Finding | |
|---|---|
| Title | Failure to Identify the Cause of a Significant Condition Adverse to Quality |
| Description | The inspectors identified a Green NCV of 10 CFR 50, Appendix B, Criterion XVI, Corrective Actions, when Entergy did not determine the cause of a significant condition adverse to quality (SCAQ). Specifically, a causal evaluation was not performed for a failed safety-related relay that ensured the automatic operation of the low pressure coolant injection (LPCI) system injection valves in a degraded voltage condition. Entergy replaced the failed relay and restored LPCI to an operable status on May 10, 2015. Entergy entered the issue into the CAP as CR 2015-9762. This finding is more than minor because it is associated with the Mitigating System cornerstone attribute of equipment performance and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). The failure to identify the cause and extent of condition of the relay failure as directed by site procedures could result in repeat events which adversely affect safety system availability. In accordance with IMC 0609.04 and Exhibit 2 of IMC 0609, Appendix A, the inspectors determined that this finding was of very low safety significance (Green) because the finding did not involve the design of a mitigating structure, system, or component (SSC) or a loss of function of a train or system for greater than the technical specification (TS) allowed outage time. The inspectors determined this finding has a cross-cutting aspect in Human Performance, Procedure Adherence, because individuals did not recatergorize the CR to a higher level requiring a causal evaluation, as required by EN-LI-102 when a licensee event report (LER) was issued. The site also did not retain the failed safety-related part, as required by EN-MA-101-02. |
| Site: | Pilgrim |
|---|---|
| Report | IR 05000293/2015004 Section 4OA3 |
| Date counted | Dec 31, 2015 (2015Q4) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71153 |
| Inspectors (proximate) | A Allen A Burritt B Dionne B Scrabeck E Carfang J Deboer J Pfingstein P Presby T Dunn T Fish T Hedigan S Elkhiamy |
| Violation of: | 10 CFR 50 Appendix B Criterion XVI Technical Specification - Procedures Technical Specification |
| CCA | H.8, Procedure Adherence |
| INPO aspect | WP.4 |
| ' | |