05000528/FIN-2011003-06
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure of 13.8kV Splice due to Inadequate Maintenance. |
Description | Inspectors reviewed a Green self-revealing finding for failure to properly repair a 13.8kV cable associated with the AENANX02 startup transformer. Specifically, the work performed failed to achieve an acceptable level of quality as required by Procedure 30DP-9MP01 Conduct of Maintenance, and as a result the splice failed causing valid actuations of the emergency diesel generators due to a partial loss of offsite power to both Unit 1 and Unit 3. The licensee plans to revise Specification 13-EN-306, Installation Specification for Cable Splicing and Terminations for PVNGS, to remove the use of taped splices for 13.8kV cable. The licensee entered this issue into the corrective action program as Condition Report / Disposition Requests 3616634. The failure of the licensee to perform work with an acceptable level of quality for 13.8kV cable splicing was a performance deficiency. The performance deficiency is more than minor, and therefore a finding, because it adversely affected the equipment reliability attribute of the Initiating Events Cornerstone objective to limit the likelihood of those events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. Using Inspection Manual Chapter 0609, Attachment 4, Initial Screening and Characterization of Findings, the inspectors concluded that the finding is of very low safety significance (Green) because it did not contribute to both the likelihood of a reactor trip and the likelihood that mitigation equipment or functions would not be available. This finding had a cross-cutting aspect in the area of human performance associated with the resources component because the licensee failed to provide complete, accurate and up-to-date procedures and work packages for splicing of 13.8kV electrical cable. |
Site: | Palo Verde |
---|---|
Report | IR 05000528/2011003 Section 4OA2 |
Date counted | Jun 30, 2011 (2011Q2) |
Type: | Finding: Green |
cornerstone | Initiating Events |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | G Guerra R Lantz M Brown P Elkmann G George J Adams J Bashore M Baquera S Hedger |
CCA | H.7, Documentation |
INPO aspect | WP.3 |
' | |
Finding - Palo Verde - IR 05000528/2011003 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Palo Verde) @ 2011Q2
Self-Identified List (Palo Verde)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||