Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML19326A315 | 3 December 2019 | Summary of November 18, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Supplemental Valve Position Indication Testing Requirements |
RS-17-172, Commitments for Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues | 19 December 2017 | Commitments for Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues |
ML17194A825 | 11 July 2017 | Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections |
ML13064A012 | 25 February 2013 | Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve |
ML030290090 | 24 January 2003 | Inservice Inspection (ISI) Summary Report Fall 2002 Inservice Inspection Period |
ML20203J750 | 9 December 1997 | Plant Issues Matrix |
IA-97-451, Plant Issues Matrix | 9 December 1997 | Plant Issues Matrix |
ML20141C392 | 7 May 1997 | FOIA Request for Documents Re Current List of Plant Issues Matrix Related to Listed Facilities,Per 5 Usc 552(a)(3) & 10CFR9.23(b) |
IR 05000010/1996013 | 31 December 1996 | Insp Repts 50-010/96-13,50-237/96-13 & 50-249/96-13 on 960901-1018.Violations Noted.Major Areas Inspected:Licensee Operational,Maint,Engineering & Plant Support Activities |
Information Notice 1996-08, Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate Valve | 5 February 1996 | Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate Valve |
Information Notice 1994-55, Problems with Copes-Vulcan Pressurizer Power-Operated Relief Valves | 4 August 1994 | Problems with Copes-Vulcan Pressurizer Power-Operated Relief Valves |
Information Notice 1993-77, Human Errors That Result in Inadvertent Transfers of Special Nuclear Material at Fuel Cycle Facilities | 4 October 1993 | Human Errors That Result in Inadvertent Transfers of Special Nuclear Material at Fuel Cycle Facilities |
Information Notice 1993-16, Failures of Not-Locking Devices in Check Valves | 19 February 1993 | Failures of Not-Locking Devices in Check Valves |
Information Notice 1992-67, Deficiency in Design Modifications to Address Failures of Hiller Actuators Upon a Gradual Loss of Air Pressure | 10 September 1992 | Deficiency in Design Modifications to Address Failures of Hiller Actuators Upon a Gradual Loss of Air Pressure |
Information Notice 1992-41, Consideration of Stem Rejection Load In Calculation of Required Valve Thrust | 29 May 1992 | Consideration of Stem Rejection Load In Calculation of Required Valve Thrust |
Information Notice 1992-41, Consideration of Stem Rejection Load in Calculation of Required Valve Thrust | 29 May 1992 | Consideration of Stem Rejection Load in Calculation of Required Valve Thrust |
NRC Generic Letter 1991-17 | 17 October 1991 | NRC Generic Letter 1991-017: Generic Safety Issue 29, Bolting Degradation or Failure in Nuclear Power Plants. |
Information Notice 1989-56, Questionable Certification of Material Supplied to the Defense Dept. By Nuclear Suppliers | 22 November 1989 | Questionable Certification of Material Supplied to the Defense Dept. By Nuclear Suppliers |
Information Notice 1989-56, Questionable Certification of Material Supplied to the Defense Dept. by Nuclear Suppliers | 22 November 1989 | Questionable Certification of Material Supplied to the Defense Dept. by Nuclear Suppliers |
Information Notice 1988-92, Potential for Spent Fuel Pool Draindwon | 22 November 1988 | Potential for Spent Fuel Pool Draindwon |
Information Notice 1988-90, Unauthorized Removal of Industrial Nuclear Gauges | 22 November 1988 | Unauthorized Removal of Industrial Nuclear Gauges |
Information Notice 1988-89, Degradation of Kapton Electrical Insulation | 21 November 1988 | Degradation of Kapton Electrical Insulation |
Information Notice 1988-88, Degradation of Westinghouse Ard Relays | 16 November 1988 | Degradation of Westinghouse Ard Relays |
Information Notice 1988-87, Pump Wear and Foreign Objects in Plant Piping Systems | 16 November 1988 | Pump Wear and Foreign Objects in Plant Piping Systems |
Information Notice 1988-86, Operating with Multiple Grounds in Direct Current Distribution Systems | 21 October 1988 | Operating with Multiple Grounds in Direct Current Distribution Systems |
Information Notice 1988-85, Broken Retaining Block Studs on Anchor Darling Check Valves | 14 October 1988 | Broken Retaining Block Studs on Anchor Darling Check Valves |
ML20207T294 | 6 March 1987 | Submits Addl Info Re Recent NRC Administered Requalification Exams & 870227 Reactor Water Over Temp Event While in Cold Shutdown,Per 870305 Telcon |
Information Notice 1987-08, Degraded Motor Leads in Limitorque DC Motor Operators | 4 February 1987 | Degraded Motor Leads in Limitorque DC Motor Operators |