| | Q | CCA | Title |
|---|
| 05000302/FIN-2010002-01 | 2010Q1 | | Failure to Take Compensatory Actions When a MCR to CSR Floor/Ceiling Interface Access Hatch Was Open. |
| 05000302/FIN-2010003-01 | 2010Q2 | | Degraded Fire/Flood Barriers |
| 05000302/FIN-2010007-01 | 2010Q3 | H.7 | Preconditioning of Safety-Related Air Operated Valves |
| 05000302/FIN-2010007-02 | 2010Q3 | | Failure to Incorporate Requirements of Recovering from a Station Blackout into Calculations |
| 05000302/FIN-2010007-03 | 2010Q3 | | Failure to Monitor the Service Water and Decay Cooling Expansion Tank Check Valves |
| 05000302/FIN-2010004-01 | 2010Q3 | | Flood Calculations did not Reflect Plant Configuration |
| 05000302/FIN-2010004-02 | 2010Q3 | P.2 | Inoperable Fire Barrier Penetration Seals |
| 05000302/FIN-2010004-03 | 2010Q3 | H.14 | Failure to Submit Production Splices of Swaged Mechanical Splices for the Testing |
| 05000302/FIN-2010402-01 | 2010Q3 | H.8 | Security |
| 05000302/FIN-2010201-01 | 2010Q4 | | Security |