05000346/FIN-2013003-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Operations Communications and Work Coordination Error Results in Service Water System Transient |
Description | A self-revealed finding of very low safety significance (Green) and associated NCV of TS 5.4.1(a) were identified when the licensee failed to properly implement plant procedures for placing Component Cooling Water (CCW) Pump 3 in spare status. Specifically, the licensee did not isolate service water (SW) to the standby CCW heat exchanger prior to racking out the CCW Pump 3 breaker. As a result, SW Train 1 header pressure significantly dropped, an automatic isolation of SW cooling and realignment to circulating water cooling from Turbine Plant Cooling Water (TPCW) occurred, and the licensee entered the Loss of SW Abnormal Operating procedure. The condition was corrected, and corrective action documents were generated to review the event. The inspectors determined that the licensees failure to implement procedures for placing CCW Pump 3 in spare status was a performance deficiency that was reasonably within the licensees ability to foresee and correct and should have been prevented. This finding was associated with the Initiating Events Cornerstone of reactor safety and was of more than minor significance because it directly impacted the cornerstone objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. The inspectors evaluated the finding using IMC 0609, Appendix A, The Significance Determination Process for Findings At-Power. Using Exhibit 1, which contains the screening questions for the Initiating Events Cornerstone of reactor safety, the inspectors determined that the finding screened as very low safety significance (Green), because it did not adversely impact any accident, transient, support system loss, steam generator tube rupture, or external event initiators. |
Site: | Davis Besse |
---|---|
Report | IR 05000346/2013003 Section 1R19 |
Date counted | Jun 30, 2013 (2013Q2) |
Type: | NCV: Green |
cornerstone | Initiating Events |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71111.19 |
Inspectors (proximate) | J Cameron P Smagacz T Briley J Steffes S Bell M Phalen D Kimble J Laughlin |
Violation of: | Technical Specification - Procedures Technical Specification |
CCA | H.10, Bases for Decisions |
INPO aspect | CO.2 |
' | |
Finding - Davis Besse - IR 05000346/2013003 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Davis Besse) @ 2013Q2
Self-Identified List (Davis Besse)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||