05000482/FIN-2009005-08
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Inadequate Operability Evaluation of Essential Service Water Pumps |
| Description | On November 5, 2009, inspectors identified a noncited violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to perform an adequate operability evaluation required by procedure. The inspectors identified that Operability Evaluation EF 09-010, Revisions 0 and 1, did not demonstrate that the essential service water pumps could withstand a safe shutdown earthquake. Revision 2 of the operability evaluation included calculations to demonstrate acceptable stresses and included pump impeller clearances. This issue is captured in the corrective action program as condition reports 22798 and 21572. The failure to perform an adequate operability evaluation per Procedures AP 28-001 and AP 26C 004 was a performance deficiency. The inspectors determined that this finding was more than minor because it is associated with the equipment performance attribute of the Mitigating Systems Cornerstone, and it affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). Specifically, this issue relates to the availability and reliability examples of the equipment performance attribute because a latent common mode failure mechanism was not correctly evaluated. The inspectors evaluated the significance of this finding using Phase 1 of Inspection Manual Chapter 0609, Appendix A, and determined that the finding was of very low safety significance (Green) because the issue was not a design or qualification deficiency confirmed to result in loss of operability or functionality, did not represent a loss of system safety function, an actual loss of safety function of a single train for greater than its technical specification allowed outage time, an actual loss of safety function of a nontechnical specification risk-significant equipment train, and did not screen as potentially risk significant due to a seismic, flooding, or severe weather initiating event. The cause of the finding has a problem identification and resolution crosscutting aspect associated with the corrective action program because Wolf Creek failed to thoroughly evaluate the failure mechanism such that the resolutions address the causes and extent of conditions, as necessary P.1.c] (Section 1R15) |
| Site: | Wolf Creek |
|---|---|
| Report | IR 05000482/2009005 Section 1R15 |
| Date counted | Dec 31, 2009 (2009Q4) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.15 |
| Inspectors (proximate) | G Vasquez J Drake P Jayroe R Kopriva S Alferink A Fairbanks C Alldredge C Cauffman C Long C Peabody D Graves D Loveless G Miller |
| CCA | P.2, Evaluation |
| INPO aspect | PI.2 |
| ' | |
Finding - Wolf Creek - IR 05000482/2009005 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|