
L-2025-162
Download: ML25282A048 (1)


Text

NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 10 CFR 54.37(b) Report - 2025 FSAR Update REPORT CONSISTENT WITH 10 CFR 54.37(b) ON HOW EFFECTS OF AGING OF NEWLY IDENTIFIED STRUCTURES, SYSTEMS, OR COMPONENTS ARE MANAGED This report addresses the requirements of 10 CFR 54.37(b) for the period between March 1, 2024 (the latest date of last year's report) and September 1, 2025. This review is performed in accordance with Fleet procedure EN-AA-106-1001.

Regulatory Requirements and Guidance 10 CFR 54.37(b)

After the renewed license is issued, the FSAR update required by 10 CFR 50. 71(e) must include any systems, structures, and components newly identified that would have been subject to an aging management review or evaluation of time-limited aging analysis in accordance with §54.21. This FSAR update must describe how the effects of aging will be managed such that the intended function(s) in §54. 4(b) will be effectively maintained during the period of extended operation.

RIS 2007-16, Revision 1 Newlvldentified Svstems. Structures. and Components (SSCs)

The intent of 10 CFR 54.37(b) is to capture those SSCs that, 1/ they had been identified at the time of the license renewal application, would have been subject to an aging management review or evaluation of TLAAs.

In the context of 10 CFR 54.37(b), newly identified SSCs that should be included in the next FSAR update required by 10 CFR 50. 71(e) are those SSCs that meet one of the two following condtlions:

(1)

There is a change to the current licensing basis (CLB) that meets the following crtleria:

The change impacts SSCs that were not in scope for license renewal when the NRG approved the license renewal application.

The SSCs would have been in the scope of license renewal based on the CLB change 1/ 10 CFR 54. 4(a) were applied to the SSCs.

(2)

SSCs were installed in the plant at the time of the license renewal review that, in accordance w1lh the CLB at the time, should have been included in the scope of license renewal per 1 O CFR 54. 4(a) but were not identified as in scope until after issuance of the renewed license.

SSCs that are plant add/lions or modt'ftcations installed after the renewed license is issued are not subject to the provisions of 10 CFR 54.37(b).

Identification of SSCs under 10 CFR 54.37(b)

The language of 1 O CFR 54. 3 7(b) does not lim1l how or who finds newly ident1'fted SSCs. A licensee may identify SSCs that should be w1lhin the scope of 1ls license renewal program at any time. The NRG staff may also discover newly identified SSCs. One way to identify these SSCs is through the LR-ISG process.

1

Newly Identified SSC The CLB review entailed the review of changes/ revisions to the Final Safety Analysis Report (FSAR),

Technical Specification (TS), Technical Specification Bases (TSB), Technical Requirements Manual (TRM),

and the Fire Protection Program Design Document (FPPDD). FSAR changes were reviewed based on the FSAR change summary provided with each annual FSAR update. The CLB review results are summarized below.

FSAR Change Review Results:

DESCRIPTION OF CHANGES Table of Contents Throughout Editorial Changes: Editorial changes were made to correct grammar, punctuation, spelling, and to ensure consistency between text headings, table titles, figure titles, table of contents, etc. These changes may not be identified by a revision bar.

Chanter 1 FSAR 1.2-7 through Editorial Change: Removed drawings from UFSAR.

FSAR 1.2-19 FSAR 1.2-10 Editorial Change: Updated Figure to reflect approved drawing of record.

(EC 299664)

Chanter 2 FSAR2.2-6 Editorial Change: Updated Figure to reflect approved drawing of record.

(EC 299664)

FSAR 2.2-6 Editorial Change: Removed drawing from UFSAR.

Chanter* 3 FSAR 3.2-100 Editorial Change: Updated Figure to reflect approved drawing of record.

(EC 300329)

Chante1*4 FSAR4.2-22 through Editorial Change: Removed drawings from UFSAR.

