| Q | CCA | Title |
---|
05000482/FIN-2008002-05 | 2008Q1 | H.13 | Failure to follow procedure |
05000482/FIN-2008002-09 | 2008Q1 | | Failure to reestablish timely seal cooling for the reactor coolant pumps. |
05000482/FIN-2008002-06 | 2008Q1 | H.14 | Failure to establish reasonable expectation of operability. |
05000482/FIN-2008002-02 | 2008Q1 | H.4 H.5 | Performing prohibited elective maintenance on offsite power during EDG maintenance. |
05000482/FIN-2008002-01 | 2008Q1 | H.11 H.12 | Failure to implement fire protection impairment control permit requirements and compensatory measures. |
05000482/FIN-2008006-06 | 2008Q1 | P.3 | Failure to Take Timely Corrective Action to Correct Barton Transmitter Defects |
05000482/FIN-2008006-05 | 2008Q1 | P.2 P.1(a) | Failure to Take Timely Corrective Action to Correct Annunciator Feed Configuration Deficiencies. |
05000482/FIN-2008006-04 | 2008Q1 | P.3 | Failure to Take Timely Corrective Action To Establish Monitoring Frequency of AFW Pump Governor Null Set Drift |
05000482/FIN-2008006-02 | 2008Q1 | P.3 | Failure to Take Corrective Action For Missed Compensatory Measures |
05000482/FIN-2008006-01 | 2008Q1 | H.14 | Twenty-One Examples of Failure to Follow Seismic Requirements of Scaffolding Procedure |
05000482/FIN-2008002-10 | 2008Q1 | | Failure to analyze motor-operated valve circuits. |
05000482/FIN-2008002-07 | 2008Q1 | H.2(a) H.6 | Untimely corrective actions for CCP room cooler leads to NOED. |
05000482/FIN-2008002-04 | 2008Q1 | H.5 | Failure to control area as a locked high radiation area. |
05000482/FIN-2008002-08 | 2008Q1 | | Transformer trip resulted in an unplanned eractor trip and forced outage. |
05000482/FIN-2008002-03 | 2008Q1 | | Containment sump net positive suction head losses. |
05000482/FIN-2008006-03 | 2008Q1 | P.3 | Failure to Take Corrective Actions For Missed Operability Evaluation |
05000482/FIN-2008003-06 | 2008Q2 | P.2 | Failure to Verify Engineering Design Calculation Prior to Use |
05000482/FIN-2008003-05 | 2008Q2 | H.7 | Inadequate Switchyard Work Proceudre Resulted in a Loss of Offsite Power |
05000482/FIN-2008003-03 | 2008Q2 | H.7 | Inadequate Containment Sump Inspection Procedure |
05000482/FIN-2008003-02 | 2008Q2 | P.3 | Failure to Establish Goals and Monitor for a(1) ECCS Room |
05000482/FIN-2008003-01 | 2008Q2 | P.3 | Failure to Implement Transient Combustible Control Permit Requirements for a Propane Tank |
05000482/FIN-2008003-04 | 2008Q2 | H.13 | Troubleshooting Activities Bypass Design Control for the Fuel Transfer System |
05000482/FIN-2008003-07 | 2008Q2 | H.7 | Inadequate Transformer Procedure Resulted in an Unplanned Reactor Trip and Forced Outage |
05000482/FIN-2008004-04 | 2008Q3 | H.7 | Emergency diesel generator lube oil heat exchanger leak due to water hammer |
05000482/FIN-2008004-05 | 2008Q3 | P.3 | Water hammer caused by loss of offsite power exceeds heat exchanger bolt yield strength |
05000482/FIN-2008004-02 | 2008Q3 | P.2 | Use of hammer to reduce accumulator check valve leakage |
05000482/FIN-2008004-03 | 2008Q3 | P.2 | Failure to adequately evaluate submerged safety-related cables |
05000482/FIN-2008004-07 | 2008Q3 | | Inadequate Reactor vessel head vent |
05000482/FIN-2008004-06 | 2008Q3 | P.3 | Failure to completely close the spent fuel pool valve resulted in a loss of spent fuel pool water inventory. |
05000482/FIN-2008004-01 | 2008Q3 | H.4 H.5 | Incompatible procedures result in 6400 gallon drain of spent fuel pool |
05000482/FIN-2008004-08 | 2008Q3 | | Diesel generator low frequency and voltage variation not considered in calculations |
05000482/FIN-2008009-01 | 2008Q3 | H.7 | Failure to Provide an Accurate Shipping Manifest |
05000482/FIN-2008010-02 | 2008Q4 | | Failure to Ensure a Fire Pump Would Automatically Start for One Fire Area |
05000482/FIN-2008010-05 | 2008Q4 | | Operator Actions Affect the Ability to Operate Post-Fire Safe Shutdown Equipment |
05000482/FIN-2008005-03 | 2008Q4 | H.13 | Equipment Out-of-Service Log Definitions Redefined Outside of Procedure Change Process |
05000482/FIN-2008005-01 | 2008Q4 | H.14 | Maintenance Causes Unplanned Increase in Reactor Power |
05000482/FIN-2008005-02 | 2008Q4 | | Residual Heat Removal Suction Piping Saturation Temperature and Pressure |
05000482/FIN-2008010-04 | 2008Q4 | | Operator Actions May Create the Potential for Secondary Fires |
05000482/FIN-2008010-03 | 2008Q4 | | Changes to the Approved Fire Protection Program May Not Meet NRC Acceptance Criteria |
05000482/FIN-2008010-01 | 2008Q4 | | Post-Fire Safe Shutdown Procedure did Not Identify Diagnostic Instrumentation |
05000482/FIN-2008010-06 | 2008Q4 | | Failure to Evaluate Changes to the Approved Fire Protection Program |