| Q | CCA | Title |
---|
05000346/FIN-2012403-01 | 2012Q3 | | Security |
05000346/FIN-2012405-01 | 2012Q3 | | Security |
05000346/FIN-2012004-01 | 2012Q3 | H.12 | Operator Error Restoring Essential MCC to Service Renders TS Equipment Inoperable |
05000346/FIN-2012004-02 | 2012Q3 | | Failure to Use Material Specified Minimum Yield Stress in Structural Design |
05000346/FIN-2012005-01 | 2012Q4 | P.3 | Operator Error in Response to a Small Power Transient Momentarily Renders TS Equipment Inoperable |
05000346/FIN-2012008-01 | 2012Q4 | | Impact of a high energy line break in the turbine building on safety-related electrical equipment located in the switchgear rooms |
05000346/FIN-2013002-01 | 2013Q1 | H.5 | Failure to Maintain Station Blackout Diesel Generator Output Cables in an Environment Consistent with Design |
05000346/FIN-2013002-02 | 2013Q1 | H.12 | Containment Isolation Valve Rendered Inoperable by Wrong Component Operator Error |
05000346/FIN-2013403-01 | 2013Q1 | | Security |
05000346/FIN-2013405-01 | 2013Q1 | | Security |
05000346/FIN-2013405-02 | 2013Q1 | | Security |
05000346/FIN-2013405-03 | 2013Q1 | | Security |
05000346/FIN-2013405-04 | 2013Q1 | | Security |
05000346/FIN-2013405-05 | 2013Q1 | | Security |