Finding | |
---|---|
Title | Failure to Promptly Correct Conditions Adverse to Quality |
Description | During an NRC inspection conducted June 6-30, 2016, a violation of NRC requirements was identified. In accordance with the NRC Enforcement Policy, the violation is listed below: 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, requires, in part, that conditions adverse to quality are promptly identified and corrected. Contrary to the above, from November 2010 through June 2016, the licensee failed to promptly correct a condition adverse to quality. Specifically, the licensee failed to adequately resolve water hammer and corrosion issues which were previously identified by the NRC as non-cited violation 05000483/2010006-01. The failure to resolve these issues resulted in subsequent safety-related equipment failures. This violation is associated with a Green Significance Determination Process finding
The inspectors identified a cited violation of 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, associated with the licensees failure to take timely corrective action for a previously identified condition adverse to quality. Specifically, the licensee failed to adequately resolve water hammer and corrosion issues that were previously identified by the NRC as non-cited violation 05000483/2010006-01 and the failure to resolve these issues resulted in subsequent safety-related equipment failures. The licensee performed an operability determination that established a reasonable expectation of operability pending implementation of corrective actions. The licensee entered this issue into their corrective action program as Callaway Action Request 201604440. The licensees failure to take timely and adequate corrective actions to correct a condition adverse to quality was a performance deficiency. The performance deficiency is more than minor, and therefore a finding, because it is associated with the equipment performance attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective to ensure availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the failure to correct water hammer and corrosion issue resulted in the licensee declaring safety-related room coolers and chillers inoperable until an analysis of system operability was completed. This affected their capability to respond to initiating events to prevent undesirable consequences Using Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated June 19, 2012, inspectors determined that this finding was of very low safety significance (Green) because the finding: (1) was not a deficiency affecting the design and qualification of a mitigating structure, system, or component, and did not result in a loss of operability or functionality, (2) did not represent a loss of system and/or function, (3) did not represent an actual loss of function of at least a single train for longer than its allowed outage time, or two separate safety systems out-ofservice for longer than their technical specification allowed outage time, and (4) does not represent an actual loss of function of one or more non-technical specification trains of equipment designated as high safety-significant for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in accordance with the licensees maintenance rule program. This finding has a cross-cutting aspect of resources in the human performance area because the licensee did not ensure that personnel, equipment, procedures, and other resources were available and adequate to support nuclear safety. Specifically, by failing to address water hammer and corrosion issues, station management failed to ensure that the essential service water system was available and adequately maintained to respond during a loss of off-site power event [H.1]. |
Site: | Callaway |
---|---|
Report | IR 05000483/2016002 Section 4OA2 |
Date counted | Jun 30, 2016 (2016Q2) |
Type: | Violation: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | J Drake J Josey J O'Donnell M Langelier N Taylor P Hernandez R Kopriva T Hartman |
Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion XVI |
CCA | H.1, Resources |
INPO aspect | LA.1 |
' | |