Finding | |
---|---|
Title | Failure to Properly Test Emergency Feedwater Pump Discharge Check Valves |
Description | The team identified a non-cited violation (NCV) of 10 CFR Part 50, Appendix B, Criterion XI, Test Control for the licensees failure to establish a test program that demonstrated the operability of EFW pump discharge check valves. The test procedure was inadequate to provide reasonable assurance that the check valves would (1) not allow reverse flow sufficient to rotate its pump backwards, (2) not allow reverse flow that would over pressurize its pumps suction piping and, (3) not allow reverse flow that would lower the forward flow to a value below the required flow to the steam generators. This issue was entered into the licensees corrective action program as CR-11-00556. The team determined that the licensees development of an inadequate procedure to test safety-related check valves was a performance deficiency. This performance deficiency is more than minor because it affected the mitigating systems cornerstone attribute of ensuring the availability, reliability, and capability of safety systems that respond to initiating events. Specifically, the licensee failed to develop a test procedure that would reliably ascertain that the steam generators were not deprived of design bases flow via a leaking check valve. In accordance with NRC IMC 0609.04, Initial Screening and Characterization of Findings , the inspectors conducted a Phase 1 SDP screening and determined the finding to be of very low safety significance (Green) because it was not a design issue resulting in loss of function, it did not represent an actual loss of a system safety function, it did not result in exceeding a Technical Specification allowed outage time, and it did not affect external event mitigation. A cross-cutting aspect was not identified because the finding does not represent current performance. |
Site: | Summer ![]() |
---|---|
Report | IR 05000395/2011006 Section 1R21 |
Date counted | Jun 30, 2011 (2011Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.21 |
Inspectors (proximate) | D Jones D Mas-Penaranda M Yeminy S Sandal B Desai J Eargle |
INPO aspect | |
' | |
Finding - Summer - IR 05000395/2011006 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Summer) @ 2011Q2
Self-Identified List (Summer)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||