Finding | |
---|---|
Title | Missing Relay Cover Results in Inadvertent Emergency Diesel Generator Actuation |
Description | A self-revealing, non-cited violation (NCV) of 10 CFR 50 Appendix B Criterion XVI Corrective Action was identified for failure to promptly identify and correct a missing cover on a safety-related under-voltage relay. The licensees failure to identify the missing relay cover on the 27X4 relay during the extent of condition review performed for condition report 406045 was a performance deficiency. Procedure PSL-01.05, Apparent Cause Evaluation (ACE) Handbook Section 7.6, dated July 30, 2008, provided the guidance for the required extent of condition review. The licensee added signage on the electrical cabinet door warning of the relay hazard, additional actions to determine the extent of condition and replace the relay cover is planned. The finding was determined to be more than minor because it affected the human performance attribute of the Initiating Events cornerstone and affected the cornerstone objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. Specifically, without the relay cover installed, the relay was more vulnerable to actuation as a result of unintentional contact and a loss of the 1B3 vital 4 kV electrical bus occurred which required an unnecessary start and loading of the 1B EDG. The finding screened as Green because none of the attributes in the Manual Chapter 0609 Appendix G Attachment 1 Shutdown Operations Significance Determination Process Phase 1 Operational Checklist 3 were adversely impacted. The primary contributor to this conclusion was the licensees risk management controls which did not allow work in the train which was being relied upon for shutdown cooling. As a result, there was no loss of shutdown cooling for the event. There is no cross cutting aspect for the finding because the finding does not represent current licensee performance because the relay cover has been missing for several years. |
Site: | Saint Lucie |
---|---|
Report | IR 05000335/2012005 Section 4OA2 |
Date counted | Dec 31, 2012 (2012Q4) |
Type: | NCV: Green |
cornerstone | Initiating Events |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | G Kuzo R Reyes T Morrissey J Hickey J Laughlin T Hoeg R Carrion S Sandal P Capehart W Pursley |
INPO aspect | |
' | |
Finding - Saint Lucie - IR 05000335/2012005 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|