| Q | CCA | Title |
---|
05000458/FIN-2014007-01 | 2014Q3 | P.1 | Improper Sequencing of Maintenance of 4160 Vac Circuit Breakers Prior to As-Found Tests |
05000458/FIN-2014007-02 | 2014Q3 | H.6 | Failure to Complete and Justify Extension of Preventative Maintenance on Division III 4160 Vac Safety Related Breakers |
05000458/FIN-2014007-03 | 2014Q3 | H.14 | Failure to Perform an Adequate Operability Determination for Missed Preventive Maintenance on Safety-Related Circuit Breakers |
05000458/FIN-2014007-04 | 2014Q3 | P.3 | Failure to Correct Identified Negative Safety Margin in Design Documents for Reactor Core Isolation Cooling Valves under Postulated High Energy Line Break Conditions |
05000458/FIN-2014007-05 | 2014Q3 | P.2 | Failure to Promptly Correct Adverse Conditions Associated with Non-cited Violation 05000458/2011008-06 |
05000458/FIN-2014004-01 | 2014Q3 | H.12 | Failure to Provide Positive Exposure Control Within A Locked High Radiation Area |
05000458/FIN-2014005-01 | 2014Q4 | H.8 | Failure to Retain Scenario-Based Testing Documentation |
05000458/FIN-2014005-02 | 2014Q4 | | Failure to Lubricate Residual Heat Exchanger Bypass Valves |
05000458/FIN-2014302-01 | 2014Q4 | H.7 | Inadequate System Operating Procedures with Two Examples |
05000458/FIN-2015001-01 | 2015Q1 | H.11 | Failure to Perform Adequate Operability Evaluations on Degraded High Pressure Core Spray System |
05000458/FIN-2015001-03 | 2015Q1 | H.4 | Failure to Operate Condensate Demineralizer System Following Reactor Scram Results in Loss of All Feedwater |
05000458/FIN-2015001-02 | 2015Q1 | H.4 | Inadequate Engineering Change and Work Instruction Review Results in Reactor Recirculation Pump Trip |
05000458/FIN-2015009-01 | 2015Q2 | | Vendor and Industry Recommended Testing Adequacy on Safety-related and Safety-significant Circuit Breakers |
05000458/FIN-2015002-02 | 2015Q2 | | Failure to Maintain Design Control for 18 Upgraded Hydraulic Control Unit Accumulators |
05000458/FIN-2015009-06 | 2015Q2 | H.8 | Failure to Identify and Classify Operator Workarounds that Impacted Scram Recovery Actions |
05000458/FIN-2015009-04 | 2015Q2 | H.12 | Failure to Identify High Reactor Water Level as a Condition Adverse to Quality |
05000458/FIN-2015009-03 | 2015Q2 | P.2 | Failure to Provide Adequate Procedures for Post-scram Recovery |
05000458/FIN-2015002-01 | 2015Q2 | | Inadequate Operating Margin for Reactor Protection System A Motor Generator Set for Overvoltage Protection Results in Loss of Shutdown Cooling |
05000458/FIN-2015009-02 | 2015Q2 | P.2 | Failure to Establish Adequate Procedures to Perform Maintenance on Equipment that can Affect Safety-Related Equipment |
05000458/FIN-2015406-03 | 2015Q2 | H.1 | Security |
05000458/FIN-2015406-02 | 2015Q2 | H.14 | Security |
05000458/FIN-2015406-01 | 2015Q2 | H.9 | Security |
05000458/FIN-2015009-05 | 2015Q2 | P.2 | Failure of the Plant-Referenced Simulator to Demonstrate Expected Plant Response |