05000395/FIN-2011006-04
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Verify Adequacy of the Suction Lift for the Fuel Oil Transfer Pumps |
Description | The team identified a non-cited violation (NCV) of 10 CFR 50, Appendix B, Criterion III, Design Control, for the licensees failure to establish design control measures to verify or check the adequacy of design inputs used to determine the required suction lift of the EDGs fuel oil transfer pumps. Specifically, the licensee used non-conservative pressure drops and atmospheric pressure values to determine the available suction lift required at the pumps suction in order to transfer the fuel oil from the bottom of the underground fuel storage tanks to the day tanks. The licensee entered these issues into their corrective action program as CR-11-00565 and performed an evaluation to confirm the ability of the pumps to transfer the required volume of fuel. The licensees failure to adequately account for pressure losses, flow rates and atmospheric conditions in a safety-related calculation was a performance deficiency. The performance deficiency was more than minor because it adversely affected the mitigating systems cornerstone attribute of design control and adversely affected the cornerstone objective to ensure the availability, reliability and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the deficiencies in Calculation DC06630-004 resulted in a reasonable doubt that the fuel oil transfer pump could deliver the TS required volume of 48,500 gallons; because, if the maximum allowed differential pressure of 2.5 psig had been realized, and combined with the uncertainties associated with the measuring equipment, the pump would have been unable to transfer the required volume of fuel. In accordance with NRC IMC 0609.04, Initial Screening and Characterization of Findings , the inspectors conducted a Phase 1 SDP screening and determined the finding to be of very low safety significance (Green) because it was a design deficiency confirmed not to result in the loss of operability or functionality. A cross-cutting aspect was not identified because the finding does not represent current performance. |
Site: | Summer |
---|---|
Report | IR 05000395/2011006 Section 1R21 |
Date counted | Jun 30, 2011 (2011Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.21 |
Inspectors (proximate) | D Jones D Mas-Penaranda M Yeminy S Sandal B Desai J Eargle |
INPO aspect | |
' | |