Semantic search

Jump to navigation Jump to search
 Issue dateTitle
RA-18-032, Revision to Commitments Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues27 March 2018Revision to Commitments Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues
RS-17-172, Commitments for Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues19 December 2017Commitments for Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues
IR 05000219/201700317 October 2017Integrated Inspection Report 05000219/2017003
RA-17-059, Commitments for Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues29 August 2017Commitments for Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues
ML17194A82511 July 2017Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections
IR 05000219/201600710 August 2016IR 05000219/2016007;6-13-16-7/15/16; Oyster Creek Nuclear Generating Station-Component Design Bases Inspection-CDBI)
ML13064A01225 February 2013Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve
IR 05000219/19980072 July 1998Insp Rept 50-219/98-07 on 980615-19.No Violations Noted. Major Areas Inspected:Status of Plant motor-operated Valve Program to Determine Acceptability for Closure of NRC Review Under GL 89-10
ML20198F0455 August 1997Provides Updated Status of Ongoing Plant Activities Re NRC GL 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance
IR 05000219/199700517 July 1997Insp Rept 50-219/97-05 on 970407-11.No Violations Noted. Major Areas Inspected:Engineering
ML20138Q61126 February 1997Forwards 120-day Response to GL 96-06,including Potential Mods & Procedure Changes
ML20134E78128 January 1997Forwards Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During DBA Conditions
ML20117K6955 September 1996Responds to RAI Re GL 95-07, Pressure Locking & Thermal Binding SR Power-Operated Gate Valves
Information Notice 1996-08, Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate Valve5 February 1996Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate Valve
ML20094L32014 November 1995Provides Results of Plant Evaluations Performed in Response to NRC 950817 GL 95-07, Pressure Locking & Thermal Binding of SR Power Operated Gate Valves
ML20081G26016 March 1995ISI Data Repts for Refueling Outage 15R
ML20078J9857 November 1994Forwards Addl Info Re GL 89-10 Design Basis Capability of Oyster Creek Nuclear Generating Station Isolation Condenser Sys & RWCU Containment Isolation Valves
Information Notice 1994-55, Problems with Copes-Vulcan Pressurizer Power-Operated Relief Valves4 August 1994Problems with Copes-Vulcan Pressurizer Power-Operated Relief Valves
ML20058F8732 December 1993Concludes That Dynamic Flow Testing of Core Spray Injection & Test Isolation MOVs Will Not Provide Addl Data of Safety Significance to Justify Potential Adverse Consequences & Outage Schedule Impact,Per Generic Ltr 89-10
Information Notice 1993-77, Human Errors That Result in Inadvertent Transfers of Special Nuclear Material at Fuel Cycle Facilities4 October 1993Human Errors That Result in Inadvertent Transfers of Special Nuclear Material at Fuel Cycle Facilities
Information Notice 1993-16, Failures of Not-Locking Devices in Check Valves19 February 1993Failures of Not-Locking Devices in Check Valves
Information Notice 1992-67, Deficiency in Design Modifications to Address Failures of Hiller Actuators Upon a Gradual Loss of Air Pressure10 September 1992Deficiency in Design Modifications to Address Failures of Hiller Actuators Upon a Gradual Loss of Air Pressure
Information Notice 1992-41, Consideration of Stem Rejection Load in Calculation of Required Valve Thrust29 May 1992Consideration of Stem Rejection Load in Calculation of Required Valve Thrust
Information Notice 1992-41, Consideration of Stem Rejection Load In Calculation of Required Valve Thrust29 May 1992Consideration of Stem Rejection Load In Calculation of Required Valve Thrust
NRC Generic Letter 1991-1717 October 1991NRC Generic Letter 1991-017: Generic Safety Issue 29, Bolting Degradation or Failure in Nuclear Power Plants.
Information Notice 1989-56, Questionable Certification of Material Supplied to the Defense Dept. by Nuclear Suppliers22 November 1989Questionable Certification of Material Supplied to the Defense Dept. by Nuclear Suppliers
Information Notice 1989-56, Questionable Certification of Material Supplied to the Defense Dept. By Nuclear Suppliers22 November 1989Questionable Certification of Material Supplied to the Defense Dept. By Nuclear Suppliers
Information Notice 1988-90, Unauthorized Removal of Industrial Nuclear Gauges22 November 1988Unauthorized Removal of Industrial Nuclear Gauges
Information Notice 1988-92, Potential for Spent Fuel Pool Draindwon22 November 1988Potential for Spent Fuel Pool Draindwon
Information Notice 1988-89, Degradation of Kapton Electrical Insulation21 November 1988Degradation of Kapton Electrical Insulation
Information Notice 1988-87, Pump Wear and Foreign Objects in Plant Piping Systems16 November 1988Pump Wear and Foreign Objects in Plant Piping Systems
Information Notice 1988-88, Degradation of Westinghouse Ard Relays16 November 1988Degradation of Westinghouse Ard Relays
Information Notice 1988-86, Operating with Multiple Grounds in Direct Current Distribution Systems21 October 1988Operating with Multiple Grounds in Direct Current Distribution Systems
Information Notice 1988-85, Broken Retaining Block Studs on Anchor Darling Check Valves14 October 1988Broken Retaining Block Studs on Anchor Darling Check Valves
Information Notice 1987-08, Degraded Motor Leads in Limitorque DC Motor Operators4 February 1987Degraded Motor Leads in Limitorque DC Motor Operators
ML19340E5709 December 1980Responds to IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. Suppliers Being Contacted to Confirm That Subj Parts Are Not in Use at Facility. Completion of Confirmation Efforts Expected by 810316