| Q | CCA | Title |
---|
05000346/FIN-2011005-04 | 2011Q4 | | Reactivity Manipulations Performed By Non-Licensed IndividuaL |
05000346/FIN-2011005-01 | 2011Q4 | H.2 | Inadequate Control of Weld Filler Metal Electrodes |
05000346/FIN-2011005-02 | 2011Q4 | H.5 | Decay Heat Pump 1-1 Damaged and Rendered Inoperable By Personnel Climbing on Equipment |
05000346/FIN-2011005-03 | 2011Q4 | H.7 | Air Voids in Component Cooling Water System Caused By Inadequate Fill and Vent Procedure |
05000346/FIN-2011005-05 | 2011Q4 | H.7 | Inadequate Information on Valve Interlocks Resulted in Inadvertent Operation and Loss of Component Cooling Water Surge Tank Inventory |
05000346/FIN-2011005-06 | 2011Q4 | P.3 | Inadequate Procedure Resulted in Water Intrusion Into Safety-Related Motor Control Center |
05000346/FIN-2011005-07 | 2011Q4 | H.14 | Incomplete Surface Examination of the RRVCH |
05000346/FIN-2011407-01 | 2011Q4 | H.14 | Security |
05000346/FIN-2012002-01 | 2012Q1 | H.5 | Seismic Instrumentation Unavailable for Emergency Event Classification |
05000346/FIN-2012002-02 | 2012Q1 | | Failure to Maintain SAFETY-RELATED DC Systems Design Control |
05000346/FIN-2012003-01 | 2012Q2 | H.5 | Oil Sample Drawn from Running RCP Resulted in Entry Into Abnormal Operating Procedure and RCP Shutdown |
05000346/FIN-2012402-01 | 2012Q2 | H.9 | Security |
05000346/FIN-2012403-01 | 2012Q3 | | Security |
05000346/FIN-2012405-01 | 2012Q3 | | Security |
05000346/FIN-2012004-01 | 2012Q3 | H.12 | Operator Error Restoring Essential MCC to Service Renders TS Equipment Inoperable |
05000346/FIN-2012004-02 | 2012Q3 | | Failure to Use Material Specified Minimum Yield Stress in Structural Design |