FSAR4.2-27 2

Cha1>ter 5 FSAR 5.2-9 and Licensing Change: Four ( 4) additional penetrations (4 la, b c d) listed in FSAR 5.2-71 Table 5.2-1 (Attachment 1). One figure will be added that represents the penetration (Attachment 2). (EC 300215)

FSAR 5.2-10 and Licensing Change: One(l) additional penetration (59a) listed in Table 5.2-1 FSAR 5.2-96 (Attachment l ). One figure will be added that represents the penetration (Attachment 2). (EC 30003 7)

FSAR 5.2-106 Editorial Change: Removed drawing from UFSAR.

FSAR 5.3-8 Editorial Change: Updated Figure to reflect approved drawing of record.

(EC 299664)

FSAR 5.3-8 through Editorial Change: Removed drawings from UFSAR.

FSAR 5.3-10 FSAR 5.7-5 Licensing Change: Added editorial reference to Relief Request CISI-03-01.

(EC 298817)

Chantel' 6 FSAR 6.2-43 through Editorial Change: Removed drawings from UFSAR.

FSAR6.2-45 FSAR 6.5-11 Editorial Change: Updated Figure to reflect approved drawing of record.

(EC 299664)

FSAR 6.5-11 Editorial Change: Removed drawing from UFSAR.

Chantel' 7 FSAR 7.2-36 Editorial Change: Removed drawing from UFSAR.

FSAR 7.3-21 Editorial Change: Removed drawing from UFSAR.

FSAR 7.4-8 Editorial Change: Removed drawing from UFSAR.

FSAR 7.6-13 Editorial Change: The system uses thermocouples control rod bank through positions, core inlet temperature, reactor power level, nuclear FSAR 7.6-14 instrnmentation power range detector signals, wide range and narrow range RTDs to develop a neutron flux distribution. (EC 299663)

FSAR 7.7-6 Editorial Change: Indication is provided for rod bottom positions for each rod. These indications, provided by the analog Rod Position Indication system, are also displayed on digital Rod Position Indicating Recorders (RPIR). (EC 299663) 3

Chante1* 8 FSAR 8.0-7 Editorial Change: Updated Figure to reflect approved drawing of record.

(EC 299664)

FSAR 8.0-7 through Editorial Change: Removed drawings from UFSAR.

FSAR 8.0-16 FSAR 8.0-10 Editorial Change: Updated Figure to reflect approved drawing of record.

(EC 299664)

FSAR 8.3-1 Editorial Change: The l 9kV system is credited in the event of a fire and bas been evaluated in the non-power analyses (Reference 1 ). (EC 299663)

Chante1* 9 FSAR 9.1-11 through Edit01ial Change: Removed drawings from UFSAR.

FSAR9.1-12 FSAR 9.2-7 Editorial Change: Removed drawing from UFSAR.

FSAR 9.3-30 through Editorial Change: Removed drawings from UFSAR.

FSAR 9.3-34 FSAR 9.6-9 through Editorial Change: Removed drawings from UFSAR.

FSAR 9.6-15 FSAR9.6-12 Editorial Change: Updated Figure to reflect approved drawing of record.

(EC 299664)

FSAR 9.9-7 Editorial Change: References in UFSAR Section 9.9.5 are updated to correct a typo in Reference 12. (EC 300329)

FSAR 9.9-12 Editorial Change: Removed drawing from UFSAR.

FSAR 9.11-10 Editorial Change: Updated Figure to reflect approved drawing of record.

(EC 299664)

FSAR 9.11-10 Editorial Change: Removed drawing from UFSAR.

4

Chauter 10 FSAR 10.1-22 through Editorial Change: Removed drawings from UFSAR.

FSAR 10.1-50 FSAR 10.1-24 Editorial Change: Updated Figure to reflect approved drawing of record.

through (EC 299664)

FSAR 10.1-25 FSAR 10.1-27 Editorial Change: Updated Figure to reflect approved drawing of record.

(EC 299664)

FSAR 10.1-46 Editorial Change: Updated Figure to reflect approved drawing ofrecord.

(EC 299664)

FSAR 10.2-12 through Editorial Change: Removed drawings from UFSAR.

