05000293/FIN-2015004-04
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | |
| Description | A self-revealing Green NCV of Title 10 of the Code of Federal Regulations (10 CFR) 50, Appendix B, Criterion III, Design Control, was identified because Entergy did not use the correct work planning and design controls to repair the support for the nitrogen supply line for the 1C inboard main steam isolation valve (MSIV). Specifically, inadequate design controls led to a failed horizontal unistrut support for the nitrogen supply line to the 1C MSIV, resulting in the header resting on the main steam line. This caused vibration-induced cyclic failure of the nitrogen supply line, closure of 1C MSIV, and a plant scram. The damaged line was modified and repaired using an additional unistrut for support as determined by the engineering change process. Entergy entered the issue into the corrective action program (CAP) under condition report (CR) 2015- 07285. This finding is more than minor because it is associated with the Initiating Events cornerstone attribute of equipment performance and adversely affected the cornerstone objective of limiting the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. Specifically, the failure of the pneumatic supply header support resulted in a plant scram due to the vibration induced cyclic failure of the nitrogen supply line and subsequent closure of 1C MSIV. In accordance with IMC 0609.04 and Exhibit 1 of IMC 0609, Appendix A, the inspectors determined that this finding was of very low safety significance (Green) because the finding did not involve the complete or partial loss of a support system that contributes to the likelihood of, or cause, an initiating event and affect mitigation equipment. The inspectors determined this finding does not have a cross-cutting aspect because the performance deficiency occurred in 2001 and is not indicative of current performance. |
| Site: | Pilgrim |
|---|---|
| Report | IR 05000293/2015004 Section 4OA3 |
| Date counted | Dec 31, 2015 (2015Q4) |
| Type: | NCV: Green |
| cornerstone | Initiating Events |
| Identified by: | Self-revealing |
| Inspection Procedure: | IP 71153 |
| Inspectors (proximate) | A Allen A Burritt B Dionne B Scrabeck E Carfang J Deboer J Pfingstein P Presby T Dunn T Fish T Hedigan S Elkhiamy |
| Violation of: | 10 CFR 50 Appendix B Criterion III, Design Control |
| INPO aspect | |
| ' | |
Finding - Pilgrim - IR 05000293/2015004 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Pilgrim) @ 2015Q4
Self-Identified List (Pilgrim)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||