| Q | CCA | Title |
---|
05000382/FIN-2017010-01 | 2017Q3 | | Failure to Evaluate Departures from Approved Methodologies for Reactor Vessel Fluence |
05000382/FIN-2017008-01 | 2017Q4 | | Three examples of Failure to Establish and Maintain Preventive Maintenance Procedures for Safety-Related Electrical Equipment |
05000382/FIN-2017008-02 | 2017Q4 | H.11 | Failure to Meet RG 1.9 Emergency Diesel Testing Requirements during Surveillance Test Results in Missed Surveillance |
05000382/FIN-2017008-03 | 2017Q4 | | Two Examples of Failure to Submit and Receive Prior Authorization of Alternatives to ASME OM Code Leak Testing Requirements |
05000382/FIN-2017008-04 | 2017Q4 | | Potential Failure to Obtain a License Amendment for Changes to Diesel Generator Surveillance Test Interval |
05000382/FIN-2017403-01 | 2017Q4 | P.6 | Security |
05000382/FIN-2018001-01 | 2018Q1 | | Failure to Obtain NRC Staff Authorization Prior to Changing a Procedure that Impacts Implementation of Technical Specifications |
05000382/FIN-2018002-01 | 2018Q2 | H.12 | Failure to Ensure Appropriate Chemistry Controls on the Component Cooling Water Heat Exchangers |
05000382/FIN-2018002-02 | 2018Q2 | | 10 CFR 50.59 Evaluation Associated with Emergency Feedwater Logic Modification |
05000382/FIN-2018404-01 | 2018Q2 | P.1 | Security |