FSAR 10.2-13 Cbaote1* ll FSAR 11.1-17 through Editorial Change: Removed drawings from UFSAR.

FSAR 11.1-20 FSAR 11.2-1 Editorial Change: Removed drawing from UFSAR.

(AR 2484835)

FSAR 11.2-24 through Editorial Change: Removed drawings from UFSAR.

FSAR 11.2-25 FSAR 11.2-27 through Editorial Change: Removed drawings from UFSAR.

FSAR 11.2-30 FSAR 11.4-1 Editorial Change: Removed drawings from UFSAR.

through (AR 2484835)

FSAR 11.4-8 A1mendixA FSARA.3-7 Licensing Change: Provided update to clarify system changes and requirements. (EC 297051)

FSARA.3-11 Licensing Change: Added Engineering Change (EC) 297051 as a new reference. (EC 297051)

Newly Identified SSC: None 5

Technical Specification (TS) and Bases (TSB) Change Review Results:

Change Change Type Change Package Affected Package Sections Number Fleet LAR to Technical Specifications Point Beach TS 5.3.1 TS 5.3.1 Fleet LAR to Relocate Relocate Changes.pdf {930KB)

Staff Qualifications from Staff TS to QATR.pdf (54KB)

Qualifications Fleet LAR to Relocate from TS to Staff Qualifications from QATR TS to QATR(l).pdf (54KB)

TS TOC.pdf (57KB)

Renewed Facility Operating License(l).pdf (137KB)

L-2024-113 Technical Specifications L-2024-113 - PBN LAR 294 5.5 and 5.6 TS_L-2024-113.pdf Revise TS to Adopt TSTF-577 (83KB) 24-24.pdf (9MB)

TS_L-2024-113(1). pdf (102KB)

TS_L-2024-113(2).pdf (101KB)

Amends 275, Technical Specifications LAR 300 TS markups -

Unit 1 and LAR-300.pdf (40KB) 277 for PBN 06242024.pdf (32KB)

Unit 2 LAR-300(1).pdf (54KB)

LAR 300 TS LICENSE 1_178 License LAR-300(4).pdf (81KB)

Markup.docx (83KB)

LAR-300(6).pdf {82KB)

TS LICENSE 2_174 Markup.docx (47KB)

LIC 02419598 Operating License, TRM 3.3.1, Technical Requirements TRM 4.3, Manual, Technical TRM Index, Specifications TS 5.5, TS License 1, and TS License 2 LAR 301 Operating License, Point Beach LAR 301 OL_LAR-301.pdf (90KB)

Technical Specifications Operating License and TS TS_LAR-301.pdf (85KB)

Pages.pdf (2MB)

OL_LAR-301(1).pdf PB LA 279 and 281 (97KB)

ML25125A116.pdf (667KB)

TS_LAR-301(1).pdf TS TOC Revision 25 to (1371(8)

Implement Amendment Nos.

279 and 281.pdf (2MB) 6

Change Package Change Change Package Affected Number Type Sections LIC 2511386 TSB LIC 2511386 Technical Specification TOC and Section LIC 2511386.pdf (99KB)

Bases Change.pdf (2MB)

B 3.9.2 PCR 02454088 TSB B 3.8.1 PCR 2503380 for TSB LAR 300 TS Bases markups -

TS B TOC LAR-300(2).pdf (60KB)

PBN LAR-300 01142025.pdf (144KB)

LAR-300(3).pdf (64KB)

TS B TOC_031 Markup.docx (26KB)

LAR-300(5).pdf (116KB)

LIC 02500675 TSB Point Beach LIC 02500675 TS B 3.8.1 TS B 3.8.1 LIC 02500675.pdf (53KB)

Marked-up Pages.pdf (77KB)

LIC 02500675(1).pdf (103KB)

LIC 2467541 TSB LIC 2467541 Change Package.pdf TS B 3.5.3 & TS B LIC 2467541.pdf (100KB)

(125KB)

