05000302/FIN-2010004-03
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Submit Production Splices of Swaged Mechanical Splices for the Testing |
Description | The inspectors identified a finding of very low safety significance and an associated NCV of 10 CFR Part 50, Appendix B, Criterion IX, Control of Special Processes, for the licensees failure to establish measures to assure that testing of rebar splices would adhere to the requirements of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code. Specifically, licensee procedures for containment building repairs did not accommodate rebar production splice testing, which was required by Code. As part of their immediate corrective actions, the licensee revised their procedures to include production splice testing and also entered the issue into their corrective action program. The inspectors determined that the finding was more than minor because it was associated with the human performance attribute of the barrier systems cornerstone and affected the cornerstone objective of ensuring the reliability of containment wall barrier system. Failure to adhere to ASME Code testing requirements can adversely affect assurance that the rebar splices would meet strength requirements as part of the containment barrier. The inspectors completed a Phase 1 screening of the finding using Inspection Manual Chapter 0609, Significance Determination Process, Attachment 4, Phase 1 - Initial Screening and Characterization of Findings and determined that the performance deficiency represented a finding of very low safety significance (Green). Specifically, the finding did not result in the actual loss of function of the Unit 3 Containment Wall. This finding has a cross-cutting aspect in the area of Human Performance under the Effectiveness Reviews aspect of the Decision-Making component because the licensee failed to validate assumptions used as a basis for their decision to pursue an alternative testing plan. H.1(b) |
Site: | Crystal River |
---|---|
Report | IR 05000302/2010004 Section 4OA5 |
Date counted | Sep 30, 2010 (2010Q3) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | |
Inspectors (proximate) | L Lake M Franke R Carriond Riche Crowe R Chou R Reyes T Morrissey |
CCA | H.14, Conservative Bias |
INPO aspect | DM.2 |
' | |
Finding - Crystal River - IR 05000302/2010004 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Crystal River) @ 2010Q3
Self-Identified List (Crystal River)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||