05000298/FIN-2010005-02
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Failure to Assess and Manage Risk for Electrical Switchyard Impacting Maintenance |
| Description | The inspectors identified a noncited violation of 10 CFR 50.65(a)(4), Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, for the failure of operations and work control personnel to adequately assess and manage risk associated with a planned maintenance activity. Specifically, on December 7, 2010, operations and work control personnel failed to adequately assess maintenance activities involving the use of a crane in the plants electrical switchyard. Following the inspectors identification of this issue, the licensee adequately assessed and managed the increase in risk for the maintenance activities. The issue was entered into the licensees corrective action program as Condition Report CR-CNS-2010-9146. The failure to perform an adequate risk assessment for planned maintenance activities was a performance deficiency. As such, the finding was more minor because it affected the protection against external factors attribute of the Initiating Events Cornerstone. Additionally, if left uncorrected the practice of not properly evaluating crane activities in the stations switchyard would have the potential to lead to a more significant safety concern, in that, it could result in a more than minimal increase in risk associated with other risk important equipment that would not be identified nor result in appropriate actions being taken to mitigate this increase in risk. The inspectors determined that the licensee does not maintain a probabilistic risk analysis model that incorporates the electrical switchyard, and as such, an incremental core damage probability cannot be estimated for the plant conditions that existed at the time of the performance deficiency. For this reason, the inspectors determined that Manual Chapter 0609, Appendix K, Maintenance Risk Assessment and Risk Management Significance Determination Process, Flowchart 2, could not be used to determine the risk significance the finding. Using the qualitative review process of Manual Chapter 0609, Appendix M, Significance Determination Process Using Qualitative Criteria, the finding is determined to have very low safety significance because the finding did not result in any additional loss of defense in depth systems. This finding had a crosscutting aspect in the area of human performance associated with decision making, in that, the licensee failed to use conservative assumptions in their decision making and adopt a requirement to demonstrate that the proposed action is safe in order to proceed rather than a requirement to demonstrate that it is unsafe in order to disapprove the action. |
| Site: | Cooper |
|---|---|
| Report | IR 05000298/2010005 Section 1R13 |
| Date counted | Dec 31, 2010 (2010Q4) |
| Type: | NCV: Green |
| cornerstone | Initiating Events |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.13 |
| Inspectors (proximate) | G Guerra P Elkmann J Josey V Gaddy M Chambers E Ruesch |
| CCA | H.14, Conservative Bias |
| INPO aspect | DM.2 |
| ' | |