TOC TS B 3.4.7 TSB TS B 3.4.7 Newly Identified SSC: None Technical Requirements Manual {TRM) Change Review Results:

Change Change Change Package Affected Package Type Sections Number DCP 300329 TRM EC 300329 Design Equivalent 2.1 DCP 300329.pdf (2MB)

Package for TRM COLR Cycle 43.pdf (869KB)

LIC 2509027 TRM TRM 3.2.2 Change Package.pdf TRM 3.2.2, TRM LIC 2509027.pdf (150KB)

(1MB)

Index TRM 2.1 U2 TRM EC0000299939 TRM Point Beach TRM 2.1 UNIT 2 Reload 2.1 EC_299939.pdf (2MB)

Cycle 41.docx (380KB)

EC_299939(1).pdf (2MB)

EC_299939(2).pdf (2MB)

EC_299939(3).pdf (2MB)

LIC 2492821 TRM TRM 3.3.1 & TRM Index Markup.pdf TRM 3.3.1 and TRM_ 2492821(1).pdf (3MB)

TRM Index (108KB)

TRM_ 2492821(2).pdf (108KB)

TRM_ 2492821(3).pdf (109KB) 7

TRM Index TRM Index TRM 4.12 TRM TRM 4_12 markup2_2.pdf (1MB)

TRM 4.12 TRM 4.12(1).pdf (97KB)

TRM 3.7.6 TRM TRM 3.5.1 TRM TRM 3.5.1 TRM 4.12 TRM TRM 4.12 L-2024-043 TRM Point Beach Revised Reactor Vessel Index and 2.2 TRM_L-2024-043.pdf Materials Surveillance Capsule (281KB)

Withdrawal Schedules (ML24087A033).pdf (1MB)

LIC 02419598 TRM TRM 3.3.1, TRM 4.3, TRM Index, TS 5.5, TS License 1, and TS License 2

Newly Identified SSC: None Fire Protection Program Design Document (FPPDD) Change Review Results:

There have been no revisions to the FPPDD in the time frame being reviewed.

Newly Identified SSC: None Plant Modification Review NAMS Engineering Changes (EC) Type Design Change Package (DCP) completed (CLOSED status) between 03/01/2024 and 09/01/2025, associated with FSAR, TS, TSB, TRM, FPPDD, AMP or DBD changes I revisions, were reviewed. While most plant modifications include the addition or modification of equipment that does NOT need to be reported under 54.37(b), there is a chance that the plant modification could result in needing to add existing SSCs into scope for License Renewal ("newly identified"). It should be noted that the plant modification process includes consultation for License Renewal consideration during the design phase, because there are potential changes that could affect LR scoping.

See Attachment A for list of ECs.

Newly Identified SSC: None 8

Q-List Upgrades Q-list changes are controlled via EN-AA-203-1102, Safety Classification Determination. Q-list upgrades could have the potential to generate "newly identified" components should the new Q-list category meet original scoping criteria.

EC Number Affected Equip System Base Value New Value 0000299471 PB 2YCl<TBRl<Y-03-08 y

QUALITY BASIS 1 SR21 QUALITY BASIS 1 SR23 0000283586 PB 0480VSWGEARB52-53B 480V QUALITY BASIS 4 QR22

      • DELETED ***

PB OGT125VCl<TBRl<D72-0000300368 5002G GT125V QUALITY BASIS 3

      • DELETED ***

0000300936 PB lRCVALVOPRC-00527-0 RC QUALITY BASIS 1 QR45 QUALITY BASIS 1 QR29 0000300936 PB 2RCVALVOPRC-00527-0 RC QUALITY BASIS 1 QR45 QUALITY BASIS 1 QR29 0000300936 PB lRCVALVERC-00527-S RC QUALITY BASIS 1 QR45 QUALITY BASIS 1 QR29 0000300936 PB 2RCVALVERC-00527-S RC QUALITY BASIS 1 QR45 QUALITY BASIS 1 QR29 Newly Identified SSC: None NRC Interim Staff Guidance (ISG) or Other Generic Communications License Renewal ISGs and other applicable NRC Guidance Communications (RIS, IN, etc.) were reviewed and found to have no effect on LR scoping. The GALL (NU REG 1801) was not revised in this timeframe.

