| Q | CCA | Title |
---|
05000458/FIN-2015001-01 | 2015Q1 | H.11 | Failure to Perform Adequate Operability Evaluations on Degraded High Pressure Core Spray System |
05000458/FIN-2015001-03 | 2015Q1 | H.4 | Failure to Operate Condensate Demineralizer System Following Reactor Scram Results in Loss of All Feedwater |
05000458/FIN-2015001-02 | 2015Q1 | H.4 | Inadequate Engineering Change and Work Instruction Review Results in Reactor Recirculation Pump Trip |
05000458/FIN-2015009-01 | 2015Q2 | | Vendor and Industry Recommended Testing Adequacy on Safety-related and Safety-significant Circuit Breakers |
05000458/FIN-2015009-05 | 2015Q2 | P.2 | Failure of the Plant-Referenced Simulator to Demonstrate Expected Plant Response |
05000458/FIN-2015002-02 | 2015Q2 | | Failure to Maintain Design Control for 18 Upgraded Hydraulic Control Unit Accumulators |
05000458/FIN-2015009-06 | 2015Q2 | H.8 | Failure to Identify and Classify Operator Workarounds that Impacted Scram Recovery Actions |
05000458/FIN-2015009-04 | 2015Q2 | H.12 | Failure to Identify High Reactor Water Level as a Condition Adverse to Quality |
05000458/FIN-2015009-03 | 2015Q2 | P.2 | Failure to Provide Adequate Procedures for Post-scram Recovery |
05000458/FIN-2015406-01 | 2015Q2 | H.9 | Security |
05000458/FIN-2015002-01 | 2015Q2 | | Inadequate Operating Margin for Reactor Protection System A Motor Generator Set for Overvoltage Protection Results in Loss of Shutdown Cooling |
05000458/FIN-2015009-02 | 2015Q2 | P.2 | Failure to Establish Adequate Procedures to Perform Maintenance on Equipment that can Affect Safety-Related Equipment |
05000458/FIN-2015406-02 | 2015Q2 | H.14 | Security |
05000458/FIN-2015406-03 | 2015Q2 | H.1 | Security |
05000458/FIN-2015008-01 | 2015Q3 | H.1 | Failure to Recognize Violations of Contamination Control Requirements as Adverse Conditions |
05000458/FIN-2015008-02 | 2015Q3 | H.9 | Failure to Promptly Document Adverse Conditions in the Corrective Action Program |
05000458/FIN-2015003-01 | 2015Q3 | H.12 | Failure to Operate the Unit 1 Feedwater System In Accordance With Procedures |
05000458/FIN-2015405-01 | 2015Q3 | | Security |
05000458/FIN-2015008-04 | 2015Q3 | H.1 | Failure to Identify an Adverse Trend in the Performance of Post Maintenance Testing on High Critical Components |
05000458/FIN-2015008-03 | 2015Q3 | H.2 | Failure to Preclude Repetition of Consequential Gaps in Operator Performance |
05000458/FIN-2015007-02 | 2015Q4 | | Failure to Obtain Prior NRC Approval for a Change in Reactor Core Isolation Cooling Injection Point |
05000458/FIN-2015403-01 | 2015Q4 | | Security |
05000458/FIN-2015004-01 | 2015Q4 | H.8 | Failure to Ensure Work Hours are Within Work Hour Limits |
05000458/FIN-2015004-02 | 2015Q4 | H.3 | Failure to Properly Implement Surveillance Testing of Penetration Valve Leakage Control System Leads to Inoperability in Excess of Technical Specification Allowed Outage Time |
05000458/FIN-2015004-03 | 2015Q4 | H.5 | Failure to Conduct Operations and Control Work Practices to Minimize Residual Radioactivity into the Site, including the Subsurface |
05000458/FIN-2015004-05 | 2015Q4 | H.12 | Failure to Follow Procedure Results in Inadvertent Draindown of Reactor Pressure Vessel |
05000458/FIN-2015004-06 | 2015Q4 | H.8 | Failure to Restore Main Steam Positive Leakage Control System to Operable Prior to Changing Modes |
05000458/FIN-2015004-04 | 2015Q4 | | Failure to Make a Notification to NRC Operations Center Regarding a Radioactive Spill Reported to Another Government Agency |
05000458/FIN-2015007-01 | 2015Q4 | P.1 | Failure to Establish Adequate Procedures for Severe Weather Operations |