05000483/FIN-2016001-02
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Inadequate Operability Evaluation for Degraded Flood Mitigation Capability in Piping Penetration Room |
Description | The inspectors identified a non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the licensees failure to perform an adequate operability determination for safety related components located in the 1988 foot auxiliary building train B piping penetration room (room 1203) based on degraded internal flooding drain capability. Specifically, the immediate operability determination included incorrect assumptions that were not verified to support the operability determination as required by Procedure ODP-ZZ-00001, Addendum 15, Operability and Functionality Determinations, Revision 8. The immediate corrective action was to implement a compensatory measure to support operability of the equipment in room 1203. The issue was placed in the corrective action program as Callaway Action Request 201601412. The licensees failure to verify assumptions used in the immediate operability determination and ensure a sound basis for operability exists per plant procedures was a performance deficiency. The performance deficiency is more than minor, and therefore a finding, because it is similar to examples 3.j and 3.k in Inspection Manual Chapter 0612, Appendix E, Examples of Minor Issues, and if left uncorrected, it has the potential to lead to a more significant safety concern. Specifically, failure to perform adequate operability evaluations by verifying assumptions and ensuring a sound basis for operability exists may result in the failure to enter the appropriate limiting conditions of operation for technical specification equipment. Using Inspection Manual Chapter 0609, Appendix A, Exhibit 2, Mitigating Systems Screening Questions, the finding involved the degradation of equipment specifically designed to mitigate a flooding initiating event, therefore, Exhibit 4, External Events Screening Questions, was used to complete the screening. The finding was determined to need a detailed risk evaluation because if the equipment (i.e., floor drain lines) is assumed to be completely failed or unavailable, it would degrade one or more trains of a system that supports a risk significant system or function. In consultation with the Senior Reactor Analyst, the finding was determined to be of very low safety significance because, based on the actual condition of the drains and the extent of the clogging in room 1203, an evaluation by the licensee showed that the maximum internal flooding water level in the room would not challenge the operability of any equipment needed for safe shutdown or to mitigate an accident. This finding has a team work cross-cutting aspect in the human performance cross-cutting area because individuals and work groups did not communicate and coordinate their activities within and across organizational boundaries to ensure nuclear safety is maintained. Specifically, inadequate communication between engineering and operations personnel led to the belief that a passageway existed between rooms 1203 and 1204 when it did not [H.4]. |
Site: | Callaway |
---|---|
Report | IR 05000483/2016001 Section 1R06 |
Date counted | Mar 31, 2016 (2016Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.06 |
Inspectors (proximate) | D Bradley D Proulx J Melfi M Langelier N Taylor P Elkmann S Alferink S Janicki T Hartman W Sifre |
Violation of: | 10 CFR 50 Appendix B Criterion V Technical Specification Technical Specification - Procedures |
CCA | H.4, Teamwork |
INPO aspect | PA.3 |
' | |