Title | Inadequate Testing of the Diesel-Driven Air Compressor |
Description | A self-revealing Green finding was identified for Entergys failure to verify that the diesel-driven air compressor (K-117) was available for service prior to the January 27, 2015 winter storm. Specifically, although K-117 was tested prior to the winter storm, the test methodology did not reveal that the capacity of the starting battery was inadequate. The failure to verify that the diesel-driven air compressor (K-117) was available for service prior to the January 27, 2015 winter storm is a performance deficiency that was within Entergys ability to foresee and correct. This resulted in a loss of instrument air during the plant trip which complicated the event response. Entergy entered the issue into the corrective action program (CAP) as condition report (CR)-PNP-2015-00559 and initiated actions to supply instrument air with a temporary air compressor. Entergy also revised the operability test for K-117 air compressor to remove the alternating current (AC) power source prior to starting the air compressor. This self-revealing issue was more than minor because it is associated with the procedure quality and design control attributes of the Initiating Events cornerstone and adversely impacted the cornerstone objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. Specifically, failure of K-117 resulted in loss of instrument air, which adversely impacted the plant response during the January 27, 2015 winter storm. Additionally, this issue is also associated with the procedure quality and design control attributes of the Mitigating Systems cornerstone and affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating event to prevent undesirable consequences. The inspectors screened the issue under the Initiating Events cornerstone using Attachment 4 and Exhibit 1 of Appendix A to IMC 0609, Significance Determination Process, because that cornerstone was determined to be more impacted by the finding than the Mitigating Systems cornerstone. The inspectors concluded that a detailed risk evaluation would be required because the finding involved the complete loss of a support system (instrument air) that contributes to the likelihood of an initiating event and affects mitigation equipment. A senior reactor analyst performed a detailed risk evaluation of this issue. The NRC model for PNPS was adjusted to account for a loss of the instrument air compressor on a LOOP. The change in core damage frequency was very low. A review of the dominant accident sequences indicated the contribution from a large early release and from external risk contributors to be very small. Therefore, the issue was determined to be of very low risk significance (Green). The finding had a cross-cutting aspect in the area of Human Performance, Design Margins, because Entergy failed to ensure that the K-117 battery was designed with adequate margin. This finding is reflective of current performance because the inadequate design margin of the battery should have been discovered through proper testing. |
Site: | Pilgrim |
---|---|
Report | IR 05000293/2015007 Section 4OA5 |
Date counted | Mar 31, 2015 (2015Q1) |
Type: | Finding: Green |
cornerstone | Initiating Events |
Identified by: | Self-revealing |
Inspection Procedure: | IP 93812 |
Inspectors (proximate) | C Cahill D Schroeder E Burket E Dipaolo H Nieh J Lilliendahl S Pindale T Dunn |
CCA | H.6, Design Margins |
INPO aspect | WP.2 |
' | |