Finding | |
---|---|
Title | Inadequate Procedure OP-880B for Turbine Building Post-Fire Safe Shutdown |
Description | The inspectors identified a non-cited violation of Crystal River Unit 3 (CR3) Technical Specification 5.6.1.1.a., for inadequate guidance in procedure OP-880B, Appendix R Turbine Building Post-Fire Safe Shutdown Information. Specifically, the procedure could not have been performed as written because it did not identify the appropriate equipment that was to be manipulated to ensure that the reactor coolant pumps remained de-energized after being secured in the event of a fire in turbine building Fire Zones TB-95-400A, TB-119-400E, or TB- 145-400F. Additionally, procedure OP-880B did not provide adequate guidance regarding how CR3 operators would communicate with Crystal River Unit1/Unit 2 (CR1/CR2) operators, and did not specify if a reliable means of communications was available. The licensee initiated nuclear condition reports 460602, and 461736 to address this issue. The inspectors determined that inadequate safe shutdown procedure guidance was a performance deficiency. This finding was more than minor because it was associated with the procedure quality attribute of the mitigating systems cornerstone and it affected the cornerstone objective of protection against external events (i.e., fire). The inspectors assessed this finding using NRC Inspection Manual Chapter 0609, Appendix F, Fire Protection Significance Determination Process. The inspectors determined that this finding was of very low safety significance (Green) because during the time that procedure OP-880B was issued and in effect (April 16, 2010, to April 22, 2011), CR3 was in cold shutdown and procedure OP-880B was not applicable. The inspectors determined that the cause of this finding had a cross-cutting aspect in the Human Performance Area, Work Control Component, in that, the licensee did not address the need for CR3 work groups to maintain interfaces with offsite organizations (i.e., CR1/CR2), to communicate and coordinate with each other during activities in which interdepartmental coordination was necessary to ensure plant and human performance. |
Site: | Crystal River |
---|---|
Report | IR 05000302/2011008 Section 1R05 |
Date counted | Jun 30, 2011 (2011Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.05 |
Inspectors (proximate) | N Merriweather M Thomas J Munday L Suggs J Dymek |
CCA | H.5, Work Management |
INPO aspect | WP.1 |
' | |