05000346/FIN-2009005-02
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | AFW Pump 1 Operability with Removed Insulation |
| Description | The inspectors identified a finding of very low safety significance and associated NCV of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the removal of insulation from auxiliary feedwater pump 1 turbine inlet piping which was left uninstalled for approximately 2 weeks without engineering review required by procedure. Corrective action was to replace the insulation. The finding is more than minor because it was associated with the mitigating systems cornerstone attribute of equipment performance and affected the cornerstone objective of ensuring the availability, reliability, and capability of the auxiliary feedwater system train 1 which is designed to respond to initiating events to prevent undesirable consequences. Specifically, the removal of insulation from the auxiliary feedwater system would cause additional heat to escape from the turbine during operation and could cause reduction in assumed life of environmentally qualified (EQ) equipment within the room associated with the auxiliary feedwater system. The inspectors determined that the finding was of very low safety significance because it did not result in any inoperability of required equipment and did not screen as potentially risk significant due to a seismic, flooding, or severe weather initiating event. This finding has a cross-cutting aspect in the area of human performance, work control component, because the licensee did not appropriately coordinate auxiliary feedwater leak inspection activities and incorporate actions to address the operational impact of work activities. Specifically, the licensee did not consider, in the removal of insulation on auxiliary feedwater train 1, procedure requirements provided to ensure that insulation removal activities did not have unnecessary detrimental effects on EQ equipment (H.3(b)). (Section 1R15 |
| Site: | Davis Besse |
|---|---|
| Report | IR 05000346/2009005 Section 1R15 |
| Date counted | Dec 31, 2009 (2009Q4) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.15 |
| Inspectors (proximate) | J Rutkowski A Wilson F Mccreesh R Russell J Cameron |
| CCA | H.5, Work Management |
| INPO aspect | WP.1 |
| ' | |
Finding - Davis Besse - IR 05000346/2009005 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Davis Besse) @ 2009Q4
Self-Identified List (Davis Besse)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||