| Q | CCA | Title |
---|
05000272/FIN-2012012-01 | 2012Q4 | | Failure to provide complete and accurate decommissioning status reports |
05000272/FIN-2012005-01 | 2012Q4 | H.5 | Failure to Maintain Adequate Liquid CO2 Inventory for Fire Suppression |
05000272/FIN-2013002-01 | 2013Q1 | H.8 | Failure to Correct Condition Adverse to Quality in Service Water Check Valve |
05000272/FIN-2013002-02 | 2013Q1 | H.7 | Failure to Install the Correct Size Zinc Anode in 11 Service Water Strainer Results in Strainer Trip |
05000272/FIN-2013002-03 | 2013Q1 | H.5 | Inadequate Relay Testing Instructions Cause Loss of One Offsite Power Source |
05000272/FIN-2013002-04 | 2013Q1 | H.12 | Inadvertent Isolation of Service Water to All Edgs in Mode 6 |
05000272/FIN-2013002-05 | 2013Q1 | H.14 | Failure to Implement Feedwater Control Valve Corrective Actions |
05000272/FIN-2013003-01 | 2013Q2 | P.4 | Inadequate Corrective Actions to Address an Adverse Trend in the 2R1B-2 Radiation Monitor |
05000272/FIN-2013003-02 | 2013Q2 | | Incorrect Component Installed for Containment Closure |
05000272/FIN-2013003-03 | 2013Q2 | | Failure to Evaluate Unit 2 Service Water Accumulator Discharge Valve IST Not Meeting Acceptance Criteria |
05000272/FIN-2013003-04 | 2013Q2 | H.8 | Scaffold Installed with Insufficient Separation to SAFETY-RELATED Equipment |
05000272/FIN-2013003-05 | 2013Q2 | H.5 | Failure to Follow Radiation Protection Procedures to Identify and Control Access to Locked High Radiation Area |
05000272/FIN-2013003-06 | 2013Q2 | | Failure to Follow the Loss of Main Condenser Vacuum Procedure |
05000272/FIN-2013004-01 | 2013Q3 | P.5 | Inadequate Maintenance Procedure to Reconsolidate Pressurizer Spray Valve Pack |
05000272/FIN-2013008-01 | 2013Q3 | P.1 | Failure to Evaluate Performance Deficiency for FIN 2011004-02 |
05000272/FIN-2013008-02 | 2013Q3 | | 13 Switchgear and Penetration Area Ventilation Supply Fan Motor Bearing Failure due to Deletion of Preventative Maintenance Requirement |