Newly Identified SSC: None Aging Management Program (AMP) Changes and Operating Experience The LR Site Coordinator reviews all of the Aging Management Program (AMP) changes and is included in the OE process at the plant. AMP Changes do not typically result in any scoping changes. OE typically discusses new or recent examples of degradation or failures, which also typically does not affect scoping. All NextEra Point Beach AMPs have recently undergone review processes under the Subsequent License Renewal Application project, now being reviewed by the NRC. At present, while operating in the period of extended operation for first License Renewal, all AMP Effectiveness Reviews performed per the guidance in NEI 14-12 are current with no scoping issues affecting 54.37(b) were identified.

LR-AMP-003-SGINT [STEAM GENERATOR INTEGRITY PROGRAM BASIS DOCUMENT FOR LICENSE RENEWAL] Revision 13 PCR 02511119 Reflects changes to this site program document due to adoption of "Revised Frequencies for SG Tube Inspections" (TSTF-577) into the PBN Tech Specs for the SG Program (PCR-2507717), by license amendment 277/279 (ML25016A209).

Newly Identified SSC: None DBD Review Design Basis Document (DBD) revisions from 03/01/2024 and 09/01/2025 were reviewed for changes to intended functions of equipment which would result in the creation of newly identified SSC.

9

Type Doc Nbr Rev Doc Title DBD DBD-06 012 INSTRUMENT AND SERVICE AIR SYSTEM DESIGN BASIS DOCUMENT DBD DBD-07 010 MAIN STEAM AND STEAM DUMP DESIGN BASIS DOCUMENT DBD DBD-11 025 SAFETY INJECTION AND CONTAINMENT SPRAY SYSTEM DESIGN BASIS DOCUMENT DBD DBD-11 026 SAFETY INJECTION AND CONTAINMENT SPRAY SYSTEM DESIGN BASIS DOCUMENT DBD-25 NSSS CONTROL SYSTEMS SECTION E - CONDENSER STEAM DUMP CONTROL DBD SECTION E 005 DESIGN BASIS DOCUMENT DBD DBD-29 009 AUXILIARY BUILDING AND CONTROL BUILDING HVAC DESIGN BASIS DOCUMENT DBD DBD-29 010 AUXILIARY BUILDING AND CONTROL BUILDING HVAC DESIGN BASIS DOCUMENT DBD DBD-33 014 CONTAINMENT STRUCTURES AND PENETRATIONS DESIGN BASIS DOCUMENT DBD DBD-P-52 002 REACTOR COOLANT PRESSURE BOUNDARY DESIGN BASIS POSITION PAPER DBD DBD-P-53 004 APPLICATION OF INSTRUMENT UNCERTAINTY DESIGN BASIS POSITION PAPER Newly Identified SSC: None Omitted From Original LR Scope SSCs in this category could have been identified by any other method (i.e., by Program Owners, System Engineering walkdowns, CAP, etc.) throughout the time period 03/01/2024 through 09/01/2025. These types of changes are not due to CLB / modification changes but were SSCs that were inadvertently omitted and should have been included in the original LR scope.

Newly Identified SSC: None Aging Effects Management Any newly identified SSC are evaluated in accordance with EN-AA-106-1001, "License Renewal 10 CFR 54.37(b) Additional Records and Recordkeeping Requirements" and NP 7.7.25, "PBNP Renewed License Program." All the long-lived passive components match existing material, environments, aging program (MEAP) requirements, and therefore, no aging management evaluations were needed.

Summary No 'newly identified' components were identified during the review.

