05000483/FIN-2010003-03
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Ensure Completion of Corrective Actions for Degraded Chemical and Volume Control System Valves |
Description | The inspectors identified a finding associated with AmerenUEs failure to take prompt corrective actions for leaking boundary valves in the chemical and volume control system. On April 13, 2010, an attempt to place the train A chemical and volume control system mixed bed in service resulted in leakage past a documented leaking drain valve. The lingering equipment problems resulted in an unplanned 25 gallon per minute loss rate of volume control tank inventory and an emergency action level declaration for excessive reactor coolant system leakage. Later, the declaration was retracted. The licensee placed this issue into the corrective action program as Callaway Action Request 201003146
This finding is more than minor because it was associated with the reactor safety Initiating Events Cornerstone attribute of configuration control and affected the objective to limit the likelihood of events that upset plant stability. Using Manual Chapter 0609.04, Phase 1 - Initial Screening and Characterization of Findings, the inspectors determined that this finding is of very low significance because the condition did not result in the reactor coolant system technical specification leakage limit being exceeded, did not contribute to both the likelihood of a reactor trip and the likelihood that mitigating equipment or functions would be unavailable, and did not increase the likelihood of a fire or internal/external flood. This finding, which involved inadequate scheduling of corrective action related jobs, has a crosscutting aspect in the area of human performance associated with the work control component because AmerenUE did not appropriately coordinate work activities to address the impact of the work on different job activities. |
Site: | Callaway |
---|---|
Report | IR 05000483/2010003 Section 4OA3 |
Date counted | Jun 30, 2010 (2010Q2) |
Type: | Finding: Green |
cornerstone | Initiating Events |
Identified by: | NRC identified |
Inspection Procedure: | IP 71153 |
Inspectors (proximate) | D Dumbacher B Henderson C Graves J Adams G Miller A Fairbanks J Groom T Buchanan D Reinert N Hernandez J Braisted N Greene |
CCA | H.5, Work Management |
INPO aspect | WP.1 |
' | |