Title | Inadequate Testing Results in P-6 Interlock Failure to Energize Source Range on Reactor Trip |
Description | On April 28, 2009, the inspectors identified a noncited violation of Technical Specification, Table 3.3.1-1, Function 18.a, when Wolf Creek tripped from 100 percent reactor power. During the trip, intermediate range neutron Detector NI-36 did not decrease below 10 E -10 amps and energize source range Detector NI-32. The inspectors determined that postmaintenance testing of the new detector during the previous refueling outage was insufficient and caused the detector to be undercompensated. A postmaintenance testing deficiency was not evaluated. After the reactor trip, this issue was entered into the corrective action program but was closed to pending recalibration of the detector. The deficiency for Function 18.a was entered into the corrective action program after the inspectors questioning. The inspectors determined that the failure to ensure that the P-6 interlock was operable per the technical specification as defined in the bases was a performance deficiency. The finding was more than minor because it was associated with the configuration control attribute of the Barrier Integrity cornerstone, and it affected the cornerstone objective to provide reasonable assurance that physical design barriers (fuel cladding, reactor coolant system, and containment) protect the public from radionuclide releases caused by accidents or events. Specifically, it affected the reactivity control area (reactor control systems) of the cornerstones attribute. The inspectors evaluated the significance of this finding under the Mitigating Systems cornerstone using Phase 1 of Inspection Manual Chapter 0609.04, and determined that the finding screened to Green because the P-6 interlock only affected the fuel barrier. This issue has been entered into the corrective action program as Condition Report 00017814. The cause of this finding was determined to have a crosscutting aspect in the problem identification and resolution area associated with the corrective action program because postmaintenance testing of Procedure STN IC-236 identified deficiencies as well as the post trip review; however, this did not result in initiation of condition reports and subsequent evaluation |
Site: | Wolf Creek |
---|---|
Report | IR 05000482/2009003 Section 4OA3 |
Date counted | Jun 30, 2009 (2009Q2) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | IP 71153 |
Inspectors (proximate) | G Guerra B Tharakan B Tindell C Long V Gaddy C Peabody P Jayroe |
CCA | P.1, Identification |
INPO aspect | PI.1 |
' | |
Finding - Wolf Creek - IR 05000482/2009003 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Wolf Creek) @ 2009Q2