10

Attachment A-CLOSED ECs EC Number Type SubType EC Title 0000299151 DCP DEC RMS CONFIDENCE RUN SOFTWARE UPDATES MAIN FEEDWATER REGULATING VALVE POSITION ER AUTOMATIC SWITCHING 0000300248 DCP MSP MOD-POINT BEACH UNIT 1 lFT-466, lFT-467, lFT-476 AND lFT-477 SWAGELOKTUBING TOSS FLEX HOSE ON BOTH HIGH AND LOW SIDE INPUTS (WO 40826062 TASKS CLOSED TO RESOLVED UNDER WO 0000297718 DCP DEC 40881840) 0000299518 DCP DEC MFIV AIR AMPLIFIER REGULATOR AND VALVE ADDITIONS 0000299316 DCP TMD BYPASS 1HX-018A(B)-1 WBS # N3.500309.00.C002 0000300215 DCP DEC CONTAINMENT PENETRATION MODIFICATION - UNIT 1 0000299341 DCP DEC REPLACE 2P-1B RCP SEAL HOUSING 0000299235 DCP MSP INSTALL IN-MAST SIPPING EQUIPMENT IN UNIT 2 0000294818 DCP MNR HI-STORM FW CASK SYSTEM LICENSING AND OPERATIONS 0000300604 DCP TME MONITOR lHC-135 OUTPUTS TO TROUBLESHOOT lCV-135 ERRATIC OPERATION 0000293630 DCP DEC 6" STAR SPRINKLER CORP MODEL 6-175-D ALARM CHECK VALVE REPLACEMENT 0000300329 DCP DEC POINT BEACH UNIT 1 CYCLE 43 RELOAD EC 0000299597 DCP DEC lCV-1299 PACKING LEAKOFF 0000300576 DCP DEC 1(2)P-37C/D TURBINE LUBE OIL PUMP ALTERNATE BEARING MATERIAL 0000300640 DCP DEC EOG TURBOCHARGER OIL FILTER ASSEMBLY FASTENERS RMS REPLACEMENT UNIT 2 MAIN STEAM 2RE-231 & 2RE-232 IMPLEMENTATION 0000297046 DCP MJR LTAM # PB-12-0104 IPP=91 WBS N-4513-79 G-05 GT GENERATOR IA FILTER F-148 GAUGE TEMPORARILY REMOVED AR02486323 0000299690 DCP TMD F-148 D/P GAGE SENSING BOLTS BROKE REPLACE 1/2P-027A/B/C HEATER DRAIN PUMP WITH NEW PUMP REVISED FOR 1P-0000293236 DCP DEC 27A REPLACEMENT LTAM # PB-13-0002 IPP=46 WBS N-4747-79 REPLACE 1/2P-027A/B/C HEATER DRAIN PUMP WITH NEW PUMP REVISED FOR 1P-0000293236 DCP DEC 27A REPLACEMENT LTAM # PB-13-0002 IPP=46 WBS N-4747-79 TRASH RACK REPLACEMENT 0000299565 DCP DEC N3.500279.00.C001 0000300357 DCP TMR 1R42: TEMP POWER FOR XL-02/LD-02 0000300356 DCP TMR 1R42: TEMP POWER FOR SELECT 1B-12 AND 1B-41 LOADS 0000300355 DCP TMR 1R42: TEMP POWER FOR SELECT 1B-02 LOADS 0000299358 DCP DEC PBN SECURITY ITEMISER REPLACEMENT 0000299273 DCP DEC PB EXPLOSIVE VAPOR DETECTORS (EVD) REPLACEMENT 0000300326 DCP DEC HYDROGEN SIDE SEAL OIL COOLER PARTITION DEGRADATION (1HX-053B)

RMS REPLACEMENT UNIT 1 MAIN STEAM lRE-231 & lRE-232 IMPLEMENTATION 0000297045 DCP MJR LTAM # PB-12-0104 IPP=91 WBS N-4513-79 0000299115 DCP TMD 1R-1 CLOSURE STUD INSERT ARRANGEMENT CHANGE 11

