05000461/FIN-2016009-04
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Failure to Verify the Adequacy of Design Assumptions Related to Time Critical Operator Actions |
| Description | The team identified a finding of very-low safety significance (Green) and an associated NCV of 10 CFR Part 50, Appendix B, Criterion III, Design Control, for the licensee failure to verify the adequacy of design assumptions related to time critical operator actions made in calculations associated with the control room HVAC and RHR emergency SFP cooling functions. Subsequently, it was determined that operators did not fully understand the control room HVAC system operational demands and that the operational assumptions of the RHR emergency SFP cooling design were unrealistic. The licensee captured these issues into the CAP as AR 02739012, AR 03943566, and AR 02741909; reasonably demonstrated that SFP makeup sources would be available to cope with a prolonged loss of SFP cooling; conducted operator training; and provided refined procedural guidance to ensure the control room HVAC system would be operated consistent with the design assumptions. The performance deficiency was determined to be more-than-minor because it was associated with the Barrier Integrity cornerstone attribute of human performance and adversely affected the cornerstone objective of providing reasonable assurance that physical design barriers protect the public from radionuclide releases caused by accidents or events. Specifically, the pilot validations of the control room HVAC system operational assumptions demonstrated a significant reduction in margin due to, in part, a lack of operator understanding of the operational assumptions. Additionally, a preliminary review of procedures associated with SFP cooling and RHR determined the operational assumptions of the calculation related to RHR emergency SFP cooling were not bounding. The team determined that this finding was of very low safety significance (Green). Specifically, the control room HVAC system finding example only represented a degradation of the radiological barrier function provided for the control room in that it did not affect the control room barrier function against smoke or a toxic atmosphere. In addition, the finding example related to emergency SFP cooling did not cause SFP temperature to exceed the maximum analyzed limit, a detectible release of radionuclides, water inventory to decrease below the analyzed limit, or an adverse effect to the SFP neutron absorber or fuel loading pattern. The team determined that the finding had a cross-cutting aspect in the area of Human Performance because the operation and engineering organizations did not effectively communicate and coordinate their respective roles in developing the control room HVAC system validation in a manner that supported nuclear safety. |
| Site: | Clinton |
|---|---|
| Report | IR 05000461/2016009 Section 1R21 |
| Date counted | Dec 31, 2016 (2016Q4) |
| Type: | NCV: Green |
| cornerstone | Barrier Integrity |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.21 |
| Inspectors (proximate) | J Benjamin J Robbins L Rodriguez M Jeffers N Feliz-Adorno |
| Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion III, Design Control |
| CCA | H.4, Teamwork |
| INPO aspect | PA.3 |
| ' | |