| Q | CCA | Title |
---|
05000395/FIN-2010005-01 | 2010Q4 | P.2 | Failure to Correct Condition Adverse to Quality Involving Inadequate EDG Engine Driven Pump Preventative Maintenance |
05000395/FIN-2010006-01 | 2010Q4 | P.2 | Failure to maintain safety related cables in a nonsubmerged environment |
05000395/FIN-2011006-07 | 2011Q2 | | Failure to Use the Most Limiting Design Inputs in an Electrical Calculation |
05000395/FIN-2011003-03 | 2011Q2 | | Failure to Conduct Adequate Testing of Appendix R Fire Switches |
05000395/FIN-2011003-04 | 2011Q2 | | Inadvertent Safety Injection in Mode 3 Due to Opening C Main Steam Isolation Valve |
05000395/FIN-2011006-09 | 2011Q2 | | Failure to Adequately Account for the In-rush Current of the 7.2 kV Breaker Spring Charging Motors in a Safety-related Battery Voltage Drop Calculation |
05000395/FIN-2011006-08 | 2011Q2 | H.2(a) H.6 | Failure to Implement Timely Corrective Actions to Address Design Bases Requirements for SGTR Event |
05000395/FIN-2011003-01 | 2011Q2 | H.5 | Failure to Adequately Assess and Manage Risk of Switchyard Maintenance Activities During Lowered RCS Inventory Conditions |
05000395/FIN-2011006-06 | 2011Q2 | | Failure to Properly Test Emergency Feedwater Pump Discharge Check Valves |
05000395/FIN-2011006-05 | 2011Q2 | | Failure to Develop a Procedure to Ensure an Emergency Diesel Generator Alarm Device was Calibrated or Tested |
05000395/FIN-2011006-04 | 2011Q2 | | Failure to Verify Adequacy of the Suction Lift for the Fuel Oil Transfer Pumps |
05000395/FIN-2011006-03 | 2011Q2 | | Failure to Adequately Calculate Motor Actuator Output Torque and Control Circuit Voltages for MOVs |
05000395/FIN-2011006-02 | 2011Q2 | | Failure to Correctly Translate the Design Basis into Procedures for Low EDG Air Pressure and Low Thermal Barrier Heat Exchanger Flow |
05000395/FIN-2011006-01 | 2011Q2 | | Failure to Develop Procedures to Provide Starting Air to EDGs During a SBO Event |
05000395/FIN-2011003-02 | 2011Q2 | | Failure to Perform ISI General Visual Examinations of Containment Moisture Barrier Associated with Containment Liner Leak Chase Test Connection Threaded Pipe Plugs |
05000395/FIN-2011202-01 | 2011Q3 | H.1 | Security |
05000395/FIN-2011202-02 | 2011Q3 | | Security |
05000395/FIN-2011501-01 | 2011Q3 | | Adequacy of Procedures to Assess and Monitor Emergency Radiological Releases |
05000395/FIN-2011004-01 | 2011Q3 | H.8 | Failure to Implement a Procedure for Manipulation of the C Main Steam Isolation Valve |