2CAN082103, Unit 2 - Fifth 10-Year Interval Snubber Program Plan31 August 2021Unit 2 - Fifth 10-Year Interval Snubber Program Plan
ML20204A8074 June 2020AN1-2020-04 Final Written Exam
IR 05000313/201900429 January 2020Integrated Inspection Report 05000313/2019004 and 05000368/2019004
1CAN091802, Snubber Testing Program for Fifth Inservice Test Interval24 September 2018Snubber Testing Program for Fifth Inservice Test Interval
ML18004A06620 December 2017Entergy - Anchor Darling Double Disc Gate Valve Information and Status
IR 05000313/20170023 August 2017NRC Integrated Inspection Report 05000313/2017002 and 05000368/2017002
ML13064A01225 February 2013Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve
1CAN061201, License Amendment Request Technical Specification Change Associated with Main Feedwater Valves19 June 2012License Amendment Request Technical Specification Change Associated with Main Feedwater Valves
ML20198G5549 June 199710CFR50.59 Rept for 1997 for Ano,Unit 2, for Period 951120-970609
ML20141K12025 October 199610CFR50.59 Rept for 1996 for ANO Unit 1 & 2, for Period 950401-961025
IR 05000313/19960234 October 1996Insp Repts 50-313/96-23 & 50-368/96-23 on 960916-20 & 960930-1004.No Violations Noted.Major Areas Inspected: Evaluation of Licensees motor-operated Valve Program for Closure Under GL-89-10
Information Notice 1996-08, Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate Valve5 February 1996Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate Valve
0CAN079504, Forwards Summary of Items That Require Rev or Will No Longer Be Implemented Due to Alternate Controls.Submittal Contains No New Commitments28 July 1995Forwards Summary of Items That Require Rev or Will No Longer Be Implemented Due to Alternate Controls.Submittal Contains No New Commitments
ML20149J55129 December 1994Discusses 941027 Meeting at ANO Site Re Status of Actions to Complete Commitments to NRC GL 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance. Attendance List & Licensee Presentation,Encl
Information Notice 1994-55, Problems with Copes-Vulcan Pressurizer Power-Operated Relief Valves4 August 1994Problems with Copes-Vulcan Pressurizer Power-Operated Relief Valves
Information Notice 1993-77, Human Errors That Result in Inadvertent Transfers of Special Nuclear Material at Fuel Cycle Facilities4 October 1993Human Errors That Result in Inadvertent Transfers of Special Nuclear Material at Fuel Cycle Facilities
Information Notice 1993-16, Failures of Not-Locking Devices in Check Valves19 February 1993Failures of Not-Locking Devices in Check Valves
ML20125C7167 December 1992Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl
Information Notice 1992-67, Deficiency in Design Modifications to Address Failures of Hiller Actuators Upon a Gradual Loss of Air Pressure10 September 1992Deficiency in Design Modifications to Address Failures of Hiller Actuators Upon a Gradual Loss of Air Pressure
Information Notice 1992-41, Consideration of Stem Rejection Load In Calculation of Required Valve Thrust29 May 1992Consideration of Stem Rejection Load In Calculation of Required Valve Thrust
Information Notice 1992-41, Consideration of Stem Rejection Load in Calculation of Required Valve Thrust29 May 1992Consideration of Stem Rejection Load in Calculation of Required Valve Thrust
0CAN079211, 1991 Annual 10CFR50.59 Rept,Arkansas Nuclear One31 December 19911991 Annual 10CFR50.59 Rept,Arkansas Nuclear One
NRC Generic Letter 1991-1717 October 1991NRC Generic Letter 1991-017: Generic Safety Issue 29, Bolting Degradation or Failure in Nuclear Power Plants.
1CAN029105, Responds to NRC Bulletin 89-002 Re Stress Corrosion Cracking of high-hardness,stainless Steel Preloaded Bolting in Anchor/Darling Swing Check Valves.No Indications of Cracking or Broken Bolts Noted During Insp of Valves27 February 1991Responds to NRC Bulletin 89-002 Re Stress Corrosion Cracking of high-hardness,stainless Steel Preloaded Bolting in Anchor/Darling Swing Check Valves.No Indications of Cracking or Broken Bolts Noted During Insp of Valves
ML20012B5145 March 1990Responds to Generic Ltr 89-02, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor/Darling Model S350W.... No safety-related Anchor/Darling Valves in Use at Plant,Per Bulletin 89-002
Information Notice 1989-56, Questionable Certification of Material Supplied to the Defense Dept. by Nuclear Suppliers22 November 1989Questionable Certification of Material Supplied to the Defense Dept. by Nuclear Suppliers
Information Notice 1989-56, Questionable Certification of Material Supplied to the Defense Dept. By Nuclear Suppliers22 November 1989Questionable Certification of Material Supplied to the Defense Dept. By Nuclear Suppliers
ML20245D75815 June 1989Insp Repts 50-313/89-18 & 50-368/89-18 on 890416-0531. Violation Noted.Major Areas Inspected:Plant Status,Followup on Previously Identified Items,Followup of Events, Operational Safety Verification & Testing of Mods
Information Notice 1988-90, Unauthorized Removal of Industrial Nuclear Gauges22 November 1988Unauthorized Removal of Industrial Nuclear Gauges
Information Notice 1988-92, Potential for Spent Fuel Pool Draindwon22 November 1988Potential for Spent Fuel Pool Draindwon
Information Notice 1988-89, Degradation of Kapton Electrical Insulation21 November 1988Degradation of Kapton Electrical Insulation
Information Notice 1988-87, Pump Wear and Foreign Objects in Plant Piping Systems16 November 1988Pump Wear and Foreign Objects in Plant Piping Systems
Information Notice 1988-88, Degradation of Westinghouse Ard Relays16 November 1988Degradation of Westinghouse Ard Relays
Information Notice 1988-86, Operating with Multiple Grounds in Direct Current Distribution Systems21 October 1988Operating with Multiple Grounds in Direct Current Distribution Systems
Information Notice 1988-85, Broken Retaining Block Studs on Anchor Darling Check Valves14 October 1988Broken Retaining Block Studs on Anchor Darling Check Valves
0CAN028806, Forwards Written Rept Describing Approach to Each Action Items from IE Bulletin 85-003 & Summary of Data for Each motor-operated Valve Compiled in Response to Bulletin.Rept Completes Response to IE Bulletin 85-00329 February 1988Forwards Written Rept Describing Approach to Each Action Items from IE Bulletin 85-003 & Summary of Data for Each motor-operated Valve Compiled in Response to Bulletin.Rept Completes Response to IE Bulletin 85-003
Information Notice 1987-08, Degraded Motor Leads in Limitorque DC Motor Operators4 February 1987Degraded Motor Leads in Limitorque DC Motor Operators
ML19340C2316 November 1980Documents Commitments & Responses Made as Result of 801022 Meeting Between Util & NRC Re Svc Water,Steam Generator Level & Bolting Concerns