0000299290 DCP TMD T-40 SILT DISPERSANT ALTERNATE TEMPORARY SUPPLY TOTES MODIFICATIO 0000300037 DCP DEC CONTAINMENT PENETRATION MODIFICATION USE OF JCREATE DIGITAL THERMOMETER FOR STATION BATIERY PILOT 0000299789 DCP DEC CELLTEMPERATURE INDICATION 0000299939 DCP DEC POINT BEACH UNIT 2 CYCLE 41 RELOAD EC 0000293520 DCP DEC 2SC-955 REPLACEMENT VALVE WITH STAINLESS STEEL YOKE ADD SEAL TABLE MAINTENANCE FITIING ASSEMBLIES 0000293782 DCP DEC PB-18-0010 RMS REPLACEMENT MIRION HEAD-END IMPLEMENTATION 0000297042 DCP MJR LTAM # PB-12-0104 IPP=91 WBS N-4513-79 0000300280 DCP DEC REPLACE 2B52-328H THERMAL OVERLOAD RELAY 0000298347 DCP DEC REPLACE OBSOLETE PRESSURE SWITCHES 1/2PS-2017/2018 WITH NEW MODEL 0000298347 DCP DEC REPLACE OBSOLETE PRESSURE SWITCHES 1/2PS-2017/2018 WITH NEW MODEL 0000298940 DCP DEC BAHT RECORDER STPT CHANGES AR2444551 0000297896 DCP DEC 1B52-313M; REPLACEMENT OF OBSOLETE HFB3125 BREAKER REPLACE FOXBORO 613HM WITH ROSEMOUNT 3152ND FOR RCP LABYRINTH 0000292579 DCP DEC SEAL DP REPLACE FOXBORO 613HM WITH ROSEMOUNT 3152ND FOR RCP LABYRINTH 0000292579 DCP DEC SEAL DP 0000300133 DCP DEC 2CV-203 RELIEF VALVE REPLACEMENT AND FASTENERS K-3B SERVICE AIR COMPRESSOR REPLACEMENT 0000296618 DCP MJR LTAM # PB-20-0006 WBS: N-4906-79; HEAT MAP: 12 0000299743 DCP TMR 2R40: INSTALL TEMP POWER FOR 2Z-13 AND LD-05 ADD A TIME DELAY FOR MSR HOTWELLAND MSR STILLING MANIFOLD HIGH LEVEL 0000297322 DCP MSP ALARMS ADD A TIME DELAY FOR MSR HOTWELLAND MSR STILLING MANIFOLD HIGH LEVEL 0000297322 DCP MSP ALARMS 0000299517 DCP DEC 1(2)RC-431A(B) PZR SPRAY VALVE BONNETS 0000299517 DCP DEC 1(2)RC-431A(B) PZR SPRAY VALVE BONNETS 0000297661 DCP DEC ANCHOR DARLING GRAPHITE PRESSURE SEAL CONVERSION G-01/G-02 AIR RECEIVER REPLACEMENT 0000298684 DCP DEC WBS: N3.500305.00.C001(2) LTAM PB-21-0003 0000299741 DCP TMR 2R40: INSTALL TEMP POWER FOR B-46 2B52-464BL REPLACEMENT OF Z-15 SINGLE FAILURE PROOF TROLLEY AND CONTROLS 0000297051 DCP DEC WBS# N3.500204.00.C001 LTAM# PB-21-0029 IPP: 40 0000297500 DCP DEC TURBINE BEARING TEMPERATURE GAUGE -WEISS TO ASHCROFT - Tl-6010 0000299319 DCP TME 2FD-9B TEMPORARY STEAM LEAK SEALANT REPAIR 0000299113 DCP DEC 1B52-316M; REPLACEMENT OF OBSOLETE HFB3125 BREAKER 0000299709 DCP TMD 2W-1A2-A BACKDRAFT DAMPER TEMPORARY DUCT BLANK 0000299161 DCP TMD 2RC-431B BELLOWS TELLTALE LINE TEMPORARY REPAIR PAB BATIERY AND INVERTER ROOM COOLER INSTALLATION 0000296454 DCP MJR LTAM PB-20-0030; WBS N-4912-79; HEAT MAP: 5 12

