| Q | CCA | Title |
---|
05000416/FIN-2011002-02 | 2011Q1 | | Failure to Update Available Low Pressure Coolant Injection Loops in the Updated Final Safety Analysis Report |
05000416/FIN-2011002-01 | 2011Q1 | H.8 | Transient Combustible Stored in the Fire Exclusion Zone Near the Independent Spent Fuel Storage Installation |
05000416/FIN-2011002-03 | 2011Q1 | H.13 | Failure to Demonstrate Maintenance Effectiveness of Train B Control Room Air Conditioner |
05000416/FIN-2011002-04 | 2011Q1 | | Failure to Use a Qualified Radiation Protection Technician to Provide Direct Continuous Coverage of Work in a Locked High Radiation Area |
05000416/FIN-2011002-05 | 2011Q1 | P.2 | Failure to Prevent Recurrence of Control Room Air Conditioner Compressor Tripping Due to Low Oil Pressure |
05000416/FIN-2011002-06 | 2011Q1 | H.2 | Inadequate Design Control for the Mitigation Monitoring System Modification |
05000416/FIN-2011003-05 | 2011Q2 | P.5 | Failure to Provide Adequate Procedures for High Pressure Core Spray Minimum Flow Valve Surveillance Testing |
05000416/FIN-2011003-08 | 2011Q2 | H.12 | Failure to Follow a Procedure Resulting in the Inoperability of the Reactor Core Isolation Cooling System Primary Containment Isolation Valve |
05000416/FIN-2011003-07 | 2011Q2 | H.12 | Failure to Assure Configuration Control of Safety Related Systems |
05000416/FIN-2011003-06 | 2011Q2 | H.9 | Loose Fuse Clips in Division 3 Emergency Diesel Generator |
05000416/FIN-2011003-04 | 2011Q2 | P.1 | Failure to Ensure that Safety Related Manholes were Properly Sealed to Prevent the Entry of Flammable Liquid |
05000416/FIN-2011003-03 | 2011Q2 | H.7 | Failure to Identify Conditions Adverse to Fire Protection |
05000416/FIN-2011003-02 | 2011Q2 | H.2 | Failure to Follow Scaffold Control Procedure |
05000416/FIN-2011003-01 | 2011Q2 | H.9 | Failure to Perform an Adequate Inspection of Probable Maximum Precipitation Door Seals Protecting Safety Related Equipment |
05000416/FIN-2011004-01 | 2011Q3 | | Failure to Ensure Correct Fuses were Installed in the Hydrogen Igniter Control Circuits |
05000416/FIN-2011004-02 | 2011Q3 | P.5 P.2(b) | Failure to Perform Preventative Maintenance on the Fuel Handling Bridge Paddle Switch |
05000416/FIN-2011004-03 | 2011Q3 | | Failure to Establish Preventative Maintenance for Components Used in Critical Applications |
05000416/FIN-2011007-04 | 2011Q3 | | Inadequate Corrective Actions To Assure Postfire Safe Shutdown |
05000416/FIN-2011007-03 | 2011Q3 | H.13 | Failure to Take Timely Corrective Actions to Protect Safe Shutdown Equipment From Fire Damage |
05000416/FIN-2011007-02 | 2011Q3 | | Failure To Assure Equipment Required For Postfire Safe Shutdown Was Protected Against Fire Damage |
05000416/FIN-2011007-01 | 2011Q3 | | Failure To Provide An Adequate Alternative Shutdown Procedure |
05000416/FIN-2011403-01 | 2011Q4 | | Security |
05000416/FIN-2011006-04 | 2011Q4 | P.2 | Inadequate Corrective Action for a Leak on the Division II Emergency Diesel Generator Lube Oil Sump |
05000416/FIN-2011006-03 | 2011Q4 | H.7 | Failure to Document a Condition as a Significant Condition Adverse to Quality |
05000416/FIN-2011006-01 | 2011Q4 | H.14 | Failure to Take Timely Corrective Actions for Reactor Core Isolation Cooling System Venting |
05000416/FIN-2011005-01 | 2011Q4 | H.7 | Failure to Perform an Adequate Inspection of Probable Maximum Precipitation Door Seals Protecting Safety Related Equipment |
05000416/FIN-2011006-02 | 2011Q4 | | Failure to Report a Condition Prohibited by Technical Specifications |