ELEVATE/ RELOCATE SECURITY CAMERAS DUE TO RISING LAKE LEVEL (COMMERCIAL 0000294918 DCP CCP CHANGE) 0000297879 DCP TMD TEMPORARY SERVICE AIR COMPRESSOR Z-31 AND Z-39 REPLACEMENT PRE {F-14A/AND F-50A/B) AND AFTER FILTER (F-0000293417 DCP DEC 15A/B AND F-49A/B) ASSEMBLIES 0000299785 DCP TMR P-64AND P-65 TURBINE HALL ALTERNATE SUBMERSIBLE PUMP 0000294874 DCP TME Ul TH SUMP PUMP DISCHARGE PIPING LEAK PATCH CHANGES TO FACILITATE REPLACEMENT OF K-005C-M & K-0050-M VIA IEE 486241 &

0000294691 DCP DEC IEE 492877 0000295859 DCP TME 2P-65A/B DISCHARGE PIPING TEMPORARY LEAK PATCH 0000297904 DCP CCP PANEL50L; MOVE SUPPLY TO 134E FROM BREAKER#21 TO #33 0000297026 DCP DEC CORRECT 852-580 CONTROL SWITCH WIRING 0000299701 DCP DEC REPLACE 1/2C-328 INCANDESCENT INDICATING LAMPS WITH RED LED LAMPS 0000299701 DCP DEC REPLACE 1/2C-328 INCANDESCENT INDICATING LAMPS WITH RED LED LAMPS 0000296325 DCP TME 2P-65A/B DISCHARGE PIPING TEMPORARY LEAK PATCH PANEL 16L AND PANEL 22L UPDATES, 66' PAB PCM RELOCATION DOCUMENTATION 0000297772 DCP CCP UPDATES 0000296016 DCP CCP REPLACE OBSOLETE WESTINGHOUSE 14J11 STEAM/HOT WATER UNIT HEATERS 0000297809 DCP DEC SW-2912-BS-M AND S-2911-BS-M REPLACEMENT MOTOR 0000299395 DCP TMR 1K-29A AIR AMPLIFIER AND MFIV AIR SYSTEM TROUBLESHOOTING 0000299165 DCP CCP DISABLE SOUTH GATEHOUSE SECOND FLOOR SHUTTERS 0000275022 DCP MSP HX-38A, HX-388, HX-28A AND HX-288 CHILLER CONDENSER REPLACEMENT INSTALL TIME DELAY RELAY TO ELIMINATE SPURIOUS ALARMS ASSOCIATED WITH 0000292826 DCP MSP TURBULENT AIR FLOW PAST OFS-3207 AND OFS-3297 0000298835 DCP CCP NSB CAFE CONFERENCE EQUIPMENT UPGRADE 0000297167 DCP CCP REPLACE NSB DAY BRITE 4 FT FLUORESCENT LAMPS WITH LED LAMPS 0000292771 DCP DEC

  1. 4 & #5 FWH RELIEF VALVE OUTLET DRAIN REROUTE REPLACE 1X-02 TRANSFORMER LTAM#

0000290513 DCP MJR PB-10-0009 IPP= 80 WBS# N-4402-79; HEAT MAP: 10 0000297680 DCP DEC RADWASTE STEAM ISi CLASS BOUNDARY CHANGE 0000297680 DCP DEC RADWASTE STEAM ISi CLASS BOUNDARY CHANGE 0000297680 DCP DEC RADWASTE STEAM ISi CLASS BOUNDARY CHANGE UPGRADE 30MM PILOT LIGHTS TO LED PANELS lN-07 & 2N-07 NEED 0000294244 DCP DEC LIGHT SOCKET IMPROVEMENT 0000295249 DCP DEC PILOT CELL BATTERY TEMPERATURE INDICATION REPLACEMENT 0000297063 DCP CCP REPLACE CWPH SERVICE WATER BAY LIGHTS WITH LED FIXTURES 0000297050 DCP DEC WT-593 GIP BYPASS CHEMICAL INJECTION PIPING UPGRADE 13